scholarly journals Exact Solution of the Harmonic Problem for a Rectangular Plate in Flat Deformation by the Method of Initial Functions

2017 ◽  
Vol 22 (2) ◽  
pp. 349-361
Author(s):  
E.T. Olodo ◽  
V. Adanhounme ◽  
M.N. Hounkonnou

Abstract A wide range of applications is based nowadays on analytical developments which allow a precise and effective approach and short time of computations compared with the time required for numerical methods; in this way these developments are suitable for calculations in real time. This work proposes an approach for solving a two-dimensional harmonic problem of a rectangular plate under local surface loading using Vlasov’s symbolic method of initial functions and a general solution of the harmonic equation for a rectangle. Substituting the harmonic functions in symbolic form for the corresponding solutions allows us to give the exact solution of the problem in trigonometric form.

Author(s):  
Anthony S-Y Leong ◽  
David W Gove

Microwaves (MW) are electromagnetic waves which are commonly generated at a frequency of 2.45 GHz. When dipolar molecules such as water, the polar side chains of proteins and other molecules with an uneven distribution of electrical charge are exposed to such non-ionizing radiation, they oscillate through 180° at a rate of 2,450 million cycles/s. This rapid kinetic movement results in accelerated chemical reactions and produces instantaneous heat. MWs have recently been applied to a wide range of procedures for light microscopy. MWs generated by domestic ovens have been used as a primary method of tissue fixation, it has been applied to the various stages of tissue processing as well as to a wide variety of staining procedures. This use of MWs has not only resulted in drastic reductions in the time required for tissue fixation, processing and staining, but have also produced better cytologic images in cryostat sections, and more importantly, have resulted in better preservation of cellular antigens.


Author(s):  
Kenji Ikeda ◽  
Yusuke Kawamura ◽  
Masahiro Kobayashi ◽  
Taito Fukushima ◽  
Yushi Sorin ◽  
...  

Background: Although DC Bead has been useful in treatment of multiple and large hepatocellular carcinoma, loading time of doxorubicin into the DC Bead takes a long time of 30-120 minutes. Epirubicin is also used as an antitumor agent together with DC Bead, but its loading efficiency was not sufficiently elucidated. Methods: To shorten loading time of epirubicin into DC Bead (100-300µm, 300-500µm, 500-700µm), we examined the following three methods after mixing the drug: (a) let stand in room temperature, (b) agitated for 30 seconds with Vortex mixer, and (c) sonicated for 30 seconds with ultrasonic cleaner. After loading of epirubicin by each method, supernatant concentration for epirubicin was assayed at 5, 10, 30, 60, and 120 minutes. Results: Epirubicin loading rates for small bead (100-300µm) at 5 minutes were 82.9 % in group a, 93.8% in group b, and 79.9 % in group c. Similarly, medium bead (300-500µm), 40.1% in group a, 65.7% in group b and 45.5% in group c, respectively. In large-sized bead (500-700µm), loaded rates of epirubicin were 38.8% in group a, 59.0% in group b and 48.0% in group c. Agitation of mixture of epirubicin and DC Bead with Vortex mixer significantly shortened the loading time, but sonication did not affect the time required. Microscopic examination did not lead to any morphological change of microspheres in all the methods. Conclusions: Short time of agitation with Vortex mixer reduced the necessary time for loading of epirubicin in every standard of DC Bead.


Author(s):  
Trần Thanh Nhàn

In order to observe the end of primary consolidation (EOP) of cohesive soils with and without subjecting to cyclic loading, reconstituted specimens of clayey soils at various Atterberg’s limits were used for oedometer test at different loading increments and undrained cyclic shear test followed by drainage with various cyclic shear directions and a wide range of shear strain amplitudes. The pore water pressure and settlement of the soils were measured with time and the time to EOP was then determined by different methods. It is shown from observed results that the time to EOP determined by 3-t method agrees well with the time required for full dissipation of the pore water pressure and being considerably larger than those determined by Log Time method. These observations were then further evaluated in connection with effects of the Atterberg’s limit and the cyclic loading history.


