scholarly journals Financing Roads through Tolls in Nigeria: The Role of Public-Private Partnerships

2021 ◽  
Vol 06 (06) ◽  
Author(s):  
Dr. George Nwangwu ◽  

Nearly 18 years after the Government of Nigeria dismantled toll plazas along the country’s highways, there is renewed interest by the present administration to re-introduce toll roads to help finance the construction, repairs and maintenance of the highways. This has been met with predictable opposition from different interest groups around the country. This paper notes that using tolls as a means of financing highways is not a particularly bad strategy, as there are several benefits that could accrue to the country from its use. However, the manner in which the proposed tolling appears to be structured will not resolve all the issues bedevilling the Nigerian road sector. For greater impact and sustainability, the financing of some of the major roads should be done in partnership with the private sector, through Public-Private Partnerships. This paper acknowledges the peculiar difficulties inherent in the use of tolls to finance roads in Nigeria and suggests policies that are required to make it successful.

2021 ◽  
Vol 9 (1) ◽  
pp. 41
Author(s):  
George Nwangwu

Nigeria, like most countries around the world, has turned to Public-Private Partnerships (PPPs) to finance its infrastructure deficit. However, it appears that the government of Nigeria looks towards PPPs as the major solution to the country’s infrastructure crisis. In a sense PPPs are being sold to the public as if they were free, that the private sector would come in with its funds, provide the desired services and that the problem with the country’s infrastructure would automatically cease. This paper argues that this supposition is a myth and that the role of PPPs in the provision of public infrastructure is more nuanced than is being bandied around. PPPs are not the panacea to all of the country’s infrastructure problems and also are far from being completely free. It is however the case that if appropriately deployed, in most cases PPPs provide some advantages over conventional public sector procurements. This paper explores the different advantages and disadvantages of PPPs and suggests ways in which PPPs may be effectively used to improve the country’s infrastructure with reduced fiscal exposure to government.


Author(s):  
Pankaj Sharma ◽  
Ravi Parkash

The paper analyze the role of rural tourism for the development of rural areas, The study analyzed how the different types of tourist product diversifications influence the development possibilities of studied rural areas in India. The government should sponsor private Sector to promote tourism in rural areas. For upgrading the rural tourism government requires to understand the rural location, demography, socio-culture, financial and political background of that area. How we can involve the rural citizens to improve their socio-economic condition. The objective of this paper is to present an update on rural tourism expansion and development in India. Rural tourism is rising in terms of number of visitors and the government of India should focus on it as an engine of growth


Author(s):  
Disha Garg ◽  
Kartik Sharma ◽  
Parul Nayar ◽  
Shubhi Goyal ◽  
Shruti S Nagdeve

Purpose: With the conception of one’s professional life, it is essential to understand all the possibilities and opportunities that lie before them. In the case of architecture, there exists a bias towards the private sector where newly graduate students aspire to work in private practices and possibly even envision a practice of their own at a certain point in life. While there is nothing wrong with envisioning a future in the private sector, it is also essential to be aware about the public sector and understand the opportunities it provides to be able to make an informed decision. There is a preconceived notion about the monotonous nature of government jobs and a lack of awareness about students about the opportunities in this sector. Hence, it becomes crucial to understand the numerous opportunities this sector has to offer and thus, explore the potential of architects in government organizations. Methodology: The research for this paper has been done by referring to existing literature and interviews with concerned people. With an understanding of how and why is the government sector an essential  area of research for budding architects and planners. The research was done through interviews and possible case studies was done based on review of existing literature. Main Findings: The government is one sector with tremendous possibilities in the realm of architecture but is often plagued with stereotypes and preconceptions which have emerged over the years. It is imagined to be “lazy”, “uninnovative” and “non-productive” but this sector has evolved over the recent years and is now shaping to be one of the more lucrative sectors for practice. The number of perks, benefits and a clear comparative advantage of a higher salary, added with the direct contribution towards serving the nation, the government sector clearly has an unrealised potential for architectural professionals. Implications: With younger architetcs having preconceived notions about role of architetcs in a government sector limited to unexciting set of designs without creativity, this article may help bring a fresh thought process to choose professional sector wisely.


