scholarly journals Roof Weakening of Hydraulic Fracturing for Control of Hanging Roof in the Face End of High Gassy Coal Longwall Mining: A Case Study

2016 ◽  
Vol 61 (3) ◽  
pp. 601-615 ◽  
Author(s):  
Bingxiang Huang ◽  
Youzhuang Wang

Abstract The occurence of hanging roof commonly arises in the face end of longwall coal mining under hard roof conditions. The sudden break and subsequent caving of a hanging roof could result in the extrusion of gas in the gob to the face, causing gas concentrations to rise sharply and to increase to over a safety-limited value. A series of linear fracturing-holes of 32 mm diameter were drilled into the roof of the entries with an anchor rig. According to the theory that the gob should be fully filled with the fragmentized falling roof rock, the drilling depth is determined as being 3~5 times the mining height if the broken expansion coefficient takes an empirical value. Considering the general extension range of cracks and the supporting form of the entryway, the spacing distance between two drilling holes is determined as being 1~2 times the crack’s range of extension. Using a mounting pipe, a high pressure resistant sealing device of a small diameter-size was sent to the designated location for the high-pressure hydraulic fracturing of the roof rock. The hydraulic fracturing created the main hydro-fracturing crack and airfoil branch cracks in the interior of the roof-rock, transforming the roof structure and weakening the strength of the roof to form a weak plane which accelerated roof caving, and eventually induced the full caving in of the roof in time with the help of ground pressure. For holes deeper than 4 m, retreating hydraulic fracturing could ensure the uniformity of crack extension. Tested and applied at several mines in Shengdong Mining District, the highest ruptured water pressure was found to be 55 MPa, and the hanging roof at the face end was reduced in length from 12 m to less than 1~2 m. This technology has eliminated the risk of the extrusion of gas which has accumulated in the gob.

Energies ◽  
2021 ◽  
Vol 14 (3) ◽  
pp. 562
Author(s):  
Marek Jendryś ◽  
Andrzej Hadam ◽  
Mateusz Ćwiękała

The following article analyzes the effectiveness of directional hydraulic fracturing (DHF) as a method of rock burst prevention, used in black coal mining with a longwall system. In order to define changes in seismic activity due to DHF at the “Rydułtowy” Black Coal Mine (Upper Silesia, Poland), observations were made regarding the seismic activity of the rock mass during coal mining with a longwall system using roof layers collapse. The seismic activity was recorded in the area of the longwall itself, where, on a part of the runway, the rock mass was expanded before the face of the wall by interrupting the continuity of the rock layers using DHF. The following article presents measurements in the form of the number and the shock energy in the area of the observed longwall, which took place before and after the use of DHF. The second part of the article unveils the results of numerical modeling using the discrete element method, allowing to track the formation of goafs for the variant that does not take DHF into consideration, as well as with modeled fractures tracing DHF carried out in accordance with the technology used at “Rydułtowy” coal mine.


1963 ◽  
Vol 4 (36) ◽  
pp. 809-812
Author(s):  
R. L. Shreve

AbstractIn August 1961 an aluminum pipe (3.5 cm. internal diameter, 4.2 cm. external diameter) having 92 specially modified socket couplings (5.0 cm. external diameter) sealed with a quick-polymerizing synthetic rubber was sunk 226 m. in a vertical water-filled bore hole in Blue Glacier, Washington. U.S.A. The geometry of threads and mating surfaces of pipe and coupling was designed to cause increasing external water pressure to tighten the seal. One joint at a depth of 66 m. immediately developed an extremely slow leak (probably because of faulty cleaning), but the other 91 joints apparently were sound, as the pipe was free of water to a depth of at least 157 m. when resurveyed after one year.


PLoS ONE ◽  
2020 ◽  
Vol 15 (12) ◽  
pp. e0242413
Author(s):  
Youngjoo Lee ◽  
Daesung Kwon ◽  
Changmin Park ◽  
Myoungjae Seo ◽  
TaeWon Seo

The maintenance of buildings has become an important issue with the construction of many high-rise buildings in recent years. However, the cleaning of the outer walls of buildings is performed in highly hazardous environments over long periods, and many accidents occur each year. Various robots are being studied and developed to reduce these incidents and to relieve workers from hazardous tasks. Herein, we propose a method of spraying high-pressure water using a pump and nozzle, which differs from conventional methods. The cleaning performance parameters, such as water pressure, spray angle, and spray distance, were optimized using the Taguchi method. Cleaning experiments were performed on window specimens that were contaminated artificially. The cleaning performance of the proposed method was evaluated using the image-evaluation method. The optimum condition was determined based on the results of a sensitive analysis performed on the image data. In addition, the reaction force due to high pressure and impact force on the specimens were investigated. These forces were not sufficient to affect the propeller thrust or cause damage to the building’s surface. We expect to perform field tests in the near future based on the output of this research.


2021 ◽  
Author(s):  
Joseph Ferrar ◽  
Philip Maun ◽  
Kenneth Wunch ◽  
Joseph Moore ◽  
Jana Rajan ◽  
...  

