scholarly journals Qualification of Contractor Towards Construction Project in the City of Banjarmasin, Indonesia

2021 ◽  
Vol 65 (1) ◽  
pp. 45-52
Author(s):  
Aldhika Kurniawan

This study identified the correlation between small contractor qualification and work performance of the contractor in the city of Banjarmasin. This study used the perspective of descriptive quantitative for social research. The data were collected through questionnaires distributed to contractors who worked in Banjarmasin Public Works and Spatial Planning Office (PUPR) as an agency who exploited contractor service. The analysis was conducted through product moment in Spearman’s rank model. This study has resulted that the conspicuous performance factor was fulfillment of work (job) function and scope of work that are similar to the documents of project’s contract. Meanwhile, the correlation of small contractor qualification and work performance of project construction in Banjarmasin was influenced by Person in-charge of Business Agency (PJBU).

2021 ◽  
Vol 2 (2) ◽  
pp. 36-41
Author(s):  
Roys Machmud ◽  
Umar Sako Baderan ◽  
Fitriani Karim

This study aims to determine the Evaluation of Work Performance Measurement System (SIRANSIJA) State Civil Apparatus in the Public Works and Spatial Planning Office of Gorontalo Province. This research is included in the type of descriptive research with a qualitative research approach. The results showed that the Evaluation of the Work Achievement Measurement System (SIRANSIJA) of the State Civil Apparatus in the Public Works and Spatial Planning Office of Gorontalo Province in general has been going well, however it is still very constrained in terms of networking. Where connectivity is often problematic due to disruption in absentee input, work implementation reports and so on.


2021 ◽  
Vol 2 (2) ◽  
pp. 90-96
Author(s):  
Duwi Agustina ◽  
Suhaidar

This study aims to measure the effect of employee participation in budgeting and organizational commitment to budgetary slack in Bangka Belitung Islands Provincial Government Agencies, in particular the Public Works and Spatial Planning Office of the Bangka Belitung Islands Province. The analytical method used for testing the variables in this study uses PLS (Partial Least Square) using Smart PLS.3 software. The sample used in this study were 50 employees at the Department of Public Works and Spatial Planning of the Bangka Belitung Islands Province. The first hypothesis in this study is accepted, namely budget participation has a positive effect on budgetary slack, but the second hypothesis in this study is rejected, namely organizational commitment has a negative effect on budgetary slack. This identifies that the participation of many parties in a company or scope of work to jointly exchange information in determining and compiling a budget to achieve an organizational goal.


2021 ◽  
Vol 7 (2) ◽  
pp. 155-167
Author(s):  
Nafiudin ◽  
Andari ◽  
Denny Kurnia ◽  
Andini Tia Safitri

This study is to examine the effect of Job Redesign and Job Description on Employee Performance in the Public Works and Spatial Planning Office of Serang Regency. The method used is a quantitative method. The population is 55 employees and the sample is 35 employees. Data were collected using a questionnaire. To test the model and hypothesis, the SPSS version 25 program was used. Based on the results of this study indicate: Job Redesign partially has no effect on employee performance. Job description partially positive and significant effect on employee performance. Job redesign and job description simultaneously have a positive and significant effect on employee performance.


2019 ◽  
Vol 2 (1) ◽  
pp. 39-49
Author(s):  
Meri Widiya Gustina ◽  
Hoirun Nisyak

ABSTRACT This research is motivated by the poor implementation of the maintenance of the Sirah Pulau Padang-Pampangan road, the maintenance activities have not reached the target and the condition of the road is badly damaged. This study aims to determine the management of the maintenance budget for the Sirah Pulau Padang-Pampangan road for the 2017 Fiscal Year at the Public Works and Spatial Planning Office of Ogan Komering Ilir Regency. The research method used in this study is a qualitative method. Data collection techniques carried out through observation, in-depth interviews and documentation. The theory used in this study is the principles of financial management according to Juli Sarlima, where financial management can be seen from five dimensions, namely Transparency, Efficient, Effective, Accountable and Participatory, and analysed through management aspects, namely Planning, Organizing, Implementing and Responsibility. Based on the results of research in the field shows that Transparency, Efficient, Effective, Accountable and Participatory has not been done well. The conclusion of this research is that the management of budget road maintenance for the Sirah Pulau Padang-Pampangan roads in the 2017 fiscal year is not going well. This research suggests that management of budget works well: 1) Standard Operational Procedure (SOP) for Road Maintenance activities needs to be made, 2) the need for a place for the community to participate and be involved in planning, implementation of supervision, 3) preparation of Financial Statements and Reports Accountability must be clear and detailed.