2021 ◽  
Vol 31 (1) ◽  
Author(s):  
Cenk Yucel

Abstract Background The two-spotted spider mite, Tetranychus urticae (Koch) (Acari: Tetranychidae), is a widely distributed plant-feeding pest that causes significant yield losses in a wide range of crops. Newly developed or improved environmentally friendly biocontrol agents serve as an alternative to traditional pest control tools. Experiment of the effects of 2 local fungal isolates of Beauveria bassiana (BGF14 and BCA32) was carried out against T. urticae under laboratory conditions. Results Both tested isolates had lethal effect in a short time after application, and this effect increased as time progressed. BGF14 and BCA32 isolates caused T. urticae mortality rates ranging from 25.88 to 61.92 and 32.36 to 62.03% when applied at the concentrations between 1×105 and 1×108 conidia/ml, respectively. According to the Probit analysis performed on the effect of fungi on T. urticae adults, the LC50 values of BGF14 and BCA32 isolates on the 7th day after inoculation were 2.6×106 and 6.3×104 conidia/ml, respectively, and the LT50 values for both fungi applied at a concentration of 108 conidia/ml were 2.14 and 2.23 days, respectively. Conclusions The 2 isolates of B. bassiana (BGF14 and BCA32) had the potentials to suppress T. urticae population and can be recommended as promising biocontrol agent candidates for control of T. urticae.


Agronomy ◽  
2019 ◽  
Vol 9 (11) ◽  
pp. 673 ◽  
Author(s):  
John Clifton-Brown ◽  
Kai-Uwe Schwarz ◽  
Danny Awty-Carroll ◽  
Antonella Iurato ◽  
Heike Meyer ◽  
...  

Miscanthus, a C4 perennial grass native to Eastern Asia, is being bred to provide biomass for bioenergy and biorenewable products. Commercial expansion with the clonal hybrid M. × giganteus is limited by low multiplication rates, high establishment costs and drought sensitivity. These limitations can be overcome by breeding more resilient Miscanthus hybrids propagated by seed. Naturally occurring fast growing indigenous Miscanthus species are found in diverse environments across Eastern Asia. The natural diversity provides for plant breeders, the genetic resources to improve yield, quality, and resilience for a wide range of climates and adverse abiotic stresses. The challenge for Miscanthus breeding is to harness the diversity through selections of outstanding wild types, parents, and progenies over a short time frame to deploy hybrids that make a significant contribution to a world less dependent on fossil resources. Here are described the strategies taken by the Miscanthus breeding programme at Aberystwyth, UK and its partners. The programme built up one of the largest Miscanthus germplasm collections outside Asia. We describe the initial strategies to exploit the available genetic diversity to develop varieties. We illustrate the success of combining diverse Miscanthus germplasm and the selection criteria applied across different environments to identify promising hybrids and to develop these into commercial varieties. We discuss the potential for molecular selections to streamline the breeding process.


2014 ◽  
Vol 660 ◽  
pp. 971-975 ◽  
Author(s):  
Mohd Norzaim bin Che Ani ◽  
Siti Aisyah Binti Abdul Hamid

Time study is the process of observation which concerned with the determination of the amount of time required to perform a unit of work involves of internal, external and machine time elements. Originally, time study was first starting to be used in Europe since 1760s in manufacturing fields. It is the flexible technique in lean manufacturing and suitable for a wide range of situations. Time study approach that enable of reducing or minimizing ‘non-value added activities’ in the process cycle time which contribute to bottleneck time. The impact on improving process cycle time for organization that it was increasing the productivity and reduce cost. This project paper focusing on time study at selected processes with bottleneck time and identify the possible root cause which was contribute to high time required to perform a unit of work.


1998 ◽  
Vol 550 ◽  
Author(s):  
V.P. Shastri ◽  
I. Martin ◽  
R. Langer

AbstractPorous polymeric media are used in several applications such as solid supports for separations and catalysis, as well as biomedical applications such as vascular grafts and wound dressings. We have developed a novel versatile process to produce polymeric cellular solids. This process which is based on a phase extraction-co-polymer precipitation is applicable to a wide range of polymer systems including water soluble polymers. It is capable of yielding polymer foams of high porosity (> 90%) and excellent mechanical characteristics in a very short time (less than 2 hours) without limitations in foam thickness. Polymer foam with such characteristics have great utility in tissue engineering applications. We have successfully explored polymer foams of biocompatible polymers produced by the presented approach for bone and cartilage engineering using bone marrow stromal cells.