Abstract We report the design, operation and biogenic souring data from a first-of-its kind suite of High Pressure, High Temperature (HPHT) Bioreactors for hydraulically fractured shale reservoirs. These bioreactors vet the ability of microbial control technologies, such as biocides, to prevent the onset of microbial contamination and reservoir souring at larger experimental volumes and higher pressures and temperatures than have been previously possible outside of field trials. The bioreactors were charged with proppant, crushed Permian shale, and sterile simulated fracturing fluids (SSFF). Subsets of bioreactors were charged with SSFF dosed with either no biocide, tributyl tetradecyl phosphonium chloride (TTPC, a cationic surface-active biocide), or 4,4-dimethyloxazolidine (DMO, a preservative biocide). The bioreactors were shut in under 1,000-2,500 psi and elevated temperatures for up to fifteen weeks; hydrogen sulfide (H2S) and microbial counts were measured approximately once per week, and additional microbes were introduced after weeks three and five. Across two separate studies, the bioreactors containing no biocide soured within the first week of shut-in and H2S concentrations increased rapidly beyond the maximum detectable level (343 ppm) within the first three to six weeks of shut-in. In the first study, the bioreactors treated with TTPC soured within two weeks of shut-in (prior to the first addition of fresh microbes), and H2S concentrations increased rapidly to nearly 200 ppm H2S within the first six weeks of shut-in and beyond the maximum detectable level after fifteen weeks of shut-in. The bioreactors containing DMO did not sour during either study until at least the first addition of fresh microbes, and higher levels of the preservative biocide continued to prevent the biogenic formation of H2S even during and after the addition of fresh microbes. Microbial counts correlate with the H2S readings across all bioreactor treatments. The differentiation in antimicrobial activity afforded by the different types of biocide treatments validates the use of these simulated laboratory reservoirs as a biocide selection tool. This first-of-its-kind suite of HPHT Bioreactors for hydraulic fracturing provides the most advanced biocide selection tool developed for the hydraulic fracturing industry to date. The bioreactors will guide completions and stimulation engineers in biocide program optimization under reservoir-relevant conditions prior to beginning lengthy and expensive field trials.


Processes ◽  
2019 ◽  
Vol 7 (3) ◽  
pp. 134 ◽  
Author(s):  
Weimin Yang ◽  
Zhongdong Fang ◽  
Hao Wang ◽  
Liping Li ◽  
Shaoshuai Shi ◽  
...  

In order to explore the catastrophic evolution process for karst cave water inrush in large buried depth and high water pressure tunnels, a model test system was developed, and a similar fluid–solid coupled material was found. A model of the catastrophic evolution of water inrush was developed based on the Xiema Tunnel, and the experimental section was simulated using the finite element method. By analyzing the interaction between groundwater and the surrounding rocks during tunnel excavation, the law of occurrence of water inrush disaster was summarized. The water inrush process of a karst cave containing high-pressure water was divided into three stages: the production of a water flowing fracture, the expansion of the water flowing fracture, and the connection of the water flowing fracture. The main cause of water inrush in karst caves is the penetration and weakening of high-pressure water on the surrounding rock. This effect is becoming more and more obvious as tunnel excavation progresses. The numerical simulation results showed that the outburst prevention thickness of the surrounding rock is 4.5 m, and that of the model test result is 5 m. Thus, the results of the two methods are relatively close to each other. This work is important for studying the impact of groundwater on underground engineering, and it is of great significance to avoid water inrush in tunnels.


1994 ◽  
Vol 40 (134) ◽  
pp. 119-124
Author(s):  
R.E. Gagnon

AbstractA stainless-steel platen, with a centrally located pressure sensor on the front face, has been used to crush mono-crystalline, bubble-free fresh-water ice samples. Two electrical conductors, located on the face of the pressure sensor, were connected to a bridge circuit so that the presence of liquid between the two conductors could be detected and its thickness measured. Video records of the ice/ steel contact zone during crushing were obtained by mounting samples on a thick Plexiglas plate which permitted viewing through the specimen to the ice/steel interface. Total load and pressure records exhibited a sawtooth pattern due to the compliance of the ice and the testing apparatus, and spalling of ice from the contact zone. When the region of contact was in the vicinity of the pressure transducer, liquid was detected and peaks occurred in the liquid sensor output when load drops occurred. Contact between the platen and the ice consisted of low pressure zones of highly damaged crushed and/or refrozen ice, opaque in appearance, and transparent, high-pressure regions of relatively undamaged ice. Upper limits for the liquid-layer thickness on the high-pressure undamaged ice were ~3 µm on the ascending sides of the sawteeth in the load records and ~ 21 µ on the sharp descending sides.


Energies ◽  
2020 ◽  
Vol 13 (20) ◽  
pp. 5344
Author(s):  
Feng Cui ◽  
Shuai Dong ◽  
Xingping Lai ◽  
Jianqiang Chen ◽  
Chong Jia ◽  
...  

In the inclination direction, the fracture law of a longwall face roof is very important for roadway control. Based on the W1123 working face mining of Kuangou coal mine, the roof structure, stress and energy characteristics of W1123 were studied by using mechanical analysis, model testing and engineering practice. The results show that when the width of W1123 is less than 162 m, the roof forms a rock beam structure in the inclined direction, the floor pressure is lower, the energy and frequency of microseismic (MS) events are at a low level, and the stability of the section coal pillar is better. When the width of W1123 increases to 172 m, the roof breaks along the inclined direction, forming a double-hinged structure, the floor pressure is increased, and the frequency and energy of MS events also increases. The roof gathers elastic energy release, and combined with the MS energy release speed it can be considered that the stability of the section coal pillar is better. As the width of W1123 increases to 184 m, the roof in the inclined direction breaks again, forming a multi-hinged stress arch structure, and the floor pressure increases again. MS high-energy events occur frequently, and are not conducive to the stability of the section coal pillar. Finally, through engineering practice we verified the stability of the section coal pillar when the width of W1123 was 172 m, which provides a basis for determining the width of the working face and section coal pillar under similar conditions.


Sign in / Sign up

Export Citation Format

Share Document