Biological treatment of industrial wastes in a photobioreactor

2006 ◽  
Vol 53 (11) ◽  
pp. 117-125 ◽  
Author(s):  
E. Tamer ◽  
M.A. Amin ◽  
E.T. Ossama ◽  
M. Bo ◽  
G. Benoit

An algal-bacterial consortium was tested for the treatment from a coke factory. A Chlorella vulgaris strain and a phenol-degrading Alcaligenes sp. were first isolated from the wastewater treatment plant to serve as inocula in the subsequent biodegradation tests. Batch tests were then conducted with samples from the real wastewater or using a synthetic wastewater containing 325 mg phenol/l and 500 mg NH4+/l as target pollutants. Direct biological treatment of the real wastewater was not possible due to the toxicity of organic compounds. Activated carbon adsorption and UV(A-B)-irradiation were efficient in detoxifying the effluent for subsequent biological treatment as inoculation of pretreated samples with the algal-bacterial consortium was followed by complete phenol removal and NH4+ removal of 45%. Complete phenol removal and 33% NH4+ removal were achieved during the fed-batch treatment of artificial wastewater at 6 d hydraulic retention time (HRT). Under continuous feeding at 3.6 d HRT, phenol and NH4+ removal dropped to 58 and 18%, respectively. However, complete phenol removal and 29% NH4+ removal were achieved when 8 g NaHCO3/l was added to the artificial wastewater to enhance algal growth. This study confirms the potential of solar-based industrial wastewater treatment based on solar-based UV pretreatment followed by algal-bacterial biodegradation.

2008 ◽  
Vol 58 (2) ◽  
pp. 435-438 ◽  
Author(s):  
M. Kornaros ◽  
C. Marazioti ◽  
G. Lyberatos

SBRs are usually preferred as small and decentralized wastewater treatment systems. We have demonstrated previously that using a frequent enough switching between aerobic and anoxic conditions and a specific to the treated wastewater aerobic to anoxic phase ratio, it is possible to by-pass the second step of nitrification (i.e. conversion of nitrite to nitrate nitrogen). This innovative process for nitrate by-pass has been branded as UP-PND (University of Patras-Partial Nitrification Denitrification) (WO 2006/129132). The proved methodology was successfully transferred from a lab-scale SBR reactor treating synthetic wastewater to a pilot-scale SBR system treating real wastewater. In this work we present the results from the operation of this pilot-scale SBR, constructed in the Wastewater Treatment Plant of Patras (Greece), using 6-hour, 8-hour and 12-hour cycles. It is demonstrated that three pairs of aerobic/anoxic phases with a relative duration of 1:2 (8-hour cycle) and 2:3 (12-hour cycle) secures the desired by-pass of nitrate production.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 153-160 ◽  
Author(s):  
Pradeep Kumar ◽  
R. J. Garde

With increasing stress on existing wastewater treatment systems, it is necessary either to upgrade the treatment unit(s) or install an entirely new treatment plant. Obviously, the upgrading is preferred over the alternative of having a new system. Keeping this in view, in the present project, an attempt has been made to explore the possibility of upgrading existing facultative ponds using water hyacinth. Bench-scale batch studies were designed to compare the performance of hyacinth treatment system with facultative ponds. Investigations were carried out with synthetic wastewater having COD in the range of 32.5-1090 mg/l. The efficiency of COD removal in water hyacinth ponds was 15-20 percent more than the facultative ponds. Based on the results, an empirical model has been proposed for COD removal kinetics. In the second phase of the project a hyacinth pond was continuously operated. BOD, COD, TS, TN, TP, pH, and DO were regularly monitored. However, the DO of the effluent from hyacinth treatment system was considerably reduced. Effluent should be aerated before it is discharged. The results indicate that the existing facultative ponds can be stalked with water hyacinth to improve their performance as well as hyacinth treatment systems can be installed to support the conventional treatment.


1994 ◽  
Vol 30 (5) ◽  
pp. 87-95 ◽  
Author(s):  
Susan E. Murcott ◽  
Donald R. F. Harleman

In the past decade, the development of polymers and new chemical technologies has opened the way to using low doses of chemicals in wastewater treatment. “Chemical upgrading” (CU) is defined in this paper as an application of these chemical technologies to upgrade overloaded treatment systems (typically consisting of conventional primary plus biological treatment) in Central and Eastern European (CEE) countries. Although some of the chemical treatment technologies are proven ones in North America, Scandinavia, and Germany, a host of factors, for example, the variations in composition and degree of pollution, the type of technologies in use, the type and mix of industrial and domestic sewage, and the amount of surface water, had meant that the viability of using CU in CEE countries was unknown. This report describes the first jar tests of CU conducted during the summer of 1993. The experiments show CU's ability to improve wastewater treatment plant performance and to potentially assist in the significant problem of overloaded treatment plants. Increased removal of BOD, TSS, and P in the primary stage of treatment is obtained at overflow rates above 1.5 m/h, using reasonably priced, local sources of metal salts in concentrations of 25 to 50 mg/l without polymers.


