Sultra Civil Engineering Journal
Latest Publications


TOTAL DOCUMENTS

20
(FIVE YEARS 20)

H-INDEX

0
(FIVE YEARS 0)

Published By Universitas Sulawesi Tenggara

2716-1714

2021 ◽  
Vol 2 (1) ◽  
pp. 29-36
Author(s):  
Muhammad Muhsar ◽  
Abdul Kadir ◽  
Sulaiman Sulaiman

The purpose of this study was to Analyze the characteristics of theaggregates used in concrete mixtures and analyze how muchincrease in compressive strength of concrete with a variation ofnickel slag substitution 0%, 5%, 15%, 25% compared with normalconcrete. The characteristics of the material examined are watercontent, sludge content, specific gravity and absorption, volumeweight, abrasion with los angeles machines, and filter analysis.While the large increase in compressive strength of concrete can betested at the age of 7 days, 14 days, 28 days and 35 days. From the results of the analysis of the characteristics of nickel slagwaste in concrete mixes meet the test standards in concretemixtures, with a moisture content of 0.86%, sludge content of 0.44%,specific gravity of 2.94 gr / cm3, volume weight of 1.76 gr / cm3,abrasion 36.07%. And a large increase in compressive strength ofconcrete with a variation of nickel slag substitution of 0%, 5%, 15%,25% compared to normal concrete is increasing. The highestpercentage increase in concrete compressive strength is found inconcrete compressive strength between a variation of 15% with avariation of 25% at 14 days concrete age, with a percentage increasein value of 13.13%.


2021 ◽  
Vol 2 (1) ◽  
pp. 1-7
Author(s):  
Ramadhan Hidayat Putra ◽  
Amad Syarif Syukri ◽  
Catrin Sudarjat ◽  
Vickky Anggara Ilham

Research on Aepodu Weir Sediment Transport Analysis in South Konawe District, based on observations in the field, Aepodu Weir hasa sediment buildup that has now exceeded the height of the weirlight house. The purpose of the study was to analyze the magnitudeof Aepodu river flow and to analyze the amount of sedimenttransport that occurred in the Aepodu dam. The method used todetermine the amount of bed load transport uses stchoklitscht, whilefor transporting suspended load using forcheimer.The results of the analysis of the average flow of the Aepodu riverwere 3,604 m3/ second. Sediment transport that occurs in Aepoduweir is Bedload transport (Qb) of 291625.771 tons / year, andsuspended load transport (Qs) of 16972,423 tons / year, so that thetotal sediment transport (QT) is 308598,194 tons / year.


2021 ◽  
Vol 2 (1) ◽  
pp. 46-54
Author(s):  
Neti Rahmawati ◽  
Irwan Lakawa ◽  
Sulaiman Sulaiman

Concrete is one of the most widely used building materials today interms of physical construction. Concrete is made from a mixture offine, coarse aggregate, cement, and water with a certain ratio, aswell as materials that are usually added to the concrete mixtureduring or during mixing, to changing the properties of concrete tomake it more suitable in certain jobs and more economical, can alsobe added with certain other mixed materials as needed if deemednecessary. Seashells can be used to mix concrete. This study aims todetermine whether the addition of shells aggregate shells in aconcrete mixture can affect the mechanical properties of concrete.The specimens used are in the form of cubes with a size of 15cm x 15cm x 15 cm, consisting of additional concrete coarse and fineaggregate with shell substitution percentage of 0%, 15%, 20% with atotal sample of 45, with the planned concrete quality of K225. Theuse of sea shells in increasing the compressive strength of concrete isbetter used as fine aggregate than coarse aggregate. The use of seashells as a substitute for fine aggregates achieves maximum resultsat 20% composition.


