Abstract This technical paper provides the result of utilizing MPD technology for drilling and cementing a 127 mm production liner withing the Zadonian horizon D3zd in an exploratory well of the Prohorovskoe field. The previous wells drilled with a conventional approach in the field had complicated issues such as circulation losses and well control. It was complexified with high hydrogen disulfide concentration in reservoir oil which was a health hazard to a site personnel. As a result, to eliminate all complications, resources and operational time were needed. To prevent and eliminate complications in a long wall, core drilling and well completion, managed pressure drilling (MPD) and cementing technology with semi-automatic control system was applied. The project is unique as such complicated jobs with the core drilling and cementing with MPD were executed for the first time in The Komi Republic. MPD approach allowed to figure out bottomhole safe conditions and maintain ECD within a required pressure window. It is necessary to notice that a part of the section was core drilled. Knowing the window between pore and fracture pressures safety limits, a run-in-the-hole design with further cementing job was optimized. The execution was done flawlessly without circulation losses and well control issues. In comparison to a previous well in the Prohorovskoe field, MPD allowed to shorten loss circulated mud volume from 2 2215 m3 to 0 m3 and avoid non-productive time. Through accomplished goals and lessons learned, new grounds to well owners and well services in a field development stage are broken.

2021 ◽  
Author(s):  
Sunanda Magna Bela ◽  
Abdil Adzeem B Ahmad Mahdzan ◽  
Noor Hidayah A Rashid ◽  
Zairi A Kadir ◽  
Azfar Israa Abu Bakar ◽  
...  

Abstract Gravel packing in a multilayer reservoir during an infill development project requires treating each zone individually, one after the other, based on reservoir characterization. This paper discusses the installation of an enhanced 7-in. multizone system to achieve both technical and operational efficiency, and the lessons learned that enabled placement of an optimized high-rate water pack (HRWP) in the two lower zones and an extension pack in the uppermost zone. This new approach helps make multizone cased-hole gravel-pack (CHGP) completions a more technically viable and cost-effective solution. Conventional CHGPs are limited to either stack-pack completions, which can incur high cost because of the considerable rig time required for multizone operations, or alternate-path single-trip multizone completions that treat all the target zones simultaneously, with one pumping operation. However, this method does not allow for individual treatment to suit reservoir characterization. The enhanced 7-in. multizone system can significantly reduce well completion costs and pinpoint the gravel placement technique for each zone, without pump-rate limitations caused by excessive friction in the long interval system, and without any fiuid-loss issues after installation because of the modular sliding side-door (SSD) screen design feature. A sump packer run on wireline acts as a bottom isolation packer and as a depth reference for subsequent tubing-conveyed perforating (TCP) and wellbore cleanup (WBCU) operations. All three zones were covered by 12-gauge wire-wrapped modular screens furnished with blank pipe, packer extension, and straddled by two multizone isolation packers between the zones, with a retrievable sealbore gravel-pack packer at the top. The entire assembly was run in a single trip, therefore rig time optimization was achieved. The two lower zones were treated with HRWPs, while the top zone was treated with an extension pack. During circulation testing on the lowermost zone, high pumping pressure was recorded, and after thorough observation of both pumping parameters and tool configuration, it was determined that the reduced inner diameter (ID) in the shifter might have been a causal factor, thereby restricting the flow area. This was later addressed with the implementation of a perforated pup joint placed above the MKP shifting tool. The well was completed within the planned budget and time and successfully put on sand-free production, exceeding the field development planning (FDP) target. The enhanced 7-in. multizone system enabled the project team to beat the previous worldwide track record, which was an HRWP treatment only. As a result of proper fluid selection and rigorous laboratory testing, linear gel was used to transport 3 ppa of slurry at 10 bbl/min, resulting in a world-first extension pack with a 317-lbm/ft packing factor.


