scholarly journals Cost and Time Analysis of the Acceleration Earthworks with the Method of Adding Heavy Equipment to the Depok-Antasari Toll Road Project

2021 ◽  
Vol 2 (6) ◽  
Author(s):  
Irriene Indah Susanti ◽  
Fahmizan Rimawan

The development of Depok-Antasari Toll road construction was delayed by the work  on the  implementation of land work of 30.70%  from the original plan presentation so that  The initially planned time was completed in August 2019 extended to be completed in December 2019. In this study will analyze the acceleration of completion duration on The construction project of Depok–Antasari Toll road with an alternative to the number of heavy equipment. The purpose of this research is to know the cost of project that is physical  and duration of time is  faster by using the alternative. The results of the analysis was obtained  that total project cost under normal conditions is IDR. 9,860,552,249.00 with the duration of project execution 130 working days. In the condition after accelerated with the addition of the number of heavy equipment alternative– 1 obtained a fee of Rp. 10,030,638,486.00 or more expensive 1.02% of the project cost in normal conditions and duration Project execution of 109 business days or faster 21 days from the normal duration. While the total cost of the project in the alternative condition–2 obtained Rp. 10,153,918,103.00 or more expensive 1.04% of the project cost under normal conditions and duration of project execution 104 days or faster 26 days from the normal duration. It can concluded that the acceleration of work by alternative method-1 is a more effective and economical acceleration alternative, because By applying an alternate acceleration–1. The duration of project work is faster than normal circumstances and does not experience a delay of employment from the planned time of 120 days. And the total budget cost of the project is cheaper compared to the alternative acceleration method-2.

Author(s):  
Ni Putu Mega Astiti ◽  
I N. Norken ◽  
IBN. Purbawijaya

Benoa-Bandara-Nusa Dua toll road project is the first toll road project in Bali. This highway connects region Nusa Dua with Benoa Harbour area. Construction of toll roads-Benoa-Bandara-Nusa Dua is claimed as the fastest highway development in Indonesia as completed within 14 months. With time so short that the implementation of development it is necessary to research on the risks that arise in the implementation phase of the construction of the toll road The existence of the risks that arise in the implementation of toll road construction will directly impact the cost and development time. It is necessary in order to study the risks that might occur notably members of the dominant risk category can be used as a basis for decision making by the parties concerned to overcome the negative consequences that occur in the construction of toll roads. The research was conducted by means of interviews with various parties and has expert competence in the implementation of toll road construction to determine how the possibility (likelihood) against a variety of risks and to determine how much influences (Consequences) risk. The number of risks identified in this study was as many as 54 risks. The distribution of revenue risk of the project is a total of 18 (33.33%) classified as unacceptable risk, 25 (46.29%) classified as undesirable risk, 9 (16.67%) classified as acceptable risk, 2 (3.7%) classified as negligible risk. Handling risk (risk mitigation) is only performed on the dominant risks are risks that are categorized as unacceptable and undesirable. Risk mitigation conducted on a total of 18 risk unacceptable risk. 25 risk mitigation undesirable risk. Based on the results of this mitigation is then performed risk management ownership (ownership of risk) to the parties involved in the implementation of toll road construction project.


2021 ◽  
Vol 4 (2) ◽  
pp. 1
Author(s):  
Sentot Tri Wibowo ◽  
Suwarno Suwarno ◽  
Ahmad Ridwan ◽  
Haris Wicaksono ◽  
Fitry Rahmawaty

In a construction project, there are several aspects that cause the project not to go according to plan. Cost and time are aspects that need to be considered to avoid losses incurred in a project. Jombang-ploso-legundi-gresik road project is one of the road widening projects carried out by PT. Mix Pro Indonesia. The project was carried out with the aim that access to (Surabaya-Mojokerto) or further trans Java toll road is quicker safe and smoother. This research aims to optimize the cost and time on the project using the Earned Value method. Calculations include the calculation of ACWP (Actual Cost of Work Performance), BCWS (Budgeted Cost Work Schedule), and BCWP (Budgeted Cost for Work Performed) using the Earned Value method. From these parameters, estimate aspects of cost and time. As well as project analysis of acceleration on a critical trajectory of work. The results of calculations in the 12th week obtained a BCWS value of Rp 1,216,677,846,400 BCWP = Rp 3,040,372,140,080, ACWP = Rp 3,678,560,000. CV value = -Rp 109,203,495.92, SV = Rp 895,646,816.82, CPI = 0.827, and for SPI = 2,499. From these results it can be seen that the CPI value < 1 which means that there are project expenditures that exceed the original plan. With the results, it can be used as a reference in the implementation of project activities.


