The Comparison of Tunnel Engineering Construction Methods for Renhechang Tunnel Crossing Underneath Existing Tunnel on Lanzhou-Chongqing Railway

2013 ◽  
Vol 405-408 ◽  
pp. 1330-1333 ◽  
Author(s):  
Chuan Yi Sui ◽  
Xu Dong Zhou ◽  
Lin Hui Wang

Problems often exist in construction of transportation tunnels, such as the effect of new tunnels constructed close to existing structures. Solving this magnificent problem by carefully choosing tunnel construction methods will be beneficial to minimize effects on existing structures while ensuring the newly constructed tunnel is both time-consuming and economical. Three representative engineering methods-the benching tunneling method, the Center Diaphragm method and the Cross Diaphragm method-are compared in controlling the settlement of new tunnel vault and the deformation of the existing tunnel. Finally checking the simulation results by comparing with field measurement data.

2013 ◽  
Vol 368-370 ◽  
pp. 1472-1476 ◽  
Author(s):  
Wei Guo ◽  
Qi Deng ◽  
Xiao Dong Pan

According to the correlation characteristics of risk factors in highway tunnel engineering construction, based on the risk identification and analysis of accidents, the interactive correlations among these risk factors are analyzed by Delphi Method. This paper adopts the decision making trial and evaluation laboratory (DEMATEL) method to analyze the risk of tunnel engineering construction. Then, a comprehensive influencing coefficient of various risk factors is calculated by a comprehensive influencing matrix, the reason-result chart for these risk factors is made, and the key risk factor influencing the tunnel engineering construction is obtained. The result shows that DEMATEL method is effective for the risk analysis of tunnel engineering construction via the case study of Wulong Tunnel construction in China.


2018 ◽  
Vol 2018 ◽  
pp. 1-14 ◽  
Author(s):  
Zhanping Song ◽  
Zhilin Cao ◽  
Junbao Wang ◽  
Shoufeng Wei ◽  
Shichun Hu ◽  
...  

The conversion section of the cross passage and shaft is a priority concern in the stress transformation of a tunnel structure during subway underground excavation. In the construction of Subway Line 5 in Xi'an, China, the main line in the loess layer was constructed through the cross passage from the subway shaft of the Yue Deng Pavilion–San Dian Village Station tunnel section. Numerical simulation and field measurement were adopted to study the construction stability of the cross passage and shaft under two possible construction methods: the “shaft followed by cross passage construction” method and the “cross passage parallel shaft construction” method. The results showed that the surface deformation and plastic zone of the surrounding rock are similar under the two construction methods. However, of the two, the “cross passage parallel shaft construction” method was more advantageous in controlling the structural deformation of the original shaft and the stress distribution of the horsehead structure. The field monitoring data showed that the surface settlements and the deformation of the original shaft structures meet the requirement of control standards under the “cross passage parallel shaft construction” method.


Author(s):  
Nabil Mohareb ◽  
Sara Maassarani

Current architecture studios are missing an important phase in the education process, which is constructing the students’ conceptual ideas on a real physical scale. The design-build approach enables the students to test their ideas, theories, material selection, construction methods, environmental constraints, simulation results, level of space functionality and other important aspects when used by real target clients in an existing context. This paper aims to highlight the importance of using the design-build method through discussing a design project case study carried out by the Masters of Architecture design programme students at Beirut Arab University, who have built prototype units for refugees on a 1:1 scale.


Energies ◽  
2021 ◽  
Vol 14 (5) ◽  
pp. 1265 ◽  
Author(s):  
Johanna Geis-Schroer ◽  
Sebastian Hubschneider ◽  
Lukas Held ◽  
Frederik Gielnik ◽  
Michael Armbruster ◽  
...  

In this contribution, measurement data of phase, neutral, and ground currents from real low voltage (LV) feeders in Germany is presented and analyzed. The data obtained is used to review and evaluate common modeling approaches for LV systems. An alternative modeling approach for detailed cable and ground modeling, which allows for the consideration of typical German LV earthing conditions and asymmetrical cable design, is proposed. Further, analytical calculation methods for model parameters are described and compared to laboratory measurement results of real LV cables. The models are then evaluated in terms of parameter sensitivity and parameter relevance, focusing on the influence of conventionally performed simplifications, such as neglecting house junction cables, shunt admittances, or temperature dependencies. By comparing measurement data from a real LV feeder to simulation results, the proposed modeling approach is validated.