2021 ◽  
Vol 2 (1) ◽  
pp. 19-28
Author(s):  
Suhardin Mangidi ◽  
Sunaryo Sunaryo ◽  
Sulaiman Sulaiman ◽  
Sufrianto Sufrianto

This study aims to analyze the value of the Pavement Condition Index (PCI), analyze the amount of the budget needed to deal with roaddamage, and analyze the value of the influence between the value ofthe PCI and the budget for road repair on the Gunung Jaya - PoliPoliaroad section. The results of this study indicate that the pavement condition index(PCI) of Gunung Jaya - Poli-Polia Road is 52.5 in the mediumcategory. The total budget required to deal with the damage to theGunung Jaya - Polia-Polia road is Rp. 12,085,500,000.00. PCI valueaffects the budget plan of 21.5%.


2021 ◽  
Vol 2 (1) ◽  
pp. 8-18
Author(s):  
La Ode Ahmad Rasyid ◽  
Irwan Lakawa ◽  
La Ode Musa Rahmat

Indonesia is a large country that is widespread with it’s islands and isa country traversed by the Equator, so sea transportation has animportant role to play in connecting one area to another, consideringthat Indonesia has a very wide ocean. One of the means of seatransportation that is widely used by the community is the ferry. Ferryis a type of sea transportation that can be used as passenger andgoods transportation using certain routes or routes. With theexistence of the Ferry port, it can increase the acceleration ofdevelopment in the area, especially Amolengo Village, KonaweSelatan Regency.The Amolengo ferry port is a port that serves the crossing ofpassengers and goods that connects the South Konawe mainland andits surroundings with Buton Island, where the destination port is Pureport. The quality of good service provided is one of the determiningfactors for the success of the company. The research method isarranged by interviewing respondents by answering the questions onthe questionnaire. The analysis was performed using ImportancePerformance Analysis (IPA) and the Customer Satisfaction Index (CSI).The results of this study indicate that the consumer satisfaction indexon the performance of the Amolengo - Pure Ferry Port, SoutheastSulawesi Province is 84.6% and is in the range 0.81 - 1.00 indicatingthat consumers are very satisfied with the service quality of theAmolengo - Pure Ferry Port, Southeast Sulawesi Province.  


2021 ◽  
Vol 2 (1) ◽  
pp. 37-45
Author(s):  
Al Mustahyun ◽  
Sunaryo Sunaryo ◽  
La Ode Musa Rahmat ◽  
Sufrianto Sufrianto

Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increasedproductivity will reduce work time, and will reduce costs, especiallylabor costs so that the minimum labor cost is obtained (labor costs)to get competitive prices both for auction and implementation. Thepurpose of this study is to analyze the labor productivity time incompleting 1 m2 of masonry bricks and to analyze the productivityvalue of brick masons in completing work activities in the constructionproject of the Mandala Wangi 2 female dormitory. The results showedthat the time required to complete 1 m2 of brick laying work was 41.13minutes on average. The productivity of the artisans working on the 1stfloor is an average of 1.45 m2/hr. Meanwhile, the productivity ofcraftsmen working on the 2nd floor is an average of 1.47 m2/hr.


2020 ◽  
Vol 1 (2) ◽  
pp. 89-109
Author(s):  
Sudirman . ◽  
La Ode Muhamad Magribi ◽  
La Ode Musa Rachmat

Performance Evaluation is a system and how to determine the work ofindividuals, employees, work units and organizations as a whole thatare used to ensure the achievement of goals and objectives. The purpose of this study is to analyze the level of importanceand customer satisfaction on service and position of each variablewhen associated with performance indicators and service usersatisfaction in the terminal of Haluoleo Airport cargo. Performance Evaluation at Haluoleo Airport Logistics Terminalcan be measured by several indicators to determine the level ofimportance and satisfaction felt by the customers. To know the level ofimportance and satisfaction in the use of approach through analysis ofImportance Performance Analysis of interest analysis and performanceanalysis, each using a 5 Likert scale. Based on the analysis, the value ofcustomer satisfaction is 88%, which means the service criteria are verysatisfied and the quality of service at the Haluoleo Airport cargoterminal is in very good condition based on the user's rating. Overallthe value of customer satisfaction for service performance is 0.88 withthe criteria of service users feel very satisfied for the performance.