2018 ◽  
Vol 9 (1) ◽  
pp. 58
Author(s):  
Lika Dora

<p><em>This study aims to examine and analyze the Influence of Leadership Style, Incentives and Work Environment on Job Performance in Department of Public Works and Spatial Planning of Bogor Regency. Data collection was done by distributing questionnaires and implemented for 118 employees. Data analysis in this research using SPSS version 24.</em></p><p><em>The results of this study explain that between leadership style, incentive and work environment have a significant influence on the performance of employees partially and simultaneously. For the variable that has the most dominant influence on the work performance is the style of leadership, so to obtain optimal employee performance hence leadership style factors, incentives and work environment needs to be improved.</em></p>


2021 ◽  
Vol 1 (1) ◽  
pp. 1-6
Author(s):  
Abizar Aria Ghifar ◽  
Ira Safitri ◽  
Irland Fardani

Abstract. Today, regional spatial planning is one of the challenges in the development of a city. Indications of the development of the city can be seen from the increase in the area built due to an increase in population. As a result, city space is limited, so much urban land is used illegally or not in accordance with the rules of the Spatial Detail Plan (RDTR). Singaporean urban RDTR 2017-2037 has been established and is suitable as a guideline for spatial planning in Tasikmalaya Regency. Also stated in PP number 15 of 2010 in article 101 it is necessary to monitor the use of space every year by the civil service investigating agency (PPNS). The compilation was based on Minister of Public Works Regulation No.20 of 2011 to Minister of ATR Regulation No.16 in 2018. The Singaporean RDTR was prepared in 2011, so monitoring needs to be carried out as a condition for evaluating when there is a change in the legal umbrella. The purpose of this study are: find out the percentage of development realization based on physical conditions in the field; know the development progress in the singaparna urban priority area; and find out trends in spatial development in Singaparna Urban Priority Areas. The method used is a quantitative method (suitability analysis of spatial use and spatial analysis) and qualitative (descriptive analysis). The results obtained from this study are the progress of spatial use in the Singapore Priority Area which shows that there are still many incompatibilities with the RDTR, and the development of the Singapore priority area. In knowing the progress of spatial use by PPNS there needs to be an efficient method in gathering data, then the UAV is one of the efforts in the efficiency of data analysis materials for monitoring space utilization. Abstrak. Dewasa ini tata ruang wilayah menjadi salah satu tantangan dalam perkembangan sebuah kota. Indikasi perkembangan kota dapat dilihat dari meningkatnya kawasan terbangun akibat dari bertambahnya jumlah penduduk. Akibatnya terbatasnya ruang kota, maka banyak lahan kota dimanfaatakan secara illegal atau tidak sesuai dengan aturan Rencana Detail Tata Ruang (RDTR). RDTR perkotaan Singaparna 2017-2037 telah ditetapkan dan layak sebagai pedoman untuk perencanaan tata ruang di Kabupaten Tasikmalaya. Selain itu tertuang dalam PP nomor 15 tahun 2010 dalam pasal 101 perlu adanya pemantauan pemanfaatan ruang setiap tahunnya oleh badan penyidik pegawai negeri sipil (PPNS). Penyusunan tersebut berlandaskan pada Peraturan Menteri PU No.20 tahun 2011 menjadi Peraturan Menteri ATR No.16 tahun 2018. Penyusunan RDTR perkotaan Singaparna dilakukan pada tahun 2011, maka perlu dilakukan pemantauan sebagaimana syarat dalam melakukan evaluasi ketika adanya perubahan payung hukum. Tujuan dari penelitian ini yaitu: mengetahui persentase realisasi pembangunan berdasarkan kondisi fisik dilapangan; mengetahui perkembangan pembangunan dikawasan prioritas perkotaan singaparna; dan mengetahui kecenderungan pembangunan ruang di Kawasan Prioritas Perkotaan Singaparna. Metode yang digunakan adalah metode kuantitatif (analisis kesesuaian pemanfaatan ruang dan analisis spasial) dan kualitatif (analisis deskriptif). Hasil yang diperoleh dari penelitian ini yaitu progres pemanfaatan ruang di Kawasan Prioritas Perkotaan Singaparna yang menunjukan masih banyak ketidak sesuaian dengan RDTR, dan perkembangan kawasan prioritas perkotaan Singaparna. Dalam mengetahui progres pemanfaatan ruang oleh PPNS perlu adanya metode yang efisien dalam pengumpulan datanya, maka UAV adalah salah satu upaya dalam efisiensi bahan data analisis pemantauan pemanfaatan ruangnya.