2021 ◽  
Vol 331 ◽  
pp. 01014
Author(s):  
Yervi Hesna ◽  
Jati Sunaryati ◽  
Ayu Hidayati

The paper provides a thorough examination of the impact of COVID-19 on increasing the cost of the construction project. The pandemic of COVID-19 had disrupted the financial and operational of the construction industry. Many projects have been closed and suspended, and this situation has caused great uncertainty in the construction industry. Even though the Instruction of the Minister of Public Work No. 2/2020 issued March 27, 2020, stated that construction activities in Indonesia could continue work. However, it still believes COVID-19 can lead to poor project cost performance. The study used a literature review to explore the factors contributing to the increase in project cost. A case study in the hotel construction project is used to test the factors. The research found six factors have a frequency of occurrence for each cause of cost overrun, namely labor, material, implementation time, project financial aspects, estimated cost, and occupational health and safety. The case study’s two factors are not the cause of the cost overrun based on the interviewee’s answer: heavy equipment and overhead. This paper also explains the mechanism to address cost overrun continue in construction work.


2018 ◽  
Author(s):  
amiruddin hi muhammad

Implementation of a project work requires not only a reliable human resources, but also must be supported by a good management. Planning project activities is an issue that is very important because it is the basis for project planning in order to be able to finish the projects implemented with time and cost optimal. Method PERT and CPM is a management tool that is associated with the planning and control of costs and time on a project. Both of these methods can be applied in carrying out the project, so that all work can be run according to plan and provide more satisfactory results.The purpose of this study was to evaluate the time and cost Development Project Market Sarimalaha Tidore Islands, North Maluku. In searching for the possibility of achieving time a project that has been planned in the schedule with the analysis using PERT method and analyze the time and cost of the project through the acceleration of activity using CPM method. The data used data is market development project Sarimalaha Tidore Islands..From the research that has been carried out showed that that the possibility of the project is completed in accordance with the Time scedulle based analysis using PERT method amounted to 98.42%. For the analysis of acceleration events with CPM method showed that that the maximum acceleration of the process of acceleration occurs when the project can be accelerated up to 162,17 days from 170 days when the original plan and the cost of the project rose to Rp.8.857.795.386,00 of plan costs prior to acceleration is Rp.8,775,686,914.00. Thus a reduction in project time for 7,83 days and increase the cost of Rp.82.108.472,00 at the time of reaching the maximum acceleration.


2021 ◽  
Vol 2021 (23) ◽  
pp. 31-42
Author(s):  
Anatolii Tsynka ◽  
◽  
Andrii Hrinchuk ◽  
Ivan Rakovych ◽  
◽  
...  

Introduction. In the modern conditions of the pricing system in the construction of Ukraine, the key value have the estimated norms, which are presented in separate collections, the main purpose of which is to determine the standard quantity of resources required to perform a particular type of work as a basis for the transition to the cost indicators. In order to determine the cost of road work objectively and accurately, it is essential that the indicators of estimated norms meet the requirements of regulatory documents and modern methods of execution of road works.Problematics. In connection with the active improvement of the regulatory base of the road construction industry, permanent upgrade of road organizations technique fleet, the introduction of new technologies and materials in construction and operation of roads, improving the methods of work there is a discrepancy between the existing resource element of estimated norms and the actual conditions of work in terms of built-up labor costs, the operation time of machines and mechanisms and the range of materials. Accordingly, it affects the reliability and accuracy of determining the cost of road works.Purpose. Improvement and harmonization with actual working conditions and requirements of regulatory documents of industry regulatory and estimate base of resource elementary estimated norms for work performed during construction, reconstruction, repair and operational maintenance of roads and bridges to ensure reliable and valid technical, economic and estimated calculations.Materials and methods. During work performance the analysis of the regulatory documentation, establishing the requirements to the technology of road works and materials has been carried out. A number of chronometric observations with the measurement of time of road works in full-scale conditions was carried out. The obtained data were summarized, averaged and on their basis the indicators of the resource element of the estimated norms were estimated.Results. A review of the main amendments and additions, which came into force after the approval of Amendment No 2 SOU 42.1-37641918-035:2018 [1] and Amendment No 2 SOU 42.1-37641918-071:2018 [2], which were developed to improve the regulatory-estimate base for the calculation of road works, taking into account the requirements and provisions of existing regulatory documents taking into account the current state of scientific and technological progress in the road sector.Conclusions. The above analysis of the amendments that came into force with the approval of [1]. and [2] will systematize the innovations provided by the requirements of current regulatory documents on the calculation of the cost of road works and the development of relevant documents at all stages of the investment process, planning and organization of road works, as well as the writing-off of material resources. Review and systematization of recent improvements in the estimated regulatory documents for road works will provide an opportunity to optimally plan the use of available material, labor and financial resources, often limited.Keywords: public road, operational maintenance, investment documentation, overhaul and current repairs, machine, mechanism, regulatory document, resource element estimate norm, Standard of Organization of Ukraine.


