scholarly journals Impact of Super Heavy Load Vehicles on Transportation Infrastructure: Economic Aspects

Author(s):  
Thach Nguyen ◽  
Ali Morovatdar ◽  
Reza Ashtiani ◽  
Olga Kosheleva

Abstract Sometimes, there is a need to transport very heavy equipment, so heavy that the resulting load is several times larger than the maximal load that the corresponding road segment was designed to withstand. Such super heavy load vehicles decrease the remaining service life of the road segment, and sometimes even make the segment unusable and needing repairs. In both cases, the need for earlier-than-expected repairs means additional costs. It is therefore desirable to estimate the expected value of this additional cost. In locations where the owner of the super heavy load vehicle pays for the vehicle passage, this is necessary to decide how much to charge the owner. In other locations, where the agreement is that the cost of additional repairs comes from the additional taxes that the vehicle owners pay, such an estimate is needed to the road owners -- e.g., to the county or to the state -- so as to select the route for which the expected additional cost of repairs is the smallest.

The results revealed that on an overall average size of landholding was estimated to be 0.97 ha. The total cultivated area at all categories of sample farms were found to be irrigated. Overall average, cost of cultivation was estimated `27819.43 per ha. The cost of cultivation showed positive relation with size of holding. The cost of cultivation was highest on medium farms (`32549.25) followed by small (`31528.40 and marginal (`29171.74), respectively. Overall average, cost of production was estimated `2446.44 per hectare. On an average input-output ratio on the basis Costs A1/A2, B1, B2, C1, and C2 were recorded 1:2.86, 1:2.77, 1:1.91, 1:1.89 and 1:1.46, respectively. On the basis of Cost C2 input-output ratio was highest on marginal farms (1:1.47) followed by small (1:1.44) and medium (1:1.43), respectively. Overall average, net income and gross income were found `9859.33 and 40028.69 per ha, respectively.


2021 ◽  
Author(s):  
Nguyen Ngoc Thach ◽  
Ali Morovatdar ◽  
Reza S. Ashtiani ◽  
Olga Kosheleva

2000 ◽  
Vol 1712 (1) ◽  
pp. 196-201 ◽  
Author(s):  
Jin-Fang Shr ◽  
Benjamin P. Thompson ◽  
Jeffrey S. Russell ◽  
Bin Ran ◽  
H. Ping Tserng

An increasing number of state highway agencies (SHAs) are using A (cost) + B (time cost) bidding ( A + B bidding) for highway construction. The A + B bidding concept is designed to shorten the total contract time by allowing each contractor to bid the number of days in which the work can be accomplished, in addition to the traditional cost bid. The SHA is then presented with the problem of determining a reasonable range of contract time submitted by the bidders. Most SHAs do not currently restrict the range of B. However, several problems may arise from an unrestricted range of B. First, if no minimum is set for B, a bidder may inflate the cost bid and submit an unreasonably low B, using the excess cost bid to cover the disincentives charged for exceeding the time bid. Second, if no maximum is set for B, then a bidder with a high B and a low-cost bid may be awarded the job and make an unreasonable amount of money from incentive payments. This study develops a quantified model of the price-time bidding contract. A construction cost-versus-time curve is developed from Florida Department of Transportation (DOT) data. The contractor’s price-versus-time curve is then combined with the road-user cost to determine the optimum lower limit to be set on B. Finally, several projects completed by the Florida DOT will be used to illustrate this model.


2021 ◽  
Vol 2021 (23) ◽  
pp. 20-30
Author(s):  
Taras Pechonchyk ◽  
◽  
Vitaliy Ivanchenko ◽  

AbstractIntroduction. Effective management of road indstry is particularly important in conditions of limited funding, as it is not possible to provide adequate funding of the economic entity that has the functions of a customer service. The cost of the customer service maintenance depends directly on the compliance with applicable regulations for these works cost determination. One of the aspects that form a considerable part of the costs of customer service is the maintenance of service vehicles.Problem Statement. Road services in the regions (hereinafter RSR) are the recipients and managers of the funds from the State Budget of Ukraine that are directed for the development and maintenance of public roads of state importance, being as well the asset holders of these roads. To perform their functions, the RSR have vehicles on their balance, the use of which involves a number of costs, including fuel and lubricants, repair, maintenance, replacement of tires, etc. The most important of the steps involved in setting the costs of vehicle maintenance is the process of cost planning. Planning has to be based on the structure of the vehicle fleet (own or leased), functional responsibilities and scope of road works.Planning is carried out for vehicles on the balance of the RSR, as well as for leased vehicles. In the case of leasing, the costs mentioned above are added by the vehicles leasing costs. These costs must be forecasted, justified and performed within the approved cost estimates of the customer service expenses.Purpose. The purpose of the article is to highlight the theoretical and methodological approaches to the calculation of planned costs for the maintenance of service vehicles of the road works customer.Materials and methods. Dialectical methods of knowledge, such as analysis and synthesis of fleet composition characteristics and approaches to cost planning methods, as well as induction, were used in writing the article to explore some aspects of the process of calculating the planned cost of maintenance of the road works customer's service vehicles.Results. The study highlights and describes the main approaches to the calculation of planned costs for the maintenance of service vehicles of the road works customer. The methodology of calculation of planned costs for the maintenance of service vehicles is explored.Conclusions. The introduction of a clear methodology and analytical toolkit for calculating all necessary expenditure items for the maintenance of the road works customer's vehicles in the cost planning process will establish the implementation of a clear mechanism for calculating the planned costs of maintenance of the road works customer's vehicles. It will also provide an automated information-analytical complex for planning of cost estimates, with information entry and reporting in standard forms and possibility of prompt response to changes in fleet composition, needs for spare parts, repairs or other expenses for the maintenance of service vehicles and making changes in cost estimates.Keywords: motor vehicles, costs, cost planning, customer service, maintenance of service vehicles


