Foristek
Latest Publications


TOTAL DOCUMENTS

43
(FIVE YEARS 43)

H-INDEX

0
(FIVE YEARS 0)

Published By Universitas Tadulako

2579-7174, 2087-8729

Foristek ◽  
2021 ◽  
Vol 11 (2) ◽  
Author(s):  
Abdi Rayatman ◽  
Yusnaini Arifin ◽  
Sari Dewi ◽  
Mardiansyah Mardiansyah

Automatic Transfer Switch (ATS) is a device that can move the main power source to a backup power source automatically and quickly when the main power source experiences a disturbance or cut-off of supply to the load. In this study, ATS was designed based on the Arduino Nano microcontroller as an automatic control that works based on voltage readings. Using the Arduino Nano microcontroller can facilitate the process of making tools and minimize the use of components. This ATS uses the PZEM-004T voltage sensor module. The voltage sensor module functions to detect and measure the value of the PLN voltage. From the test results, it was found that the time lag between the PLN supply being cut off until the generator was turned on and ready to load was an average of 2.76 seconds. Meanwhile, the time lag when the PLN supply turns on again until the generator supply is cut off and the load supply is again served by PLN is an average of 1.74 seconds. All working status of this ATS panel can be displayed on the LCD indicator, indicator light and analog voltmeter.


Foristek ◽  
2021 ◽  
Vol 11 (2) ◽  
Author(s):  
Selviana Selviana ◽  
Mery Subito ◽  
Rizana Fauzi ◽  
Alamsyah Alamsyah

The design of this IoT (Internet of Things)-based post-stroke patient monitoring tool was built to monitor patient progress remotely. Flex sensor hardware was used to retrieve data from every movement of the patient's finger muscle strength, then processed by the NodeMCU ESP32 after that the data will be sent to the web server via the IoT platform using a local wireless network. The results of research on the development of post-stroke patients can be displayed to a web server in the form of a table plot of data values for the index finger, middle finger, and ring finger. The post-stroke patient monitoring system can be accessed on PC and Android devices. The results of the sample test from the device obtained the highest value of 3.26 MMT and the lowest value of 0.2 MMT so that the patient's finger muscle strength was declared unstable and frequent changes in muscle strength.


Foristek ◽  
2021 ◽  
Vol 11 (2) ◽  
Author(s):  
Jordan A. Tiro ◽  
Baso Mukhlis ◽  
Agustinus Kali ◽  
Irwan Mahmudi

Electrical energy has a very important role in the economic, industrial and social development of the community, this causes an increase in the demand for electrical energy in line with the increase in people's welfare, economic and industrial growth. On the other side, energy sources that are commonly used for power generation are increasingly expensive and limited in availability and cause environmental pollution. Based on these considerations, it is necessary to implement an energy management program to preserve energy resources and use energy effectively. Energy consumption intensity (ECI) is a term used to determine the amount of electrical energy consumption in a room. The calculation of the intensity of energy consumption carried out at the Tojo Una-una regent's office in Central Sulawesi consists of 3 buildings with 129 rooms, it was found that 7 rooms were categorized as quite efficient and wasteful.


Foristek ◽  
2021 ◽  
Vol 11 (2) ◽  
Author(s):  
Moh. Riyadh Dirga Pahlevi ◽  
Ardi Amir ◽  
Tan Suryani Sollu ◽  
Muh. Aristo Indrajaya

Transformers play an important role in generating electrical energy so that in maintaining their performance this transformer has a lot of protection so that the transformer can work as much as possible. Many things can interfere with transformers, namely when the transformer is overheated, a short circuit occurs, or is struck by lightning causing the transformer to burn, so a system that can provide fast, and extensive information is needed and is handled automatically by monitoring the temperature of the main transformer using a smartphone connected to the internet network. In this study, 2 DS18B20 sensors were used which were equipped with a Manual Call Point (MCP) as input and an ESP32 microcontroller module in which there was a Wi-Fi module as a data processor, then the output data would be sent via the internet to the Internet Of Things (IoT) platform for display. In the form of values, graphs, and notifications. The measurement results are in the form of temperature units in C which will be displayed via a smartphone using the Blynk IoT platform in the form of numbers and graphs in real-time according to the value detected by the sensor. Tests on sensors resulted in an average error of 3.29% on the Low side and 3.01% on the Upside.