2021 ◽  
Vol 230 ◽  
pp. 109057
Author(s):  
Mohammad Adibzade ◽  
Mehdi Shafieefar ◽  
Hassan Akbari ◽  
Roozbeh Panahi

2013 ◽  
Vol 734-737 ◽  
pp. 759-763 ◽  
Author(s):  
Yong Li ◽  
Yun Yi Zhang ◽  
Ren Jie Gao ◽  
Shuai Tao Xie

Jixi mine area is one of the early mined areas in China and it's a typical deep mine. Because of large deformation of underground roadway and dynamic disasters occurred frequently in this mine, five measurement points of in-situ stress in this mine was measured and then analyzed with inversion. Based on these in-situ stress measurement data, numerical model of 3D in-situ stress back analysis was established. According to different stress fields, related analytical samples of neural network were given with FLAC program. Through the determination of hidden layers, hidden nodes and the setting of parameters, the network was optimized and trained. Then according to field measurement of in-situ stress, back analysis of initial stress field was conducted. Compared with field measurement, with accuracy requirement satisfied, it shows that the in-situ stress of rock mass obtained is basically reasonable. Meanwhile, it proves that the measurement of in-situ stress can provide deep mines with effective and rapid means, and also provide reliable data to optimization of deep roadway layout and supporting design.


2012 ◽  
Vol 268-270 ◽  
pp. 664-672
Author(s):  
Ya Ting Sun ◽  
Zhi Rong Mei ◽  
Jun Wei Zhang

The conventional mucking system of tunnel construction in China has a series of deficiencies and stubborn problems. Tunnel mucking technologies matched with different tunnel construction methods have been analyzed systematically and the continuous belt mucking methodology which is appropriated with drilling-blasting method was presented. The continuous belt mucking technology includes mucking scheme design and mucking equipment configuration. Compared with the conventional mucking methods, the comprehensive benefit can be fully demonstrated by the new continuous belt mucking system. On the other hand, the predominance on environmental protection of the continuous belt mucking technoloty matches up with the conservation policy. The technology would be widely applied in long tunnels and tunnels embedded in frozen ground and located in bitter cold plateau. The economic benifis and contribution to society of continuous belt mucking technology would be remarkable.


2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Qing Dong ◽  
Zheng-hua Zhou ◽  
Su Jie ◽  
Bing Hao ◽  
Yuan-dong Li

At engineering practice, the theoretical basis for the cross-over method, used to obtain shear wave arrival time in the downhole method of the wave velocity test by surface forward and backward strike, is that the polarity of P-wave keeps the same, while the polarity of S-wave transforms when the direction of strike inverted. However, the characteristics of signals recorded in tests are often found to conflict with this theoretical basis for the cross-over method, namely, the polarity of the P-wave also transforms under the action of surface forward and backward strike. Therefore, 3D finite element numerical simulations were conducted to study the validity of the theoretical basis for the cross-over method. The results show that both shear and compression waves are observed to be in 180° phase difference between horizontal signal traces, consistent with the direction of excitation generated by reversed impulse. Furthermore, numerical simulation results prove to be reliable by the analytic solution; it shows that the theoretical basis for the cross-over method applied to the downhole wave velocity test is improper. In meanwhile, numerical simulations reveal the factors (inclining excitation, geophone deflection, inclination, and background noise) that may cause the polarity of the P-wave not to reverse under surface forward and backward strike. Then, as to reduce the influence factors, we propose a method for the downhole wave velocity test under surface strike, the time difference of arrival is based between source peak and response peak, and numerical simulation results show that the S-wave velocity by this method is close to the theoretical S-wave velocity of soil.


2016 ◽  
Vol 10 (4) ◽  
pp. 310-315 ◽  
Author(s):  
Sławomir Duda ◽  
Damian Gąsiorek ◽  
Grzegorz Gembalczyk ◽  
Sławomir Kciuk ◽  
Arkadiusz Mężyk

Abstract This paper presents a novel mechatronic device to support a gait reeducation process. The conceptual works were done by the interdisciplinary design team. This collaboration allowed to perform a device that would connect the current findings in the fields of biomechanics and mechatronics. In the first part of the article shown a construction of the device which is based on the structure of an overhead travelling crane. The rest of the article contains the issues related to machine control system. In the prototype, the control of drive system is conducted by means of two RT-DAC4/PCI real time cards connected with a signal conditioning interface. Authors present the developed control algorithms and optimization process of the controller settings values. The summary contains a comparison of some numerical simulation results and experimental data from the sensors mounted on the device. The measurement data were obtained during the gait of a healthy person.


Sign in / Sign up

Export Citation Format

Share Document