2021 ◽  
Vol 2021 (23) ◽  
pp. 31-42
Author(s):  
Anatolii Tsynka ◽  
◽  
Andrii Hrinchuk ◽  
Ivan Rakovych ◽  
◽  
...  

Introduction. In the modern conditions of the pricing system in the construction of Ukraine, the key value have the estimated norms, which are presented in separate collections, the main purpose of which is to determine the standard quantity of resources required to perform a particular type of work as a basis for the transition to the cost indicators. In order to determine the cost of road work objectively and accurately, it is essential that the indicators of estimated norms meet the requirements of regulatory documents and modern methods of execution of road works.Problematics. In connection with the active improvement of the regulatory base of the road construction industry, permanent upgrade of road organizations technique fleet, the introduction of new technologies and materials in construction and operation of roads, improving the methods of work there is a discrepancy between the existing resource element of estimated norms and the actual conditions of work in terms of built-up labor costs, the operation time of machines and mechanisms and the range of materials. Accordingly, it affects the reliability and accuracy of determining the cost of road works.Purpose. Improvement and harmonization with actual working conditions and requirements of regulatory documents of industry regulatory and estimate base of resource elementary estimated norms for work performed during construction, reconstruction, repair and operational maintenance of roads and bridges to ensure reliable and valid technical, economic and estimated calculations.Materials and methods. During work performance the analysis of the regulatory documentation, establishing the requirements to the technology of road works and materials has been carried out. A number of chronometric observations with the measurement of time of road works in full-scale conditions was carried out. The obtained data were summarized, averaged and on their basis the indicators of the resource element of the estimated norms were estimated.Results. A review of the main amendments and additions, which came into force after the approval of Amendment No 2 SOU 42.1-37641918-035:2018 [1] and Amendment No 2 SOU 42.1-37641918-071:2018 [2], which were developed to improve the regulatory-estimate base for the calculation of road works, taking into account the requirements and provisions of existing regulatory documents taking into account the current state of scientific and technological progress in the road sector.Conclusions. The above analysis of the amendments that came into force with the approval of [1]. and [2] will systematize the innovations provided by the requirements of current regulatory documents on the calculation of the cost of road works and the development of relevant documents at all stages of the investment process, planning and organization of road works, as well as the writing-off of material resources. Review and systematization of recent improvements in the estimated regulatory documents for road works will provide an opportunity to optimally plan the use of available material, labor and financial resources, often limited.Keywords: public road, operational maintenance, investment documentation, overhaul and current repairs, machine, mechanism, regulatory document, resource element estimate norm, Standard of Organization of Ukraine.


BMJ Open ◽  
2018 ◽  
Vol 8 (2) ◽  
pp. e018729 ◽  
Author(s):  
Francesca Solmi ◽  
Mariya Melnychuk ◽  
Stephen Morris

ObjectiveIn the UK, families of disabled children are entitled to receive disability benefits to help meet costs associated with caring for their child. Evidence of actual costs incurred is scant, especially for mental health disability. In this study, we aimed to quantify the cost of mental and physical health disability in childhood and adolescence to families in the UK using the concept of compensating variation (CV).DesignRepeated cross-sectional survey.SettingThe UK general populationParticipants85 212 children drawn from 8 waves of the Family Resources Survey.OutcomesUsing propensity score matching we matched families with a disabled child to similar families without a disabled child and calculated the extra income the former require to achieve the same living standards as the latter, that is, their CV. We calculated the additional costs specifically associated with several definitions of mental health and physical health disability.ResultsFamilies of a child with any mental health disability, regardless of the presence of physical health comorbidity, needed an additional £49.31 (95% CI: 21.95 to 76.67) and, for more severe disabilities, an additional £57.56 (95% CI: 17.69 to 97.44) per week to achieve the same living standards of families without a disabled child. This difference was greater for more deprived families, who needed between £59.28 (95% CI: 41.38 to 77.18) and £81.26 (95% CI: 53.35 to 109.38) more per week depending on the extent of mental health disability. Families of children with physical health disabilities, with or without mental health disabilities, required an additional £35.86 (95% CI: 13.77 to 57.96) per week, with economically deprived families requiring an extra £42.18 (95% CI: 26.38 to 57.97) per week.ConclusionsMental and physical health disabilities among children and adolescents were associated with high additional costs for the family, especially for those from deprived economic backgrounds. Means testing could help achieve a more equitable redistribution of disability benefit.