Foristek ◽  
2021 ◽  
Vol 11 (2) ◽  
Author(s):  
Duldes S. Lambey ◽  
Nurhani Amin ◽  
Yulius S. Pirade ◽  
Rudi Santoso

Audit of Electrical Energy at the Regional House of Representatives of the Tojo Una-Una District is a comprehensive method in examining energy use in a building to find the value of Energy Consumption Intensity (IKE) and Energy Saving Opportunities (PHE) that can be obtained to reduce energy waste so that the consumption of electrical energy is more effective and efficient. The audit of Electrical Energy is carried out according to SNI 03-6196-2000 concerning Energy audit procedures in buildings and the Regulation of the Minister of Energy and Mineral Resources of the Republic of Indonesia Number 13 of 2012 concerning Savings Electricity Consumption. The results of the evaluation of the Energy Consumption Intensity Calculation conducted at the Office of the Regional House of Representatives of Tojo Una-Una District known that there are 16 rooms with the criteria for the Energy Consumption Intensity (IKE) value, namely an office building with air conditioning has efficient enough 8 rooms, wasteful 3 rooms and based on office buildings without Air-conditioning is quite efficient in 3 rooms and wasteful in 2 rooms. The results of Energy Saving Opportunities (PHE) that have been identified by using air conditioning and energy-saving lamps, reducing hours of use without reducing the quality of service in the office can save electricity consumption of 2.339,5165 kWh/month or save electricity bill payments of IDR. 3.379.899,60/month.


Foristek ◽  
2021 ◽  
Vol 11 (2) ◽  
Author(s):  
Agus Siswanto ◽  
Reza Alfian ◽  
Erfan Subyanta

In an effort to provide reliable and efficient electrical energy, substations have an important role in regulating the demand for electric power loads and as a center for securing electrical power system components in a certain area. Frequent disturbances become a benchmark for an electric power system whether or not it is good or not in an effort to provide reliable and efficient energy. One of the maintenance measures is temperature measurement using thermal imagers, which is commonly referred to as thermovision measurement.Thermal imager is a tool that can be used for predictive maintenance activities to monitor the condition and performance of an equipment so that the possibility of equipment failure can be minimized. In October 2020, after thermovisiting transformer bay 6 at the Sunyaragi substation, it was discovered that there was a hotspot on the T-phase separation blade, causing heating of the blade, the above conditions can result in a decrease in PMS performance, with the worst condition if left alone can result in damage to the PMS blade and can also melt when the peak load is on the transformer 6. Under these conditions, maintenance is carried out by maintaining contact resistance, insulation resistance, and grounding resistance. The results of the analysis of contact resistance after maintenance show that the equipment is in good condition and still suitable for use, with a value of 7μΩ for the R phase, 6.5μΩ for the S phase, and 6.7μΩ for the T phase.


Foristek ◽  
2021 ◽  
Vol 11 (2) ◽  
Author(s):  
Ardiansyah Ardiansyah ◽  
Mustofa Mustofa ◽  
Iskandar Iskandar ◽  
Andi Idhan ◽  
Yuli Asmi Rahman