2008 ◽  
Vol 57 (8) ◽  
pp. 1287-1293 ◽  
Author(s):  
A. Jobbágy ◽  
G. M. Tardy ◽  
Gy. Palkó ◽  
A. Benáková ◽  
O. Krhutková ◽  
...  

The purpose of the experiments was to increase the rate of activated sludge denitrification in the combined biological treatment system of the Southpest Wastewater Treatment Plant in order to gain savings in cost and energy and improve process efficiency. Initial profile measurements revealed excess denitrification capacity of the preclarified wastewater. As a consequence, flow of nitrification filter effluent recirculated to the anoxic activated sludge basins was increased from 23,000 m3 d−1 to 42,288 m3 d−1 at an average preclarified influent flow of 64,843 m3 d−1, Both simulation studies and microbiological investigations suggested that activated sludge nitrification, achieved despite the low SRT (2–3 days), was initiated by the backseeding from the nitrification filters and facilitated by the decreased oxygen demand of the influent organics used for denitrification. With the improved activated sludge denitrification, methanol demand could be decreased to about half of the initial value. With the increased efficiency of the activated sludge pre-denitrification, plant effluent COD levels decreased from 40–70 mg l−1 to < 30–45 mg l−1 due to the decreased likelihood of methanol overdosing in the denitrification filter


2021 ◽  
Vol 3 (2) ◽  
pp. 130-140
Author(s):  
Maria Diana Puiu ◽  

The food industry wastewater is known to present a high organic matter content, due to specific raw materials and processing activities. Even if these compounds are not directly toxic to the environment, high concentrations in effluents could represent a source of pollution as discharges of high biological oxygen demand may impact receiving river's ecosystems. Identifying the main organic contaminants in wastewater samples represents the first step in establishing the optimum treatment method. The sample analysis for the non-target compounds through the GC-MS technique highlights, along with other analytical parameters, the efficiency of the main physical and biological treatment steps of the middle-size Wastewater Treatment Plant (WWTP). Long-chain fatty acids and their esters were the main abundant classes of non-target identified compounds. The highest intensity detection signal was reached by n-hexadecanoic acid or palmitic acid, a component of palm oil, after the physical treatment processes with dissolved air flotation, and by 1-octadecanol after biological treatment.


Author(s):  
В.А. Кондрашев ◽  
С.Г. Метелица

Рассмотрены вопросы, связанные с проведением пусконаладочных работ биоблока станции очистки хозяйственно-бытовых и близких к ним по составу сточных вод при пробном пуске в эксплуатацию очистных сооружений. Подробно рассмотрены этапы пусконаладочных работ биоблока очистных сооружений с «затравкой» активным илом из действующих биологических очистных сооружений и с дозировкой легкоокисляемой органики. Описан состав оборудования станции КОС-9 производства «Гермес Групп». Рассмотрены все этапы пусконаладочных работ биоблока на примере запуска очистных сооружений КОС-9 с привлечением многочисленных опытных данных. Определены периоды этапов пусконаладки биоблока. Приведены проблемы наладки биоблока и пути их решения с достижением требуемого результата. Технология, используемая на станции, обеспечивает очистку сточных вод, соответствующую требованиям, предъявляемым к выпуску очищенных стоков в водоем рыбохозяйственного значения. Issues related to commissioning a biological treatment plant at the facilities for household and similar in composition wastewater treatment during the trial start of the treatment facilities are considered. The stages of commissioning a biological treatment plant at the wastewater treatment facilities with «inoculating» activated sludge from the operating biological treatment facilities and with dosing easily oxidable organic matter are considered in detail. The equipment configuration of the WWTP-9 produced by Germes Group is described. All stages of the biological treatment plant commissioning are considered through the example of the start-up of WWTP-9 with the use of numerous experimental data. The periods of biological treatment plant commissioning stages have been determined. The problems of adjusting the biological treatment plant and the ways of their elimination to achieve the required result are presented. The technology used at the WWT facilities provides for the effluent quality that meets the requirements for the discharge into a water body of commercial fishing importance.


2001 ◽  
Vol 44 (1) ◽  
pp. 33-39 ◽  
Author(s):  
O. Tornes

Norway is a leading country on wastewater treatment comprising chemical precipitation processes. This is because Norwegian effluent standards to the North Sea have traditionally focused on phosphorus removal. In most cases, chemical treatment therefore has been considered to give lower investment and operating costs than biological treatment. Norwegian wastewater policy and management is based on the EU guidelines resulting from the EEA (European Economic Area) Agreement. According to the 1991 Urban Wastewater Treatment Directive, this will in most cases require secondary treatment. However, primary treatment can be accepted for plants larger than 10,000 PT with effluents to less sensitive coastal areas, if no negative environmental impacts can be proved. The main objective of the Regional Water, Sewerage and Waste Company (IVAR) is to comply with the prevailing effluent limits at lowest possible cost. During the past four years, IVAR has therefore undertaken comprehensive optimising of the precipitation process including full-scale experiments with different coagulant dosing control systems and different types of coagulants. IVAR also accomplished a feasibility study of introducing biological treatment as an alternative to chemical treatment. Under the prevailing frame conditions of discharge requirements and sludge deposit costs, it is not economically feasible to change to organic coagulants or biological treatment. This conclusion might have to be altered later resulting from the implementation of new EU regulations and increasing sludge deposit costs. This paper presents results from full-scale experiments, extracts from the feasibility study and a comparison of costs. Furthermore, the practical consequences of implementing the EU-guidelines are discussed.


