scholarly journals PENERAPAN METODE PIECES DALAM PENGEMBANGAN SISTEM INFORMASI MANAJEMEN TUGAS AKHIR (STUDI KASUS : PRODI SISTEM INFORMASI UNIYAP)

2021 ◽  
Vol 15 (2) ◽  
pp. 142
Author(s):  
Salahudin Robo ◽  
Sitti Nur Alam ◽  
Teguh Dwi Julianto

Information Systems study program is one of the study program at the Yapis University of Papua. One of its academic activities, the processing of the Final Project, has not utilized technology optimally which the collection of final project documents are still in print out. This becomes problems faced by study program administrations such as limited storage space, damage and loss of documents, besides that the costs incurred by students are quite large for printing documents. The purpose of this study is to create an integrated final project management system so that it can facilitate the work of all parties that are directly related to student final project management. The analysis method used in this research is the PIECES method, the UML method as the system design, the waterfall as the development method and the Black box testing method used as testing method. For the data collection process, this research uses interview, observation and literature study techniques. The result of this research is a Final Project Management Information System which aims to make easier for students in managing their Final Projects and for facilitate the study program in managing student Final Projects

2020 ◽  
Vol 7 (1) ◽  
pp. 74
Author(s):  
Mardawia Mabe Parenreng ◽  
Fajria Nur ◽  
Asriyadi Asriyadi

Each laboratory has a person in charge (technician) that has a duty of serving the laboratory in term of operational and maintenance. The main task of a technician is to record and monitor the condition and completeness of laboratory equipment in the laboratory. The data collection process is done by writing a tool request form, therefore mistakes often occur. In this research, an Android-based laboratory asset monitoring and inventory application was made. By using the application, it is expected that technicians become easier to make any duties of reports including report of damaged laboratory equipments, request for reparation, the unavailable practical materials etc simply by using a Smartphone. Testing the application with the Black-Box testing method to investigate the function of each application component whether it is running well or not. The results obtained from the Black-Box test are the functions of each component were running as expected. The case study is conducted for Electrical Engineering Department at State Polytechnic of Ujung Pandang (SPUP)


Petir ◽  
2020 ◽  
Vol 13 (1) ◽  
pp. 12-20
Author(s):  
Eka Wahyudi ◽  
Indra Pratiwi

Information system is a matter that must be owned by an agency to be able to support managerial activities and performance in any field. Each agency must have its own information system. The system built in this study is the Final Project Management and Internal Research Journal of the Informatics Engineering Department at the Ketapang State Polytechnic. This analysis is used by collecting data in research. In designing, the authors create a computerized work through the process of designing component models, databases, and user interface components. This system is designed to provide information for students about each Final Project from students of the Informatics Engineering Study Program at the State Polytechnic of Ketapang. Final Project Management can provide services to students. Therefore this study aims to develop IT technology in the Informatics Engineering Department of the Ketapang State Polytechnic. This system was built to facilitate users such as admins and students in managing student final assignments.


Author(s):  
Ni'mah Tozahro ◽  
Afrizal Nursin

In construction industry, its implementation of the construction  has its own constraints. A good management or project management system is needed to minimize the risk of these constraints. The latest project management concept that has proven more effective and efficient is Last Planner System method. This study aims to investigate how the implementation of Last Planner System works on Jakarta-Cikampek II Elevated Toll Road Project. With the evaluation of weekly job evaluations using PPC (Percent Plan Completed) and Pareto Variance Constraint analysis, the constraint issues of this project will be identified. Then they are followed up to find the right solution in handling the constraints. The research method is done by conducting literature study, problem formulation, followed by implementing LPS method, which is through work flow control such as phase and pull plan, lookahead plan, constrain analysis, daily huddles, PPC (Percent Plan Completed) calculation, Pareto Chart analysis with data variation of issues that have been obtained. The results show that the average PPC weekly project is 83.04% and the most influential reason that must be concerned its priority is submittals.


Author(s):  
Adhe Rama Febrianto ◽  
Anita Wulansari ◽  
Latipah Latipah

Vsualproject is a business unit of Visi Prima Group which is located in Gresik, a business engaged in software development. In working on the project, the Vsualproject is required to complete the task on time as well as under the customers' requirement. Current management processes were still done manually which consist of recording in the Whatsapp application chat group. In a software development project, it is also necessary to develop the desired interests to find out whether it is under the organization' demands and needs. Keeping notes in the WhatsApp chat group makes notes frequently disappeared and the search process was more complicated about who requests the development process. The purpose of this research is to develop a system that can help Vsualproject to manage projects and provide services to their customers with the project monitoring feature. The system was developed using the Scrum pattern Agile development method which was carried out during the four-cycle sprints. The results of the development of the system were tested by the Black Box Testing method to ensure that the system meets the user's requirements. The result of this study produced a project management system that can be used by internal users of Vsualproject management projects includes managing the stages, payment, and project’s works. The system can also be used by customers to monitor projects through a web profile without asking for special access rights.


