scholarly journals THE INFLUENCE OF CHANGES IN CONSTRUCTION PRODUCTIVITY: A STATE OF THE ART REVIEW

2021 ◽  
Author(s):  
Felipe Araya ◽  

Multiple studies have found that productivity in Chilean construction has been stagnated during recent decades; thus, creating the need to understand better what factors have led to these results in the construction sector. In the international literature, studies have found that changes are the leading cause of productivity losses in construction projects; however, limited studies have been done in Chile in this regard. This context is understood as an opportunity to learn from the existing literature about the impact of changes in construction productivity, more importantly, such learning can contribute to the discussion of productivity improvement in the Chilean construction sector. This study recommends that more studies are necessary to be done in Chile regarding the impact of changes in construction projects. Namely, future studies should be based on an extensive database of projects so that generalization can be drawn for the construction industry. Additionally, the data collection process of changes in construction should be improved, paying specific attention to the size of changes, the timing of changes, and the scale of assessment—namely activity, project, and industry levels. Ultimately, this study aims to contribute to the discussion about productivity improvement in Chilean construction as this remains one of the main challenges in the industry

2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


2018 ◽  
Vol 8 (3) ◽  
pp. 320-332 ◽  
Author(s):  
Abid Hasan ◽  
Abbas Elmualim ◽  
Raufdeen Rameezdeen ◽  
Bassam Baroudi ◽  
Andrew Marshall

Purpose The issue of low productivity has remained a very stern and chronic problem in construction projects. Previous studies have found poor communication as one of the leading causes of low-construction productivity. Recent advances in the field of information and communication technologies (ICT) have the potential to enhance communication and access to information in construction projects. However, the implications of the use of mobile ICT on construction productivity have not been investigated in sufficient depth, especially from the perspectives of its users, i.e. construction management (CM) professionals. The paper aims to discuss these issues. Design/methodology/approach A focus group session involving ten experienced CM professionals from different organisations of the South Australian construction industry was moderated by a group of four researchers to gather data on mobile ICT usage and its implications for construction productivity. Findings Lack of training and guidelines on effective applications of these technologies to construction projects is a major bottleneck. Results indicate that despite noticeable advances in mobile ICT, differences in usage style and user attitude have limited their overall impact on productivity. Research limitations/implications This paper is based on data gathered from CM professionals working in the South Australian construction industry. Practical implications The study highlights the importance of strategising the use of mobile ICT to achieve the desired productivity rates through policy, training, work-life balance, and deeper and wider understanding of these technologies. Originality/value The study examines the perceptions of CM professionals on the usefulness of mobile ICT in construction projects and its implications for construction productivity.


Author(s):  
Van Tam Nguyen ◽  
Bao Ngoc Nguyen ◽  
Toan Quoc Nguyen ◽  
Hai Tuan Dinh ◽  
Anh Tung Chu

The COVID-19 pandemic has generated a wide range of socio-economic disruption, which causes devastating in numerous aspects. Our knowledge of the true health of the construction industry under the ravage of COVID-19 outbreak is largely based on very limited data. This study aims to assess the impact of pandemic on the construction industry through an investigation in Vietnam. Data were collected through 129 respondents whose online questionnaire survey completed according to their recent direct or indirect participation in delivering construction projects during the spread. The implications of COVID-19 on the construction industry were examined based on simple percentage analysis and Relative Importance Index approaches. Three principal facets of the construction industry were considered: firms' business activities, project performance, and workforce demand. The findings highlighted the multilevel, multidimensional nature of the epidemic consequences on the construction sector. Notably, the revenue and profitability, in a general sense, have decreased during the COVID-19 period, while most of the production and business costs had remained unchanged. Further, the pandemic was argued to impair construction practitioners' incomes and mental health and sabotage projects' schedule and cost.


2019 ◽  
Vol 26 (5) ◽  
pp. 779-793 ◽  
Author(s):  
Richard Glenn Fulford

Purpose The purpose of this paper is to explore how construction projects should be conceived and how the productivity of the construction industry impacts upon a nation’s wealth. Design/methodology/approach The approach has been to marshal the extant literature about the construction industry, construction industry productivity and the economic value of the built environment. Whilst there are many lenses that are used to understand the industry, different ways to measure productivity performance and differing practices between nations, it has been determined that construction industry productivity improvement significantly lags behind other industries. Findings There is a strong argument that construction productivity improvement correlates to advances in a nation’s economy. Nonetheless, it is the decisions about the nature of infrastructure, the standardisation of infrastructure and the effect upon labour productivity that will have the greatest implications for a nation’s economic future. These economic improvements will be inhibited by legacy infrastructure, particularly in densely populated areas. If substantial innovation occurs, the nations currently holding the highest stock of infrastructure might be economically constrained. Research limitations/implications The construction industry is highly fragmented and has the uncertainties of a cyclic industry. It is, therefore, necessary for governments to identify standards and facilitate innovation. The implications for short- and long-term economic performance require that the industry is a fundamental at the highest level of government. Originality/value Scholars can use the propositions to further analyse construction productivity improvement and the provision of different types of infrastructure with regard to a nation’s economic performance. Hypotheses are offered to support future research.