2021 ◽  
Author(s):  
Bao Ta Quoc ◽  
Harpreet Kaur Dalgit Singh ◽  
Tuan Nguyen Le Quang ◽  
Dien Nguyen Van ◽  
Essam Sammat

Abstract A managed pressure drilling (MPD) and early influx detection system is gaining worldwide acceptance as an enabling technology for drilling wells with challenges that can lead to tremendous nonproductive time (NPT), significant unplanned costs, and increased risk exposure. MPD counteracts the high cost of these wells by delivering significant savings when eliminating fluid losses or well control events that cause NPT. MPD technology has proven that is used to not only reduce NPT but also enable access to reserves previously considered un-drillable. In this case history, MPD helped to reach reserves that could not be reached in the first well. Client planned to drill the well A, which is its second offshore exploration well. Early on in 2019, the campaign encountered significant problems because of high temperatures and a narrow pore-pressure/fracture-pressure (PP/FP) gradient window. Additionally, using conventional drilling methods in offset wells led to problems relating to kicks, loss scenarios, and stuck pipe. Before drilling the second exploration well, the relevant parties considered that the first well-presented multiple drilling issues, and they drew from past success. The latter job had ended with reaching all the well targets despite high-pressure/high-temperature (HP/HT) conditions using a continuous circulating device in conjunction with an MPD system. Therefore, this combination of technologies was chosen to drill the well A. The operator used the MPD system, from the start when drilling the 14 3/4-in × 16-in. hole section to the end when drilling the 8 1/2-in. hole section, in offshore Vietnam. Applying MPD technology on this well resulted in many benefits, including the main benefit of always controlling the bottomhole pressure through the challenging zones. MPD also helped to maintain the equivalent circulating destiny (ECD) and equivalent static density (ESD) during drilling, connections, and a logging operation to mitigate the risk of any gas breaking out at the surface and to drill the well to the desired target depth. This paper focuses on using MPD technology in conjunction with the continuous circulation system, in offshore Vietnam. It goes into detail by describing the experience and providing some of the lessons learned.


2019 ◽  
Vol 59 (2) ◽  
pp. 856
Author(s):  
Peter G. Boothby ◽  
Ratih Puspitasari ◽  
Sanjay Thakur ◽  
Zachariah John Pallikathekathil ◽  
Chris Walton

Understanding the influence of geomechanics early in the field development phase facilitates reservoir management planning. To capture complex geology and associated field development, a 3D mechanical earth model (3D MEM) with finite element method (FEM) approach was selected to analyse the geomechanical-related risks associated with two fields in the North West Shelf, Australia. The 3D MEMs were constructed using geological static models, and seismic-derived horizons and faults. The 3D properties were propagated based on core-calibrated 1D properties and controlled by stratigraphy, 3D facies and seismic inversion volumes. The FEM was used to calculate the equilibrium of stresses and strains within the 3D MEMs. The 3D properties and pre-production stresses were validated in blind test wells before forward modelling. The 3D MEMs were linked to the dynamic reservoir models to capture the pressure evolution throughout the field lifecycle. The results were used to analyse the risks associated with compaction, subsidence, fault instability, completion integrity and drilling stability of infill wells through depleted reservoirs. The results provided insight in managing the risk early in field development stage. The study’s largest challenge was integrating a large volume of data to ensure that the structural complexity and rock heterogeneity were captured and consistent with the geological understanding of the field. A multi-disciplinary team of earth scientists and reservoir and geomechanics engineers worked together, and the value of data integration, good communication and teamwork were key success factors. Lessons learned and best practices were captured throughout the study and provided valuable feedback for future works.


2019 ◽  
Vol 11 (19) ◽  
pp. 5283 ◽  
Author(s):  
Gowida ◽  
Moussa ◽  
Elkatatny ◽  
Ali

Rock mechanical properties play a key role in the optimization process of engineering practices in the oil and gas industry so that better field development decisions can be made. Estimation of these properties is central in well placement, drilling programs, and well completion design. The elastic behavior of rocks can be studied by determining two main parameters: Young’s modulus and Poisson’s ratio. Accurate determination of the Poisson’s ratio helps to estimate the in-situ horizontal stresses and in turn, avoid many critical problems which interrupt drilling operations, such as pipe sticking and wellbore instability issues. Accurate Poisson’s ratio values can be experimentally determined using retrieved core samples under simulated in-situ downhole conditions. However, this technique is time-consuming and economically ineffective, requiring the development of a more effective technique. This study has developed a new generalized model to estimate static Poisson’s ratio values of sandstone rocks using a supervised artificial neural network (ANN). The developed ANN model uses well log data such as bulk density and sonic log as the input parameters to target static Poisson’s ratio values as outputs. Subsequently, the developed ANN model was transformed into a more practical and easier to use white-box mode using an ANN-based empirical equation. Core data (692 data points) and their corresponding petrophysical data were used to train and test the ANN model. The self-adaptive differential evolution (SADE) algorithm was used to fine-tune the parameters of the ANN model to obtain the most accurate results in terms of the highest correlation coefficient (R) and the lowest mean absolute percentage error (MAPE). The results obtained from the optimized ANN model show an excellent agreement with the laboratory measured static Poisson’s ratio, confirming the high accuracy of the developed model. A comparison of the developed ANN-based empirical correlation with the previously developed approaches demonstrates the superiority of the developed correlation in predicting static Poisson’s ratio values with the highest R and the lowest MAPE. The developed correlation performs in a manner far superior to other approaches when validated against unseen field data. The developed ANN-based mathematical model can be used as a robust tool to estimate static Poisson’s ratio without the need to run the ANN model.