2015 ◽  
Vol 4 (2) ◽  
pp. 288 ◽  
Author(s):  
Nabil Al-Hazim ◽  
Zaydoun Abusalem

This study aims to identify the most important factors that cause delay in road construction projects in Jordan, which results in cost and time overrun allocated for this type of engineering projects and cause critical problems for both the developer and the contractor. The gap between the cost at completion and that originally estimated, known as cost overrun, can be regarded as one of the most important parameters reflecting the success of projects. In the public sector, money spent on project change orders results in increased construction time which in return reduces the number and size of the projects that can be completed during any given fiscal year. To achieve this goal, the documents and the final reports for several sample projects implemented over the years 2000 to 2008 were analyzed. All the projects were administered by the same organization taken from Jordan Ministry of Rural and Public Works. The results of this study can assist highway officials in their design, planning, scheduling and projects completions so that necessary actions can be taken to control these overruns in future projects. The study showed that 19 factors might cause delays of road construction projects as defined through a detailed literature review. The analysis of the study indicated that the top causes affecting time and cost overrun in road construction projects in Jordan are Terrain and Weather conditions.


Author(s):  
Bašić Marija ◽  
Kranjčić Nikola ◽  
Jug Jasmin ◽  
Đurin Bojan

Roads are important infrastructure facilities that enable traffic accessibility, i.e. they improve the quality of transport communication between people, goods and innovations. The Podravina high-speed road project was designed with the aim of developing Podravina and Slavonia and enabling a better connection between them and the rest of Croatia. Road construction is a complex process that requires a location permit before construction begins. This paper is written with the aim of presenting in detail the process of obtaining a location permit, which is preceded by obligatory preliminary work. Its complexity depends on the type of a road, its purpose and characteristics of the area through which a planned road passes. The Podravina high-speed road is the largest infrastructure project in that part of Croatia and therefore detailed preliminary work is required. This paper describes some types of preliminary work which include geological, geomechanical and climatic tests. The paper presents a project justification study, an environmental impact study, an environmental impact study, a construction and a technical study as well as a spatial transport analysis. Based on the chosen Podravina high-speed road route, a general design was created by using a road design software program “Platea”.


2015 ◽  
Vol 9 (1) ◽  
pp. 40
Author(s):  
Adham Indra Kusuma, Marjono, Fauziah S.C.S Maisarah

One attempt to create a good transport system is the construction of new roads toll roads. A toll road construction soon to be implemented is AA segment a which is of  investment oriented and expected to give profits to the investors. According to the plan, the toll road is 40.5 km long development is divided into 4 sections. Data required to perform financial analysis is the cost of investment, operation and maintenance cost, traffic volume, and the toll rate plans. These data to find the values of the parameters used to calculate the financial analysis include the Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP). The financial analysis will use two funding alternatives, alternative I using 100% equity, alternative II using 30% equity and 70%  loan. The purpose of this study is to determine the results of the financial analysis of the parameter values of highway construction project feasibility and determine the most influential factors after a sensitivity analysis has been made. Based on the financial analysis the investment cost results in IDR 3,827,698,222,645. The financial analysis NPV parameters alternative I results in IDR 661,439,934,962 and alternative II in IDR 230,334,925,350 which means they are feasible because both NPVs are greater than 0; both the IRR of 14.18% for alternative I and 13.02% for alternative II are greater than Minimum Attractive Rate Of Return (MARR) value of 12.42%; so, they are feasible; the value of BCR of alternative I is of 1.13 and alternative II is of 1.04; so, they are feasible because the value of BCR is greater than 1. While the PP of alternative I in the period of 12.1 years and alternative II in the period of 13.5 years. The sensitivity analysis of alternatives I and II result in  the most influential alternative—when construction period experiences ≥ 3 years backwards.Keywords: investment cost, financial analysis, sensitivity analysis.