scholarly journals Applicability of a nationwide flood forecasting system for Typhoon Hagibis 2019

2021 ◽  
Vol 11 (1) ◽  
Author(s):  
Wenchao Ma ◽  
Yuta Ishitsuka ◽  
Akira Takeshima ◽  
Kenshi Hibino ◽  
Dai Yamazaki ◽  
...  

AbstractFloods can be devastating in densely populated regions along rivers, so attaining a longer forecast lead time with high accuracy is essential for protecting people and property. Although many techniques are used to forecast floods, sufficient validation of the use of a forecast system for operational alert purposes is lacking. In this study, we validated the flooding locations and times of dike breaking that had occurred during Typhoon Hagibis, which caused severe flooding in Japan in 2019. To achieve the goal of the study, we combined a hydrodynamic model with statistical analysis under forcing by a 39-h prediction of the Japan Meteorological Agency's Meso-scale model Grid Point Value (MSM-GPV) and obtained dike-break times for all flooded locations for validation. The results showed that this method was accurate in predicting floods at 130 locations, approximately 91.6% of the total of 142 flooded locations, with a lead time of approximately 32.75 h. In terms of precision, these successfully predicted locations accounted for 24.0% of the total of 542 locations under a flood warning, and on average, the predicted flood time was approximately 8.53 h earlier than a given dike-break time. More warnings were issued for major rivers with severe flooding, indicating that the system is sensitive to extreme flood events and can issue warnings for rivers subject to high risk of flooding.

2006 ◽  
Vol 21 (1) ◽  
pp. 24-41 ◽  
Author(s):  
Jung-Sun Im ◽  
Keith Brill ◽  
Edwin Danaher

Abstract The Hydrometeorological Prediction Center (HPC) at the NCEP has produced a suite of deterministic quantitative precipitation forecasts (QPFs) for over 40 yr. While the operational forecasts have proven to be useful in their present form, they offer no information concerning the uncertainties of individual forecasts. The purpose of this study is to develop a methodology to quantify the uncertainty in manually produced 6-h HPC QPFs (HQPFs) using NCEP short-range ensemble forecasts (SREFs). Results presented herein show the SREFs can predict the uncertainty of HQPFs. The correlation between HQPF absolute error (AE) and ensemble QPF spread (SP) is greater than 0.5 at 90.5% of grid points in the continental United States, exceeding 0.8 at 10% of these, for the 6-h forecast in winter. On the basis of the high correlation, the linear regression equations of AE on SP are derived at each point on a grid covering the United States. In addition, the regression equations for data categorized according to the observed and forecasted precipitation amounts are obtained and evaluated. Using the regression model equation parameters for 15 categorized ranges of HQPF at each horizontal grid point for each season and individual forecast lead time, an AE associated with an individual SP is predicted, as is the 95% confidence interval (CI) of the AE. Based on the AE CI forecast and the HQPF itself, the 95% CI of the HQPF is predicted as well. This study introduces an efficient and advanced method, providing an estimate of the uncertainty in the deterministic HQPF. Verification demonstrates the usefulness of the CI forecasts for a variety of classifications, such as season, CI range, HQPF, and forecast lead time.


2020 ◽  
Author(s):  
Trine Jahr Hegdahl ◽  
Kolbjørn Engeland ◽  
Ingelin Steinsland ◽  
Andrew Singleton