2021 ◽  
Author(s):  
Vinicius Gasparetto ◽  
Thierry Hernalsteens ◽  
Joao Francisco Fleck Heck Britto ◽  
Joab Flavio Araujo Leao ◽  
Thiago Duarte Fonseca Dos Santos ◽  
...  

Abstract Buzios is a super-giant ultra-deep-water pre-salt oil and gas field located in the Santos Basin off Brazil's Southeastern coast. There are four production systems already installed in the field. Designed to use flexible pipes to tie back the production and injection wells to the FPSOs (Floating Production Storage and Offloading), these systems have taken advantage from several lessons learned in the previous projects installed by Petrobras in Santos Basin pre-salt areas since 2010. This knowledge, combined with advances in flexible pipe technology, use of long-term contracts and early engagement with suppliers, made it possible to optimize the field development, minimizing the risks and reducing the capital expenditure (CAPEX) initially planned. This paper presents the first four Buzios subsea system developments, highlighting some of the technological achievements applied in the field, as the first wide application of 8" Internal Diameter (ID) flexible production pipes for ultra-deep water, leading to faster ramp-ups and higher production flowrates. It describes how the supply chain strategy provided flexibility to cover the remaining project uncertainties, and reports the optimizations carried out in flexible riser systems and subsea layouts. The flexible risers, usually installed in lazy wave configurations at such water depths, were optimized reducing the total buoyancy necessary. For water injection and service lines, the buoyancy modules were completely removed, and thus the lines were installed in a free-hanging configuration. Riser configuration optimizations promoted a drop of around 25% on total riser CAPEX and allowed the riser anchor position to be placed closer to the floating production unit, promoting opportunities for reducing the subsea tieback lengths. Standardization of pipe specifications and the riser configurations allowed the projects to exchange the lines, increasing flexibility and avoiding riser interference in a scenario with multiple suppliers. Furthermore, Buzios was the first ultra-deep-water project to install a flexible line, riser, and flowline, with fully Controlled Annulus Solution (CAS). This system, developed by TechnipFMC, allows pipe integrity management from the topside, which reduces subsea inspections. As an outcome of the technological improvements and the optimizations applied to the Buzios subsea system, a vast reduction in subsea CAPEX it was achieved, with a swift production ramp-up.


2021 ◽  
Author(s):  
Mahendra R Kunju ◽  
Mauricio A Almeida

Abstract As the use of adaptive drilling process like Managed Pressure Drilling (MPD) facilitates drilling of otherwise non-drillable wells with faster corrective action, the drilling industry should review some of the misconceptions to produce more efficient well control methods. This paper discusses results from full-scale experiments recently conducted in an extensively instrumented test well at Louisiana State University (LSU) and demonstrate that common expectations regarding the potential for high/damaging internal riser pressures resulting from upward transport or aggregation of riser gas are unfounded, particularly when compressibility of riser and its contents are considered. This research also demonstrates the minimal fluid bleed volumes required to reduce pressure build-up consequences of free gas migration in a fully closed riser.


2021 ◽  
Author(s):  
Rahul Kamble ◽  
Youssef Ali Kassem ◽  
Kshudiram Indulkar ◽  
Kieran Price ◽  
Majid Mohammed A. ◽  
...  