Energies ◽  
2020 ◽  
Vol 13 (15) ◽  
pp. 3769 ◽  
Author(s):  
Radosław Żyłka ◽  
Wojciech Dąbrowski ◽  
Paweł Malinowski ◽  
Beata Karolinczak

The intensification of biological wastewater treatment requires the high usage of electric energy, mainly for aeration processes. Publications on energy consumption have been mostly related to municipal wastewater treatment plants (WWTPs). The aim of the research was to elaborate on models for the estimation of energy consumption during dairy WWTP operation. These models can be used for the optimization of electric energy consumption. The research was conducted in a dairy WWTP, operating with dissolved air flotation (DAF) and an activated sludge system. Energy consumption was measured with the help of three-phase network parameter transducers and a supervisory control and data acquisition (SCADA) system. The obtained models provided accurate predictions of DAF, biological treatment, and the overall WWTP energy consumption using chemical oxygen demand (COD), sewage flow, and air temperature. Using the energy consumption of the biological treatment as an independent variable, as well as air temperature, it is possible to estimate the variability of the total electric energy consumption. During the summer period, an increase in the organic load (expressed as COD) discharged into the biological treatment causes higher electric energy consumption in the whole dairy WWTP. Hence, it is recommended to increase the efficiency of the removal of organic pollutants in the DAF process. An application for the estimation of energy consumption was created.


2018 ◽  
Vol 85 (3) ◽  
pp. 379-383 ◽  
Author(s):  
Peter Leonard ◽  
Emma Tarpey ◽  
William Finnegan ◽  
Xinmin Zhan

This Research Communication describes an investigation into the viability of an Intermittently Aerated Sequencing Batch Reactor (IASBR) for the treatment of dairy processing wastewater at laboratory-scale. A number of operational parameters have been varied and the effect has been monitored in order to determine optimal conditions for maximising removal efficiencies. These operational parameters include Hydraulic Retention Time (HRT), Solids Retention Time (SRT), aeration rate and cycle length. Real dairy processing wastewater and synthetic wastewater have been treated using three laboratory-scale IASBR units in a temperature controlled room. When the operational conditions were established, the units were seeded using sludge from a municipal wastewater treatment plant for the first experiment, and sludge from a dairy processing factory for the second and third experiment. In experiment three, the reactors were fed on real wastewater from the wastewater treatment plant at this dairy processing factory. These laboratory-scale systems will be used to demonstrate over time that the IASBR system is a consistent, viable option for treatment of dairy processing wastewater in this sector. In this study, the capacity of a biological system to remove both nitrogen and phosphorus within one reactor will be demonstrated. The initial operational parameters for a pilot-scale IASBR system will be derived from the results of the study.


1996 ◽  
Vol 33 (7) ◽  
pp. 157-164 ◽  
Author(s):  
Brian Hodgson ◽  
Peter Paspaliaris

Some properties of 3 “new style” wastewater treatment lagoons, 115E, 55E and 25W at the Melbourne Water, Western Treatment Plant (WTP) treating some 250 megalitres (ML) of untreated wastewater each day are described. There is a potential residence time for each of 120 days and each consists of a sequence of up to 11 ponds. Pond 1 has an anaerobic reactor of 90, 150, and 150 ML respectively and Warmens floating aerators are installed on ponds 1 and 2 of 115E and 25W and pond 1 of 55E. BOD5 values of less than 50 are achieved by the end of pond 2 and these together with the installation of the HDPE cover on 115E have effectively reduced odour emissions. Nitrogen is removed by ammonification followed by either nitrification/denitrification, or algal growth which is grazed by zooplankton. Since the introduction of the aerators, chemolithotrophic ammonia oxidising bacteria (CAOB) are more frequently exposed to the inhibitory action of UV light, and therefore nitrification is more sporadic. Turbidity of the water may play a significant role in protecting the CAOB from UV light. The lagoons have the potential to produce an effluent with inorganic-N levels of less than 2 mg/L, a BOD5 of less than 50 mg/L and low levels of algae. The covered anaerobic reactor can in each case produce up to 20,000 cubic metres of gas each day comprising of 80% methane. Methane will be used to generate electricity, and the zooplankton generated by feeding on algae will be harvested to provide food for fish fry.


Sign in / Sign up

Export Citation Format

Share Document