<p>In this work the performance of different pre- and postprocessing methods and schemes for ensemble forecasts were compared for a flood warning system.  The ECMWF ensemble forecasts of temperature (T) and precipitation (P) were used to force the operational hydrological HBV model, and we estimated 2 years (2014 and 2015) of daily retrospect streamflow forecasts for 119 Norwegian catchments. Two approaches were used to preprocess the temperature and precipitation forecasts: 1) the preprocessing provided by the operational weather forecasting service, that includes a quantile mapping method for temperature and a zero-adjusted gamma distribution for precipitation, applied to the gridded forecasts, 2)  Bayesian model averaging (BMA) applied to the catchment average values of temperature and precipitation. For the postprocessing of catchment streamflow forecasts, BMA was used. Streamflow forecasts were generated for fourteen schemes with different combinations of the raw, pre- and postprocessing approaches for the two-year period for lead-time 1-9 days.</p><p>The forecasts were evaluated for two datasets: i) all streamflow and ii) flood events. The median flood represents the lowest flood warning level in Norway, and all streamflow observations above median flood are included in the flood event evaluation dataset. We used the continuous ranked probability score (CRPS) to evaluate the pre- and postprocessing schemes. Evaluation based on all streamflow data showed that postprocessing improved the forecasts only up to a lead-time of 2 days, while preprocessing T and P using BMA improved the forecasts for 50% - 90% of the catchments beyond 2 days lead-time. However, with respect to flood events, no clear pattern was found, although the preprocessing of P and T gave better CRPS to marginally more catchments compared to the other schemes.</p><p>In an operational forecasting system, warnings are issued when forecasts exceed defined thresholds, and confidence in warnings depends on the hit and false alarm ratio. By analyzing the hit ratio adjusted for false alarms, we found that many of the forecasts seemed to perform equally well. Further, we found that there were large differences in the ability to issue correct warning levels between spring and autumn floods. There was almost no ability to predict autumn floods beyond 2 days, whereas the spring floods had predictability up to 9 days for many events and catchments.</p><p>The results underline differences in the predictability of floods depending on season and the flood generating processes, i.e. snowmelt affected spring floods versus rain induced autumn floods. The results moreover indicate that the ensemble forecasts are less good at predicting correct autumn precipitation, and more emphasis could be put on finding a better method to optimize autumn flood predictions. To summarize we find that the flood forecasts will benefit from pre-/postprocessing, the optimal processing approaches do, however, depend on region, catchment and season.</p>


Author(s):  
Ganesh R. Ghimire ◽  
Witold F. Krajewski ◽  
Felipe Quintero

AbstractIncorporating rainfall forecasts into a real-time streamflow forecasting system extends the forecast lead time. Since quantitative precipitation forecasts (QPFs) are subject to substantial uncertainties, questions arise on the trade-off between the time horizon of the QPF and the accuracy of the streamflow forecasts. This study explores the problem systematically, exploring the uncertainties associated with QPFs and their hydrologic predictability. The focus is on scale dependence of the trade-off between the QPF time horizon, basin-scale, space-time scale of the QPF, and streamflow forecasting accuracy. To address this question, the study first performs a comprehensive independent evaluation of the QPFs at 140 U.S. Geological Survey (USGS) monitored basins with a wide range of spatial scales (~10 – 40,000 km2) over the state of Iowa in the Midwestern United States. The study uses High-Resolution Rapid Refresh (HRRR) and Global Forecasting System (GFS) QPFs for short and medium-range forecasts, respectively. Using Multi-Radar Multi-Sensor (MRMS) quantitative precipitation estimate (QPE) as a reference, the results show that the rainfall-to-rainfall QPF errors are scale-dependent. The results from the hydrologic forecasting experiment show that both QPFs illustrate clear value for real-time streamflow forecasting at longer lead times in the short- to medium-range relative to the no-rain streamflow forecast. The value of QPFs for streamflow forecasting is particularly apparent for basin sizes below 1,000 km2. The space-time scale, or reference time (tr) (ratio of forecast lead time to basin travel time) ~ 1 depicts the largest streamflow forecasting skill with a systematic decrease in forecasting accuracy for tr > 1.