Heat transfer is the transfer of energy from one area to another due to the temperature difference between these areas. Wasted heat energy can be converted into electricity using (TEG) between the hot and cold sides. If the temperature difference is more significant, the efficiency may increase along with the operating temperature of the TEG-type material. So in this study, the author will calculate the heat transfer that occurs in Photovoltaic (PV), Thermoelectric Generator (TEG), and Hot Mirrors by utilizing thermal energy light produced from Muxindo LED bulbs with 10 Watt, 15 Watt, and 20 Watt power. The results of this study indicate that by using 10, 15, and 20 Watt LED bulbs for free convection heat transfer, the power generated from each point increases because it passes through several obstacles from objects that experience a decrease in temperature to PV and TEG, with the characteristics of the displacement. The movement of molecules from the medium importance follows convection heat at every point of transfer in the intermediate substance. The most significant power generated from radiant heat transfer is about 0.1873 Watt. It occurs on the surface of the fresnel lens using a 20 Watt LED bulb with the characteristic that the radiation propagates in a straight line and does not require an intermediate medium to transfer heat from one substance to another. The most significant conduction heat transfer power, 0.2453 Watt, occurs in Fresnel Lens using a 20 Watt LED bulb with heat transfer characteristics in solid objects.


Foristek ◽  
2021 ◽  
Vol 10 (2) ◽  
Author(s):  
Mohamad Risky ◽  
Maryantho Masarrang ◽  
Sari Dewi

Power of energy generated from station is the some all the phase. The use of electricity as well as efforts to satisfy customers or consumers of electricity by optimizing the distribution network. By evaluating the distribution network of PT. PLN with the ODK (Open Data Kit) collect method will make it easier to take field samples, find out the long distance of the transformer point by making an arcgis simulation distribution map. After all the data is obtained then to find the voltage drop can be done by analyzing the length of the stretch, the power of the transformer so that it will be known what percentage of voltage drop in the location farthest from the power center.


Foristek ◽  
2021 ◽  
Vol 11 (1) ◽  
Author(s):  
Uswatun Hasanah ◽  
Mery Subito ◽  
Muhammad Aristo Indrajaya

Current road users cannot be separated from the number of violators, therefore traffic lights are made to regulate traffic on the road. At traffic lights, there is also a zebra crossing which serves as a means of crossing the road for pedestrians. To minimize violations at road intersections, researchers designed a tool to detect traffic violations. Traffic violation detection tool is made in prototype form using a control system with Arduino nano and software. This traffic light system uses LDR and laser sensors to detect these violations by cutting the laser which sends light to the LDR. This tool is also equipped with a webcam camera that functions to photograph violations that occur and a buzzer that functions as a warning to officers and riders in the event of a violation with an average response speed of the webcam of 2.37 seconds and the average response speed of the buzzer is 0.4 seconds. . The snapshot from the webcam is saved automatically on your PC / Laptop.


Foristek ◽  
2021 ◽  
Vol 10 (2) ◽  
Author(s):  
Yusuf Yusuf ◽  
Agustinus Kali ◽  
Yulius S. Pirade

Electricity has become a basic need for various human activities, because electricity has functions and benefits that are vital in daily life which has become a basic need in encouraging national development in all fields. One part of the world electricity is the installation of lighting that is also me njadi one of the main points in a building, it is very necessary that human activity has remained secure and running smoothly. In this study, the writer will design an electrical installation for a building, namely the office building of the Population and Family Planning Control Office (P2KB) of Central Sulawesi Province, JL. RA Kartini NO. 100 Palu City. This study aims to make an electrical installation design in accordance with the Indonesian National Standard (SNI) and the General Electrical Installation regulations (PUIL), so that the installation is designed to be more effective and efficient. In the design of this installation also made design drawings for installation in buildings. Based on the design planning of the electrical installation that has been done, the results are obtained, the total electrical power from the electrical installation of this building is 60246 watts or 75307 VA and for electricity supply is taken from PLN, namely 3-phase electricity with a capacity of 82,500 VA. The conductor used in this installation uses NYY and NYM cable types. The security used in this installation consists of 2 types, namely NFB and MCB , in addition to this building installation system is also given a PHB box to facilitate maintenance and repair in case of damage. Taking into account the economic and safety factors of the installation, the total Budget Plan (RAB) for the installation of the building of the Population and Family Planning Control Office (P2KB) is Rp. 223,600,000


Sign in / Sign up

Export Citation Format

Share Document