2020 ◽  
Vol 1 (2) ◽  
pp. 9-26
Author(s):  
Astin . ◽  
Sunaryo . ◽  
La Ode Musa Rachmat

The problem of construction project is very complicated and complexso that required a good management function that is planningactivities, implementation activities, and control activities. A projectis categorized as successful when appropriate cost / budget, timelyand quality.The purpose of this study is to analyze the perceptions of workers onthe inhibiting factors of the asphalting implementation and toanalyze the factors that hinder the project implementation based onthe perception of workers on the paving of Benua - Basala toll roadin South Konawe District.The research method used is interview method using kuisioner withsample of research is worker, where the analytical technique used isdescriptive method and factor analysis method with the help ofprogram SPSS version 16.The result of this research is the perception of the worker to theinhibiting factor of project implementation ie the material factors;Labor factors; Equipment factors; Financial factors; andEnvironmental factors.


2020 ◽  
Vol 1 (2) ◽  
pp. 44-53
Author(s):  
Eko Efendi Juantoro ◽  
La Ode Muhamad Magribi ◽  
Irwan Lakawa ◽  
Sufrianto .

The development of rural areas from the agricultural base sector inthe field of food through land transportation infrastructure is themain focus of this research. The location of the object of researchwas Tongauna District, Konawe Regency, Southeast SulawesiProvince. which is the background for site selection because themajority of the people in Tongauna are farmers and the Tongaunasub-district is the district with the largest production of lowland ricecommodity in Southeast Sulawesi province which can be anagricultural base sector. Land transportation has become a veryimportant media that supports the mobility, connectivity andaccessibility of agriculture so as to increase the productivity ofleading sectors of agriculture that have an impact on thedevelopment of the area of Tongauna District


2020 ◽  
Vol 1 (2) ◽  
pp. 72-88
Author(s):  
Arsum Rheza Djaya Saputra ◽  
Irwan Lakawa ◽  
La Ode Musa Rachmat

This study aims to analyze the degree of saturation of the signaled intersection at the intersection of PLN Wua-Wua Kendari, the longqueue condition based on the Manual Capacity Road Indonesia(MKJI, 1997) method with direct measurement in the field, trafficdelay condition, and predict the performance of PLN intersectionWua- Wua at 5 and 10 years to come. Data analysis techniques usemathematical equations by using Manual Capacity Method ofIndonesia (MKJI, 1997) with the help of Microsoft Excel. Trafficvolume surveys and queue lengths are carried out together for 15minutes each time for 12 hours of measurement. The long queuingcondition based on MKJI 1997 method on the east approaches 42,62meters, west approach 79,5 meter, North approach 47,1 meter andSouthern approach 52,4 meter with average queue length 55, 4meters. While based on the calculation directly in the field obtainedvalue on the approach of the East of 33.51 meters, Westernapproach of 39.23 meters, Northern approach of 41.53 meters,South approach of 58.05 meters, with an average queue length of43, 08 meters. The traffic delay on the Eastern approach was 56.2seconds / smp, Western approach of 84.1 seconds / smp, Northapproach of 64.1 seconds / smp, and Southern approach of 69.0seconds / smp. Predicted traffic volume for the next 5 years for theEastern approach of the DS value of 0.94 with the LOS E, the westernapproach to the DS value of 1.29 with the LOS F, the Northapproaches the DS value of 1.20 with the LOS F, the Southernapproach of the DS value of 1.27 with LOS F, while for the next 10years on the Eastern approach the value of DS is 1.57 with LOS F,Western approach of DS value of 2.25 with LOS F, North approach ofDS value of 2.00 with LOS F, South DS value of 2.12 with LOS F.


Sign in / Sign up

Export Citation Format

Share Document