2018 ◽  
Vol 2 (2) ◽  
pp. 106-113
Author(s):  
Henny Wuryanti K ◽  
Nurita Andriani ◽  
Mohammad Arief

The study aims to determine the effect of the quality of licensing services for Building Construction Permits (IMB) including physical evidence, reliability, responsiveness, assurance, empathy for community satisfaction in the services of the Public Works Office of Cipta Karya and Spatial Planning in Surabaya. The sampling technique uses purposive sampling with a sample size of 187, using data analysis is PLS (Partial Least Square). The results showed that physical evidence, reliability, responsiveness, assurance, and empathy had a significant positive effect on community satisfaction of users of IMB permit services in Surabaya Public Works and Spatial Planning Office.


2020 ◽  
Vol 3 (2) ◽  
pp. 42-49
Author(s):  
Ade Titin Sumarni ◽  
Ade Fitrah Putra Akhir

ABSTRAK : Penelitian ini bertujuan untuk membantu menentukan pemenang tender proyek pada Dinas Pekerjaan Umum dengan cara membuat aplikasi Sistem Pendukung Keputusan dengan menerapkan metode TOPSIS. Aplikasi ini diharapkan dapat mempermudah proses pemilihan pemenang tender proyek tersebut. Dalam penelitian akan membahas masalah yang akan diangkat yaitu membuat dan menghitung variabel pada metode TOPSIS dalam Sistem pendukukung keputusan untuk menentukan pemenang tender pada Dinas Pekerjaan Umum dan Penataan Ruang Provinsi Bengkulu. Waktu dan tempat pengumpulan data dan  penelitian dilaksanakan di Dinas Pekerjaan Umum dan Penataan Ruang Provinsi Bengkulu yang beralamatkan Jalan Prof. Dr. Hazairin, SH No. 901 Bengkulu. Penelitian ini menggunakan metode penelitian waterfall. Dimana metode penelitian waterfall ini Terdiri dari perancangan sistem, analisis sistem, desain sistem, pengkodean program, uji coba program, implementasi sistem dan pemeliharaan sistem. Hasil penelitian ini adalah metode TOPSIS dapat diterapkan pada Sistem Pendukung Keputusan pemilihan pemenang tender proyek pada Dinas Pekerjaan Umum Provinsi Bengkulu menggunakan aplikasi visual basic net 2010. Hasil dari penerapan metode ini dalam aplikasi Sistem Pendukung Keputusan memperoleh hasil yang akurat sehingga dapat menentukan pemenang tender proyek pada Dinas Pekerjaan Umum Provinsi Bengkulu. Kata Kunci: Sistem, Pendukung-Keputusan, Tender.ABSTRACT: This study aims to help determine the winner of a project tender at the Public Works Department by making a Decision Support System application using the TOPSIS method. This application is expected to simplify the process of selecting the winner of the project tender. This research will discuss the problems to be raised, namely creating and calculating variables in the TOPSIS method in the decision support system to determine the winner of the tender at the Bengkulu Province Public Works and Spatial Planning Office. The time and place for data collection and research were carried out at the Bengkulu Province Public Works and Spatial Planning Office which addressed Prof. Dr. Hazairin, SH No. 901 Bengkulu. This study uses the waterfall research method. Where this waterfall research method consists of system design, system analysis, system design, program coding, program testing, system implementation and system maintenance. The results of this study are the TOPSIS method can be applied to the Decision Support System for selecting project tender winners at the Public Works Office of Bengkulu Province using the visual basic net 2010 application. Bengkulu Province Public Works Office. Keywords: Systems, Decision Support, Tender.


2019 ◽  
Vol 3 (1) ◽  
pp. 50
Author(s):  
Rachmad Aidil ◽  
Eko Prihartanto

Road improvements in the city of Tarakan are mostly carried out to support people's welfare. roads in coastal areas in general are far from good, this is seen from the difficulty of access. the coastal area of the city of Tarakan is very dependent on land transportation facilities to meet their daily needs. this research was taken from a road improvement project, so that risks will be observed from the point of view of the Public Works and Spatial Planning Service as the project owner. The methodology used is conducting questionnaires and interviews. respondents from this study were the Public Works and Spatial Planning Service. with the type of qualitative description research. The results obtained in this study were in the form of risk identification that occurred during the road improvement project on the binalatung road in Tarakan City which had 93 overall risk variables after the method of analyzing probability and statistical relevance obtained a risk event rank of 35 variables.


Sign in / Sign up

Export Citation Format

Share Document