2019 ◽  
Vol 11 (3) ◽  
pp. 926 ◽  
Author(s):  
Gui Ye ◽  
Yuhe Wang ◽  
Yuxin Zhang ◽  
Liming Wang ◽  
Houli Xie ◽  
...  

Total factor productivity (TFP) is of critical importance to the sustainable development of construction industry. This paper presents an analysis on the impact of migrant workers on TFP in Chinese construction sector. Interestingly, Solow Residual Approach is applied to conduct the analysis through comparing two scenarios, namely the scenario without considering migrant workers (Scenario A) and the scenario with including migrant workers (Scenario B). The data are collected from the China Statistical Yearbook on Construction and Chinese Annual Report on Migrant Workers for the period of 2008–2015. The results indicate that migrant workers have a significant impact on TFP, during the surveyed period they improved TFP by 10.42% in total and promoted the annual average TFP growth by 0.96%. Hence, it can be seen that the impact of migrant workers on TFP is very significant, whilst the main reason for such impact is believed to be the improvement of migrant workers’ quality obtained mainly throughout learning by doing.


Buildings ◽  
2021 ◽  
Vol 11 (3) ◽  
pp. 109
Author(s):  
Murat Çevikbaş ◽  
Zeynep Işık

Numerous studies have been conducted by researchers on the delay analysis topic, which is one of the primary areas of scientific study due to the effects of delays on time and cost in construction projects. Following fruitful contributions made by the researchers, it is believed to be extremely important to summarize the existing studies in terms of being a road map for future studies and practitioners. In this context, not only does this study aim to detect the most significant authors, sources, organizations and countries contributing to the improvement of delay domain in the construction industry concerning delay analyses worldwide but also to provide the researchers with extensive insights concerning the prominent research themes, trends and gaps in the literature. Hence, 168 documents related to delay analyses from 1982 to 11 February 2021 were detected through the Scopus Database and the Web of Science Database, and scientometric analyses were conducted via VOSviewer software. By evaluating the related research, two main research areas were detected in this field, namely; improving the delay analysis methods and resolving the disputes before they occur. This study is believed to make theoretical and practical contributions in that it examines the delay analysis topic in all aspects such as prominent institutions, countries, authors and sources, synthesizes the data and highlights possible research domains, gaps and trends concerning the delay analysis topic in construction industry.


2018 ◽  
Vol 8 (3) ◽  
pp. 253-266 ◽  
Author(s):  
Tillmann Böhme ◽  
Alberto Escribano ◽  
Emma Elizabeth Heffernan ◽  
Scott Beazley

Purpose The construction industry is a significant driver of economic activity in many countries. However, there has been a lack of growth in productivity within the Australian construction sector over recent years. The purpose of this paper is to gain an in-depth understanding of the causes for declining productivity within the Australian mid-rise residential construction network. Design/methodology/approach Two in-depth case studies have been conducted with a builder and developer, both significant entities of the Australian mid-rise residential construction network. Case study data collection comprised a five-stage process including semi-structured interviews and archival information review. Findings Drivers for declining construction productivity were identified under the categories of: industry-, firm- and project-level productivity. The drivers include: incomplete documentation, design changes, inefficient project management, supply chain fragmentation, among others. Originality/value The contribution of this study is the identification and categorisation of major issues impacting sector productivity along the mid-rise residential construction supply chain. The research identified that the substructure and superstructure are the construction phases during which most productivity losses occur. Mitigations are discussed in terms of systemic sector productivity increases at an industry, firm and project levels.


2021 ◽  
Vol 14 (2) ◽  
pp. 62-70
Author(s):  
Huda Yaseen ◽  
Hafeth I. Naji

Construction projects are of a special nature affected by many factors, which makes them exposed to multiple risks that may lead to the abandonment of projects. Recently, the Iraqi construction sector is facing a number of problems. Abandoned construction projects are one of the most common and dangerous problems in the construction industry in Iraq, with their negative effects on stakeholders, the economy, and the environment due to the lack of sufficient financial and administrative capabilities to complete construction projects, which is reflected in exceeding the time limit for the completion of projects. The aim of this research is to use the analytic network process (ANP) technique to choose the best form of Public-Private Partnership (PPP) contracts to fund abandoned projects in Iraq. using a questionnaire survey to determine the most criteria and alternatives for selecting appropriate financing for the abandoned project. The results shown final weight of the Build-Own-Operate (BOO) contract from ANP is 0.533, which is the best form of PPP contract among the alternatives proposed to fund the project.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.


2010 ◽  
Vol 18 (1) ◽  
pp. 17-23
Author(s):  
E. Jankovichová

The global economy and its influence on the Slovak construction sectorFor the construction industry, globalization is a trend that means two things: many opportunities and many threats. In the conditions of globalization many management approaches, such as organization structure, strategy forming, planning, motivation and control procedures, communication channels, risk management, etc., must transform. The aim of the paper is to analyze the influence of globalization on the construction industry in Slovakia and identify the impact of globalization on construction companies in this area.


Sign in / Sign up

Export Citation Format

Share Document