2020 ◽  
Vol 41 (S1) ◽  
pp. s69-s70
Author(s):  
Angie Dains ◽  
Michael Edmond ◽  
Daniel Diekema ◽  
Stephanie Holley ◽  
Oluchi Abosi ◽  
...  

Background: Including infection preventionists (IPs) in hospital design, construction, and renovation projects is important. According to the Joint Commission, “Infection control oversights during building design or renovations commonly result in regulatory problems, millions lost and even patient deaths.” We evaluated the number of active major construction projects at our 800-bed hospital with 6.0 IP FTEs and the IP time required for oversight. Methods: We reviewed construction records from October 2018 through October 2019. We classified projects as active if any construction occurred during the study period. We describe the types of projects: inpatient, outpatient, non–patient care, and the potential impact to patient health through infection control risk assessments (ICRA). ICRAs were classified as class I (non–patient-care area and minimal construction activity), class II (patients are not likely to be in the area and work is small scale), class III (patient care area and work requires demolition that generates dust), and class IV (any area requiring environmental precautions). We calculated the time spent visiting construction sites and in design meetings. Results: During October 2018–October 2019, there were 51 active construction projects with an average of 15 active sites per week. These sites included a wide range of projects from a new bone marrow transplant unit, labor and delivery expansion and renovation, space conversion to an inpatient unit to a project for multiple air handler replacements. All 51 projects were classified as class III or class IV. We visited, on average, 4 construction sites each week for 30 minutes per site, leaving 11 sites unobserved due to time constraints. We spent an average of 120 minutes weekly, but 450 minutes would have been required to observe all 15 sites. Yearly, the required hours to observe these active construction sites once weekly would be 390 hours. In addition to the observational hours, 124 hours were spent in design meetings alone, not considering the preparation time and follow-up required for these meetings. Conclusions: In a large academic medical center, IPs had time available to visit only a quarter of active projects on an ongoing basis. Increasing dedicated IP time in construction projects is essential to mitigating infection control risks in large hospitals.Funding: NoneDisclosures: None


EP Europace ◽  
2021 ◽  
Author(s):  
Monika Gawałko ◽  
David Duncker ◽  
Martin Manninger ◽  
Rachel M J van der Velden ◽  
Astrid N L Hermans ◽  
...  

Abstract Aims TeleCheck-AF is a multicentre international project initiated to maintain care delivery for patients with atrial fibrillation (AF) during COVID-19 through teleconsultations supported by an on-demand photoplethysmography-based heart rate and rhythm monitoring app (FibriCheck®). We describe the characteristics, inclusion rates, and experiences from participating centres according the TeleCheck-AF infrastructure as well as characteristics and experiences from recruited patients. Methods and results Three surveys exploring centre characteristics (n = 25), centre experiences (n = 23), and patient experiences (n = 826) were completed. Self-reported patient characteristics were obtained from the app. Most centres were academic (64%) and specialized public cardiology/district hospitals (36%). Majority of the centres had AF outpatient clinics (64%) and only 36% had AF ablation clinics. The time required to start patient inclusion and total number of included patients in the project was comparable for centres experienced (56%) or inexperienced in mHealth use. Within 28 weeks, 1930 AF patients were recruited, mainly for remote AF control (31% of patients) and AF ablation follow-up (42%). Average inclusion rate was highest during the lockdown restrictions and reached a steady state at a lower level after easing the restrictions (188 vs. 52 weekly recruited patients). Majority (>80%) of the centres reported no problems during the implementation of the TeleCheck-AF approach. Recruited patients [median age 64 (55–71), 62% male] agreed that the FibriCheck® app was easy to use (94%). Conclusion Despite different health care settings and mobile health experiences, the TeleCheck-AF approach could be set up within an extremely short time and easily used in different European centres during COVID-19.


1942 ◽  
Vol 9 (4) ◽  
pp. A171-A174
Author(s):  
Samuel Levy

Abstract This paper presents an exact solution in terms of infinite series of the problem of buckling by compressive forces in one direction of a rectangular plate with built-in edges (zero slope, zero displacement in the direction normal to the plane of the plate). The buckling load is calculated for 14 ratios of length to width, ranging in steps of 0.25 from 0.75 to 4. On the basis of convergence, as the number of terms used in the infinite series is increased, it is estimated that the possible error in the numerical results presented is of the order of 0.1 per cent. A comparison is given with the work of other authors.


Sign in / Sign up

Export Citation Format

Share Document