2009 ◽  
Vol 20 (2) ◽  
pp. 2-9 ◽  
Author(s):  
Emmanuel Akampurira ◽  
David Root ◽  
Winston Shakantu

Amidst increasingly constrained public budgets and inadequate service delivery, private sector participation through public private partnerships is increasingly being used as a means for delivering physical infrastructure. The government of Uganda, which is currently grappling with a crippling electricity power deficit, has over the years, pursued a number of strategies to encourage private sector participation in the electricity sector, but with limited success. This paper presents the findings of research into the relative importance as perceived by sector stakeholders, of factors that hamstring private sector participation in the development of hydropower generation facilities through public private partnerships in Uganda. The stakeholders considered in this paper are those representing the government and private sector entities in the development of the partnerships. A review of literature and project documents enabled the identification of relevant factors. Data was collected from the respondents by means of a self administered structured questionnaire and quantitative methods used for data analysis. Key findings from the research indicate that the respondents regarded the regulatory and legal frameworks as being attractive for private sector participation and this business environment is further enhanced by their confidence in the government’s commitment to honour its contractual obligations. In contrast, difficulties in structuring and obtaining finance together with issues over the cumbersome approval process and resistance from environmental groups were identified as the most significant constraints to the development and implementation of public private partnerships in the Ugandan electricity sector. Recognizing the importance of an adequate and reliable supply of power in Uganda, as in so many other sub-Saharan countries, it is anticipated that the identification of the relative importance of the constraints as perceived by stakeholders, will inform the process of developing measures and strategies to mitigate the constraints thus facilitating the speedy implementation and deal closure of public private partnership initiatives with the ensuing benefits.


2005 ◽  
Vol 61 (1) ◽  
Author(s):  
H. Van Aswegen ◽  
J. Patterson

Objective: A pilot study was conducted to determine the currentscope of practice of South African physiotherapists working in intensive care units in the government and the private sectors. These findings were compared to the findings from a European survey with regard to the role of the physiotherapist in European intensive care units.Methodology: Ninety questionnaires were distributed nationwide to secondary and tertiary government hospitals as well as to private practitioners involved in cardiopulmonary physiotherapy. The private practitioners included in this survey were listed in the Private Practitioners Association Official Members Directory. Junior and senior physiotherapists working in the intensive care units of their respective hospitals participated in completing the questionnaire. Comparisons between government and private sector data and between the South African survey and the European survey were carried out using the 2test for non-parametric data. A p-value of less than 0.05 was considered to be statistically significant.Results: Fifty-four questionnaires were analyzed and represented 60% of questionnaires sent out. Respondents to the South African survey reported 28% percent of all ICUs had between 9 - 12 beds; 83% physiotherapists indicated the availability of an on-call service during the night and 96% physiotherapists had a weekend physiotherapy service. Ninety-two percent of physiotherapists working in the government sector supervised students compared to 44% of physiotherapists in the private sector. Between 9% and 27% of physiotherapists in government and private hospitalsactively participated in research in ICU. There were no statistically significant differences in the use of respiratory physiotherapy, mobilization and positioning between respondents to the European survey and those of the South African survey respectively.Conclusion: The response rate to this questionnaire was good. It was evident from this pilot survey that the scope of practice of physiotherapy in ICU didn’t differ significantly between the government and private sector in South Africa. The role of the intensive care physiotherapist in South Africa was similar to that of the European physiotherapist  working in ICU.


2020 ◽  
Vol 5 (5) ◽  
pp. 167
Author(s):  
Nyoman Utari Vipriyanti ◽  
Dewa Ayu Puspawati ◽  
Putu Lasmi Yulianthi Sapanca ◽  
Made Emy Handayani Citra

The Covid 19 pandemic has brought significant changes to the economy of Bali as a domestic and foreign tourist destination. The tourism sector, as the main contributor to the largest contributor to Gross Regional Domestic Product (GRDP), experienced a contraction, which had an impact on other sectors. One of the sectors affected in the agricultural sector, especially the marketing of food products. In the new normal era in Bali, it is necessary to strengthen the rural economy through the application of technology but the process of implementing these innovations is not always successful. The success of collective action is determined by the rational boundaries of society. The rational boundaries of society can be expanded by the presence of symmetrical information. The research objective was to analyze the role of collective action on the application of the Integrated System of Rice Ducks as an effort to increase farmers' income. This research is a case study in Subak Lanyah, Tabanan Sub District, Tabanan-Bali District. Primary data were collected through direct observation and questionnaires while secondary data were collected through literature studies. Analysis of the role of collective action in the application of the integrated system of rice ducks (STIP) was carried out statistically descriptive of farm costs and farmer income. The results showed that the STIP innovation as an effort to increase farmers' income was successfully implemented through Collective action. The collective action mechanism plays a role in strengthening social capital which encourages the application of STIP technology so that the income of Subak member farmers in Subak Lanyah, Tabanan-Bali increases. The success in implementing STIP technology is done by building a process of communication, trust, and networks of farmers with the government, private sector, and universities.of communication, trust, and networks of farmers with the government, private sector, and universities.