Abstract Coring during the development phase of an oil and gas field is very costly; however, the subsurface insights are indispensable for a Field Development Team to study reservoir characterization and well placement strategy in Carbonate formations (Dolomite and limestone with Anhydrite layers). The objective of this case study is to capture the successful coring operation in high angle ERD wells, drilled from the fixed well location on a well pad of an artificial island located offshore in the United Arab Emirates. The well was planned and drilled at the midpoint of the development drilling campaign, which presented a major challenge of wellbore collision risk whilst coring in an already congested area. The final agreed pilot hole profile was designed to pass through two adjacent oil producer wells separated by a geological barrier, however, the actual separation ratio was < 1.6 (acceptable SF to drill the well safely), which could have compromised the planned core interval against the Field Development Team's requirement. To mitigate the collision risks with offset wells during the coring operation, a low flow rate MWD tool was incorporated in the coring BHA to monitor the well path while cutting the core. After taking surveys, IFR and MSA corrections were applied to MWD surveys, which demonstrated an acceptable increase in well separation factor as per company Anti-Collision Risk Policy to continue coring operations without shutting down adjacent wells. A total of 3 runs incorporating the MWD tool in the coring BHA were performed out of a total of 16 runs. The maximum inclination through the coring interval was 73° with medium well departure criteria. The main objective of the pilot hole was data gathering, which included a full suite of open hole logging, seismic and core cut across the target reservoir. A total of 1295 ft of core was recovered in a high angle well across the carbonate formation's different layers, with an average of 99% recovery in each run. These carbonate formations contain between 2-4% H2S and exhibit some fractured layers of rock. To limit and validate the high cost of coring operations in addition to core quality in the development phase, it was necessary to avoid early core jamming in the dolomite, limestone and anhydrite layers, based on previous coring runs in the field. Core jamming leads to early termination of the coring run and results in the loss of a valuable source of information from the cut core column in the barrel. Furthermore, it would have a major impact on coring KPIs, consequently compromising coring and well objectives. Premature core jamming and less-than-planned core recovery from previous cored wells challenged and a motivated the team to review complete field data and lessons learned from cored offset wells. Several coring systems were evaluated and finally, one coring system was accepted based on core quality as being the primary KPI. These lessons learned were used for optimizing certain coring tools technical improvements and procedures, such as core barrel, core head, core handling and surface core processing in addition to the design of drilling fluids and well path. The selection of a 4" core barrel and the improved core head design with optimized blade profile and hold on sharp polished cutters with optimized hydraulic efficiency, in addition to the close monitoring of coring parameters, played a significant role in improving core cutting in fractured carbonate formation layers. This optimization helped the team to successfully complete the 1st high angle coring operation offshore in the United Arab Emirates. This case study shares the value of offset wells data for coring jobs to reduce the risk of core jamming, optimize core recovery and reduce wellbore collision risks. It also details BHA design decisions(4"core barrel, core head, low flow rate MWD tool and appropriate coring parameters), all of which led to a new record of cutting 1295 ft core in a carbonate formation with almost 100% recovery on surface.


2021 ◽  
Vol 3 (8) ◽  
pp. 70-72
Author(s):  
Jianbo Hu ◽  
◽  
Yifeng Di ◽  
Qisheng Tang ◽  
Ren Wen ◽  
...  

In recent years, China has made certain achievements in shallow sea petroleum geological exploration and development, but the exploration of deep water areas is still in the initial stage, and the water depth in the South China Sea is generally 500 to 2000 meters, which is a deep water operation area. Although China has made some progress in the field of deep-water development of petroleum technology research, but compared with the international advanced countries in marine science and technology, there is a large gap, in the international competition is at a disadvantage, marine research technology and equipment is relatively backward, deep-sea resources exploration and development capacity is insufficient, high-end technology to foreign dependence. In order to better develop China's deep-sea oil and gas resources, it is necessary to strengthen the development of drilling and completion technology in the oil industry drilling engineering. This paper briefly describes the research overview, technical difficulties, design principles and main contents of the completion technology in deepwater drilling and completion engineering. It is expected to have some significance for the development of deepwater oil and gas fields in China.


