Two important bridges protected from earthquake by extremely big sliding pendulum isolators
<p>The Padma Bridge is a multipurpose road-rail bridge across the Padma River currently under construction in Bangladesh and is one of the most important projects in the whole south east Asia with a total length of 6150 m. The maximum design vertical load reaches 98725 kN.</p><p>The Holtekamp Bridge is a steel road bridge with 2 main spans of 150 m and 2 lateral spans of 75 for a total length of 450 m. The bridge is isolated by use of sliding pendulum isolators having a maximum vertical load capacity at ULS of 54915 kN.</p><p>In both cases the isolators are double sliding surface type but with a different approach about the central articulation. The paper aims to put in evidence the difference in behaviour of the 2 types of pendulum, analysing both the theoretical approach and the test results with a special focus over the adopted solution for perform the test on a device which exceed the capacity of aby existing laboratory.</p>