2020 ◽  
Vol 5 (1) ◽  
pp. 61
Author(s):  
Vadlan Febrian ◽  
Muhamad Rizki Ramadhan ◽  
Muhammad Faisal ◽  
Aries Saifudin

In this employee payroll application, if there is an error program there will be a loss for employees and the company. Losses for employees, if this application program error occurs then the salary reduction will experience delays due to the difficulty in the process of calculating employee salaries and employees will be late in receiving salaries. Losses for the company, if there is an error program in this application, the company will suffer losses if the employee wants a salary reduction quickly but the company cannot calculate quickly and accurately. In solving this problem, the authors use the black box testing method. Black box testing method is a test that sees the results of execution through test data and ensures the function of the software. Black box testing method has several testing techniques, namely Sample Testing, Boundary Value Analysis, Equivalence Partitions and others. From the testing techniques that have been mentioned, we use the Equivalence Partitions testing technique. Equivalence Partitions are tests that refer to data entry on the employee payroll application form, input will be tested and then put together based on the test function, both valid and invalid values. The expected results of this test are a payroll system for employees who are computerized, have standard rules in the process of developing the program so that it is easy to develop and maintain, and can minimize errors in processing salary calculations for employees.


2020 ◽  
Vol 24 (1) ◽  
Author(s):  
Nfn Darmanto ◽  
Nur Zaini

AbstrakPenelitian ini dilatarbelakangi oleh menguatnya wacana mengenai pentingnya perlindungan data pribadi  dan terbitnya Peraturan Menteri Komunikasi dan Informatika Nomor 20 Tahun 2016 tentang Perlindungan Data Pribadi dalam Sistem Elektronik. Adapun tujuan penelitian adalah untuk mengetahui kinerja implementasi Peraturan Menteri tersebut di lingkungan Pemerintah Kabupaten. Penelitian  dilakukan di Dinas Kependudukan dan Pencatatan Sipil pada Pemerintah Kabupaten Gianyar, Temanggung, dan Sleman dengan menggunakan metode studi kasus, sedangkan pengum­pu­lan data menggunakan teknik studi pustaka, wawancara, dan observasi. Pembahasan dilakukan dengan menggunakan konsep implemen­tasi model Edwards yang melihat implementasi berdasarkan variabel komunikasi, sumber-sumber, kecenderungan-kecenderu­ngan, dan struk­tur birokrasi. Hasil penelitian menunjuk­kan bahwa penyelenggaraan administrasi kependudukan yang di dalamnya termasuk perlindungan data pribadi oleh Dinas Kependudukan dan Pencatatan Sipil merujuk pada Peraturan Menteri Dalam Negeri Nomor 61 Tahun 2015, sedangkan Peraturan Menteri Komunikasi dan Informatika Nomor 20 tahun 2016 sama sekali belum mereka ketahui. AbstractThis research is motivated by the strengthening of discourse regarding the importance of protecting personal data and the issuance of Minister of Communication and Information Regulation No. 20 of 2016 concerning Protection of Personal Data in Electronic Systems. The research objective is to determine the performance of the implementation of the Ministerial Regulation within the District Government. The study was conducted at the Department of Population and Civil Registration at the Government of the Regency of Gianyar, Temanggung, and Sleman by using a case study method, while data collection using literature study techniques, interviews, and observations. The discussion was carried out using the concept of implementation of Edwards model that looked at implementation based on communication variables, sources, trends, and bureaucratic structure. The results showed that the administration of population administration which included the protection of personal data by the Population and Civil Registry Office referred to the Minister of Home Affairs Regulation No. 61 of 2015, while the Minister of Communication and Information Regulation No. 20 of 2016 was completely unknown to them.   


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


2020 ◽  
Vol 15 (2) ◽  
pp. 353-378
Author(s):  
Muhammad Majdy Amiruddin ◽  
Muhammad Ismail ◽  
Hasanuddin Hasim

The reviving of modern economic theory is usually stated starting from the publication of Adam Smith's The Wealth of Natoins, in 1776, although other thinkers who first also gave no small contribution. The main idea put forward by Adam Smith is that competition between various suppliers of goods and buyers will produce the best possibilities in the distribution of goods and services because it will encourage everyoe to do the specialization and increase in capital so that it will produce more value with a permanent workforce. From the Islamic perspective, there are several names that commonly known such, Baqir, Umar Chapra, and Mannan. The purpose of this research is to explore the revival economic though by Abdul Mannan. This research adapts content analysis method, which is a researcher conducts a discussion of the contents of written or edition information in the mass media. The data analysis techniques of this scientific work use literature study techniques, comparative, induction, and deduction. The study began by collecting literature data from Muhammad Abdul Mannan's Concept of Thinking about the Development of Modern Era Islamic economics and Modern Era Islamic Economic concepts in general, (researchers only participated in the discussion). Then proceed with the interpretation that researchers try to understand Muhammad Abdul Mannan's thoughts about the Development of Islamic Economics in the Modern Era. The result of this reseacrh indicates that the revival of Islamic thought by determining basic economic functions that simply cover three functions, namely consumption, production and distribution. Those basics are rooted by Five basic principles rooted in Shariah for basic economic functions in the form of consumption functions are the principles of righteousness, cleanliness, moderation, benefit and morality


Sign in / Sign up

Export Citation Format

Share Document