2021 ◽  
Author(s):  
Babar Kamal ◽  
Emil Stoian ◽  
Graeme MacFarlane

Abstract This paper reviews the recently concluded successful application of a Managed Pressure Drilling (MPD) system on a High-Pressure High-Temperature (HPHT) well with Narrow Mud Weight Window (NMWW) in the UK sector in the Central North Sea. Well-A was drilled with the Constant Bottom Hole Pressure (CBHP) version of MPD with a mud weight statically underbalanced and dynamically close to formation pore pressure. Whilst drilling the 12-1/2" section of the well with statically under-balanced mud weight, to minimize the overbalance across the open hole, an influx was detected by the MPD system as a result of drilling into a pressure ramp. The MPD system allowed surface back pressure to be applied and the primary barrier of the well re-established, resulting in a minimal influx volume of 0.06 m3 and the ability to circulate the influx out by keeping the Stand Pipe Pressure (SPP) constant while adjusting Surface Back Pressure (SBP) through the MPD chokes in less than 4 hours with a single circulation. After reaching the 12-1/2" section TD, only ~0.025sg (175 psi) Equivalent Mud Weight (EMW) window was available to displace the well and pull out of hole (POOH) the bottom hole assembly (BHA) therefore, 3 × LCM pills of different concentrations were pumped and squeezed into the formation with SBP to enhance the NMWW to 0.035sg EMW (245 psi) deemed necessary to kill the well and retrieve BHA. MPD allowed efficient cement squeeze operations to be performed in order to cement the fractured/weak zones which sufficiently strengthened the well bore to continue drilling. A series of Dynamic Pore Pressure and Formation Integrity Tests (DPPT and DFIT) were performed to evaluate the formation strength post remedial work and to define the updated MMW. Despite the challenges, the MPD system enabled the delivery of a conventionally un-drillable well to target depth (TD) without any unplanned increase/decrease in mud weight or any costly contingency architecture operations, whilst decreasing the amount of NPT (Non Productive Time) and ILT (Invisible Lost Time) incurred. This paper discusses the planning, design, and execution of MPD operations on the Infill Well-A, the results achieved, and lessons learned that recommend using the technology both as an enabler and performance enhancer.


2021 ◽  
Author(s):  
Abdullah Abu-Eida ◽  
Salem Al-Sabea ◽  
Milan Patra ◽  
Bader Akbar ◽  
Kutbuddin Bhatia ◽  
...  

Abstract The Minagish field in West Kuwait is a high potential field which poses several challenges in terms of hydrocarbon flow assurance through highly depleted tight carbonate intervals with uneven reservoir quality and curtailed mobility. These conditions have shifted the field development from vertical to horizontal wellbore completions. Achieving complete wellbore coverage is a challenge for any frac treatment performed in a long openhole lateral with disparities in reservoir characteristics. The fluid will flow into the path of least resistance leaving large portions of the formation untreated. As a result, economic fracturing treatment options dwindle significantly, thus reservoir stimulation results are not always optimum. A multistage fracturing technique using Integrated Dynamic Diversion (IDD) has been performed first time in West Kuwait field well. The process uses active fluid energy to divert flow into a specific fracture point in the lateral, which can initiate and precisely place a fracture. The process uses two self-directed fluid streams: one inside the pipe and one in the annulus. The process mixes the two fluids downhole with high energy to form a consistent controllable mixture. The technique includes pinpoint fluid jetting at the point of interest, followed by in-situ HCL based crosslinked systems employed for improving individual stage targets. The IDD diversion shifts the fracture to unstimulated areas to create complex fractures which increases reservoir contact volume and improved overall conductivity in the lateral. The kinetic and chemical diversion of the IDD methodology is highly critical to control fluid loss in depleted intervals and results in enhanced stimulation. Pumping a frac treatment in openhole without control would tend to initiate a longitudinal fracture along the wellbore and may restrict productivity. By using specialized completion tools with nozzles at the end of the treating string, a new pinpoint process has been employed to initiate a transverse fracture plane in IDD applications. Proper candidate selection and fluid combination with in-situ crosslink acid effectively plug the fracture generated previously and generate pressure high enough to initiate another fracture for further ramification. By combining these processes into one continuous operation, the use of wireline/coiled tubing for jetting, plug setting and milling is eliminated, making the new multistage completion technology economical for these depleted wells. The application of the IDD methodology is a fit-for-purpose solution to address the unique challenges of openhole operations, formation technical difficulties, high-stakes economics, and untapped high potential from intermittent reservoirs. The paper will present post-operation results of this completion from all fractured zones along the lateral and will describe the lessons learned in implementation of this methodology which can be considered as best practice for application in similar challenges in other fields.