2015 ◽  
Vol 19 (7) ◽  
pp. 3181-3201 ◽  
Author(s):  
N. Dogulu ◽  
P. López López ◽  
D. P. Solomatine ◽  
A. H. Weerts ◽  
D. L. Shrestha

Abstract. In operational hydrology, estimation of the predictive uncertainty of hydrological models used for flood modelling is essential for risk-based decision making for flood warning and emergency management. In the literature, there exists a variety of methods analysing and predicting uncertainty. However, studies devoted to comparing the performance of the methods in predicting uncertainty are limited. This paper focuses on the methods predicting model residual uncertainty that differ in methodological complexity: quantile regression (QR) and UNcertainty Estimation based on local Errors and Clustering (UNEEC). The comparison of the methods is aimed at investigating how well a simpler method using fewer input data performs over a more complex method with more predictors. We test these two methods on several catchments from the UK that vary in hydrological characteristics and the models used. Special attention is given to the methods' performance under different hydrological conditions. Furthermore, normality of model residuals in data clusters (identified by UNEEC) is analysed. It is found that basin lag time and forecast lead time have a large impact on the quantification of uncertainty and the presence of normality in model residuals' distribution. In general, it can be said that both methods give similar results. At the same time, it is also shown that the UNEEC method provides better performance than QR for small catchments with the changing hydrological dynamics, i.e. rapid response catchments. It is recommended that more case studies of catchments of distinct hydrologic behaviour, with diverse climatic conditions, and having various hydrological features, be considered.


2020 ◽  
Vol 4 ◽  
pp. 96-109
Author(s):  
A.V. Romanov ◽  
◽  
M.V. Yachmenova ◽  

Based on the example of flood warning data provided by EFAS for the territory of Northwestern Administration for Hydrometeorology and Environmental Monitoring in 2018-2020, the structure of the systematized issues of the EFAS portal is analyzed. The issues determine a feedback for the year-round monitoring of the accuracy of flood forecasting using the LISFLOOD base model, as well as its calibration. Several most important feedback sections are highlighted, that allow improving significantly a procedure for the quantitative and qualitative differentiated assessment of short- and medium-range flood forecasts. Using the results of the numerical analysis, a general description of the EFAS flood warning system quality and the prospects for the participation of the Russian Federation in it are given. Keywords: flooding, hydrological forecasts, forecast lead time, feedback, forecast accuracy


AI Magazine ◽  
2016 ◽  
Vol 37 (2) ◽  
pp. 63-75
Author(s):  
Sathappan Muthiah ◽  
Bert Huang ◽  
Jaime Arredondo ◽  
David Mares ◽  
Lise Getoor ◽  
...  

Civil unrest events (protests, strikes, and “occupy” events) are common occurrences in both democracies and authoritarian regimes. The study of civil unrest is a key topic for political scientists as it helps capture an important mechanism by which citizenry express themselves. In countries where civil unrest is lawful, qualitative analysis has revealed that more than 75 percent of the protests are planned, organized, or announced in advance; therefore detecting references to future planned events in relevant news and social media is a direct way to develop a protest forecasting system. We report on a system for doing that in this article. It uses a combination of keyphrase learning to identify what to look for, probabilistic soft logic to reason about location occurrences in extracted results, and time normalization to resolve future time mentions. We illustrate the application of our system to 10 countries in Latin America: Argentina, Brazil, Chile, Colombia, Ecuador, El Salvador, Mexico, Paraguay, Uruguay, and Venezuela. Results demonstrate our successes in capturing significant societal unrest in these countries with an average lead time of 4.08 days. We also study the selective superiorities of news media versus social media (Twitter, Facebook) to identify relevant trade-offs.


2016 ◽  
Vol 31 (3) ◽  
pp. 1001-1017 ◽  
Author(s):  
Omar V. Müller ◽  
Miguel A. Lovino ◽  
Ernesto H. Berbery