Author(s):  
Doina Stratu-Strelet ◽  
Anna Karina López-Hernández ◽  
Vicente Guerola-Navarro ◽  
Hermenegildo Gil-Gómez ◽  
Raul Oltra-Badenes

This chapter highlights the role of technology-based universities in public-private partnerships (PPP) to strengthen and deploy the digital single market strategy. Moreover, it analyzes how these collaboration channels have link knowledge management as a tool for sustainable collaboration. Given the need to establish collaboration channels with the private sector, according to Lee, it is critical to establish the impact of sharing sophisticated knowledge and partnering at the same time. This chapter wants to highlights two relevant aspects of PPP: on the one hand, the importance of integrating the participation of a technology-based university with three objectives: (1) the coordination, (2) the funding management, and (3) the dissemination of results; and the other hand, the participation private sector that is represented by agile agents capable to execute high-value actions for society. With the recognition of these values, the investment and interest of the projects under way are justified by public-private partnership.


Author(s):  
Andrisha Beharry Ramraj

This chapter will examine the role of different stakeholders towards alleviating the constraints towards the growth of informal entrepreneurship. The stakeholders that will be investigated include the government, consumers, and the private sector. This study will comprise of a literature review that explores the challenges that affect the growth of informal entrepreneurship. While exploring these factors the role played by different stakeholders to alleviate the challenges are identified and analysed. A methodology that is based on desktop qualitative research, key findings, and discussions are examined, and conclusions based on the acquired research are drawn.


Subject The United Kingdom's new cybersecurity strategy. Significance The UK government on November 1 published its Cybersecurity Strategy for 2016-21. The new strategy doubles the previous investment in cyber to 1.9 billion pounds (2.4 billion dollars) during a time of government cutbacks, making it clear that the government regards cybersecurity as a priority. Impacts Despite serious investment, the government will still face a challenge in recruiting those with the required cyber skills. Given the expertise in the private sector, public-private partnerships will continue to be vital for protecting UK networks. ‘Naming and shaming’ cyber aggressors may become more prevalent as states seek to deter further cyberattacks. Governments may also increasingly focus on developing offensive cyber tools that can be used to counter-strike.


2020 ◽  
Vol 9 (2) ◽  
pp. 146
Author(s):  
Wahdania Suardi ◽  
Suswanta Suswanta

This study aims to describe the role of the government-private and role of the government-NGO coalition in Green Open Space Based Urban Governance in Makassar City. This type of research is qualitative, research conducted to systematically search for and compile all data obtained, both interview data, field notes and other data that support research. The results of this study indicate that the confidence of the private / private sector in the city government green open space policy is still low because the government's political will problem is that it does not involve all components in the private sector. One of the strategies is optimizing planters in RTR in strategic areas such as in the Untia region. The strategy that is pressed on the private sector is segmentation of activities that can increase green open space. Decisions taken by the private or private sector are based on the mission of the organization itself which has environmental concerns as outlined through CSR programs, the program is not intervened by the city government. Although there have been Regional Regulations Number 3 of 2014 concerning the arrangement and management of green open spaces but not yet assessed WALHI has provided significant progress for the addition of RTH in Makassar Penelitian ini bertujuan untuk mendeskripsikan peran koalisi pemerintah-swasta dan peran koalisi pemerintah-LSM Dalam Tata Kelola Perkotaan Berbasis Ruang Terbuka Hijau (RTH) di Kota Makassar. Jenis penelitian ini adalah kualitatif, penelitian yang dilakukan untuk mencari dan menyusun secara sistematis seluruh data yang diperoleh baik itu data hasil wawancara, catatan lapangan dan data-data lain yang sifatnya menunjang penelitian. Hasil penelitian ini menunjukkan bahwa keyakinan sektor swasta/privat terhadap kebijakan RTH pemerintah kota masih rendah karena persoalan political will dari pemerintah yang kurang melibatkan seluruh komponen pada sektor swasta. Salah satu strateginya adalah optimalisasi penanam pada RTR Kawasan strategis seperti di Kawasan Untia. Strategi yang ditekan pada pihak swasta adalah segmentasi pada kegiatan yang dapat meningkatkan ruang terbuka hijau. Keputusan yang diambil sektor privat atau swasta adalah berdasarkan misi dari organisasi itu sendiri yang memiliki kepedulian terhadap lingkungan yang dituangkan melalui program CSR, program tersebut tidak mendapat intervensi oleh pemerintah kota. Meskipun telah ada Peraturan Daerah Nomor 3 Tahun 2014 tentang penataan dan pengelolaan ruang terbuka hijau namun belum dinilai WALHI memberikan kemajuan berarti bagi penambahan RTH di Kota Makassar


Sign in / Sign up

Export Citation Format

Share Document