Stakeholder Analysis in the Feasibility Process of Projects: A Structural Evaluation of the Power-Oriented Relationship
Keyword(s):
The feasibility process of public construction projects is under the influence of stakeholders, who give direction to public resource allocation. Therefore, the analysis of stakeholders in this process is critical. An inductive qualitative approach was adopted using the grounded theory method to provide a theoretical explanation of stakeholders’ behaviors. Under the insight of structuration theory, the results indicated that the challenges are derived from various interrelated factors, leading to the emergence of improper participation as a macro-structural phenomenon with multilateral interaction with a power-oriented relationship as a micro behavior in the feasibility process at the agency level.
2022 ◽
Vol 04
(01)
◽
pp. 116-135
THE EFFECT OF CURRENT PUBLIC PROCUREMENT LAW ON DURATION AND COST OF CONSTRUCTION PROJECTS IN TURKEY
2013 ◽
Vol 19
(1)
◽
pp. 121-135
◽
2014 ◽
Vol 48
(3)
◽
pp. 484-491
◽
2018 ◽
Vol 25
(6)
◽
pp. 690-706
◽