Abstract Weather forecasting and monitoring systems based on regional models are becoming increasingly relevant for decision support in agriculture and water management. This work evaluates the predictive and monitoring capabilities of a system based on WRF Model simulations at 15-km grid spacing over the La Plata basin (LPB) in southern South America, where agriculture and water resources are essential. The model’s skill up to a lead time of 7 days is evaluated with daily precipitation and 2-m temperature in situ observations for the 2-yr period from 1 August 2012 to 31 July 2014. Results show high prediction performance with 7-day lead time throughout the domain and particularly over LPB, where about 70% of rain and no-rain days are correctly predicted. Also, the probability of detection of rain days is above 80% in humid regions. Temperature observations and forecasts are highly correlated (r > 0.80) while mean absolute errors, even at the maximum lead time, remain below 2.7°C for minimum and mean temperatures and below 3.7°C for maximum temperatures. The usefulness of WRF products for hydroclimate monitoring was tested for an unprecedented drought in southern Brazil and for a slightly above normal precipitation season in northeastern Argentina. In both cases the model products reproduce the observed precipitation conditions with consistent impacts on soil moisture, evapotranspiration, and runoff. This evaluation validates the model’s usefulness for forecasting weather up to 1 week in advance and for monitoring climate conditions in real time. The scores suggest that the forecast lead time can be extended into a second week, while bias correction methods can reduce some of the systematic errors.


2013 ◽  
Vol 17 (6) ◽  
pp. 2359-2373 ◽  
Author(s):  
E. Dutra ◽  
F. Di Giuseppe ◽  
F. Wetterhall ◽  
F. Pappenberger

Abstract. Vast parts of Africa rely on the rainy season for livestock and agriculture. Droughts can have a severe impact in these areas, which often have a very low resilience and limited capabilities to mitigate drought impacts. This paper assesses the predictive capabilities of an integrated drought monitoring and seasonal forecasting system (up to 5 months lead time) based on the Standardized Precipitation Index (SPI). The system is constructed by extending near-real-time monthly precipitation fields (ECMWF ERA-Interim reanalysis and the Climate Anomaly Monitoring System–Outgoing Longwave Radiation Precipitation Index, CAMS-OPI) with monthly forecasted fields as provided by the ECMWF seasonal forecasting system. The forecasts were then evaluated over four basins in Africa: the Blue Nile, Limpopo, Upper Niger, and Upper Zambezi. There are significant differences in the quality of the precipitation between the datasets depending on the catchments, and a general statement regarding the best product is difficult to make. The generally low number of rain gauges and their decrease in the recent years limits the verification and monitoring of droughts in the different basins, reinforcing the need for a strong investment on climate monitoring. All the datasets show similar spatial and temporal patterns in southern and north-western Africa, while there is a low correlation in the equatorial area, which makes it difficult to define ground truth and choose an adequate product for monitoring. The seasonal forecasts have a higher reliability and skill in the Blue Nile, Limpopo and Upper Niger in comparison with the Zambezi. This skill and reliability depend strongly on the SPI timescale, and longer timescales have more skill. The ECMWF seasonal forecasts have predictive skill which is higher than using climatology for most regions. In regions where no reliable near-real-time data is available, the seasonal forecast can be used for monitoring (first month of forecast). Furthermore, poor-quality precipitation monitoring products can reduce the potential skill of SPI seasonal forecasts in 2 to 4 months lead time.


2021 ◽  
Vol 13 (21) ◽  
pp. 4459
Author(s):  
Aline Falck ◽  
Javier Tomasella ◽  
Fabrice Papa

This study investigates the potential of observations with improved frequency and latency time of upcoming altimetry missions on the accuracy of flood forecasting and early warnings. To achieve this, we assessed the skill of the forecasts of a distributed hydrological model by assimilating different historical discharge time frequencies and latencies in a framework that mimics an operational forecast system, using the European Ensemble Forecasting system as the forcing. Numerical experiments were performed in 22 sub-basins of the Tocantins-Araguaia Basin. Forecast skills were evaluated in terms of the Relative Operational Characteristics (ROC) as a function of the drainage area and the forecasts’ lead time. The results showed that increasing the frequency of data collection and reducing the latency time (especially 1 d update and low latency) had a significant impact on steep headwater sub-basins, where floods are usually more destructive. In larger basins, although the increased frequency of data collection improved the accuracy of the forecasts, the potential benefits were limited to the earlier lead times.


Sign in / Sign up

Export Citation Format

Share Document