Author(s):  
Benito Mignacca ◽  
Giorgio Locatelli ◽  
Mahmoud Alaassar ◽  
Diletta Colette Invernizzi

The key characteristics of small modular reactors (SMRs), as their name emphasized, are their size and modularity. Since SMRs are a family of novel reactor designs, there is a gap of empirical knowledge about the cost/benefit analysis of modularization. Conversely, in other sectors (e.g. Oil & Gas) the empirical experience on modularization is much greater. This paper provides a structured knowledge transfer from the general literature (i.e. other major infrastructure) and the Oil & Gas sector to the nuclear power plant construction world. Indeed, in the project management literature, a number of references discuss the costs and benefits determined by the transition from the stick-built construction to modularization, and the main benefits presented in the literature are the reduction of the construction cost and the schedule compression. Additional costs might arise from an increased management hurdle and higher transportation expenses. The paper firstly provides a structured literature review of the benefits and costs of modularization divided into qualitative and quantitative references. In the second part, the paper presents the results of series of interviews with Oil & Gas project managers about the value of modularization in this sector.


Author(s):  
A. Krasheninin

Modern vehicles operated on the railways of Ukraine have almost exhausted or exceeded their resource. The overuse of financial and material resources for their maintenance continues. The standard service life of vehicles was calculated on stable economic conditions of use of vehicles and their timely updating in process of aging. The service life of modern vehicles is determined by the influence of many factors, the disregard of which can lead to significant costs, even in compliance with the standard service life. For railway transport, these factors need modern clarification, as in operation their service life often exceeds the standard or, as for intermodal transport, the service life does not have a strict justification. Accordingly, the article analyzes the issues of assessing the impact on the service life of vehicles of the components of the cost of its maintenance and average daily mileage. It is shown that, firstly, the definition of the service life of vehicles must be linked to the cost of vehicle development, its creation, testing and production, the cost of operation and storage, as well as additional costs, and secondly , with the optimal average daily mileage, at which all the costs are minimal.


2020 ◽  
Author(s):  
Godwin D Giebel

BACKGROUND With an estimated prevalence of around 3% and an about 2.5-fold increased risk of stroke, atrial fibrillation (AF) is a serious threat for patients and a high economic burden for health care systems all over the world. Patients with AF could benefit from screening through mobile health (mHealth) devices. Thus, an early diagnosis is possible with mHealth devices, and the risk for stroke can be markedly reduced by using anticoagulation therapy. OBJECTIVE The aim of this work was to assess the cost-effectiveness of algorithm-based screening for AF with the aid of photoplethysmography wrist-worn mHealth devices. Even if prevented strokes and prevented deaths from stroke are the most relevant patient outcomes, direct costs were defined as the primary outcome. METHODS A Monte Carlo simulation was conducted based on a developed state-transition model; 30,000 patients for each CHA<sub>2</sub>DS<sub>2</sub>-VASc (Congestive heart failure, Hypertension, Age≥75 years, Diabetes mellitus, Stroke, Vascular disease, Age 65-74 years, Sex category [female]) score from 1 to 9 were simulated. The first simulation served to estimate the economic burden of AF without the use of mHealth devices. The second simulation served to simulate the economic burden of AF with the use of mHealth devices. Afterwards, the groups were compared in terms of costs, prevented strokes, and deaths from strokes. RESULTS The CHA<sub>2</sub>DS<sub>2</sub>-VASc score as well as the electrocardiography (ECG) confirmation rate had the biggest impact on costs as well as number of strokes. The higher the risk score, the lower were the costs per prevented stroke. Higher ECG confirmation rates intensified this effect. The effect was not seen in groups with lower risk scores. Over 10 years, the use of mHealth (assuming a 75% ECG confirmation rate) resulted in additional costs (€1=US $1.12) of €441, €567, €536, €520, €606, €625, €623, €692, and €847 per patient for a CHA<sub>2</sub>DS<sub>2</sub>-VASc score of 1 to 9, respectively. The number of prevented strokes tended to be higher in groups with high risk for stroke. Higher ECG confirmation rates led to higher numbers of prevented strokes. The use of mHealth (assuming a 75% ECG confirmation rate) resulted in 25 (7), –68 (–54), 98 (–5), 266 (182), 346 (271), 642 (440), 722 (599), 1111 (815), and 1116 (928) prevented strokes (fatal) for CHA<sub>2</sub>DS<sub>2</sub>-VASc score of 1 to 9, respectively. Higher device accuracy in terms of sensitivity led to even more prevented fatal strokes. CONCLUSIONS The use of mHealth devices to screen for AF leads to increased costs but also a reduction in the incidence of stroke. In particular, in patients with high CHA<sub>2</sub>DS<sub>2</sub>-VASc scores, the risk for stroke and death from stroke can be markedly reduced.


Author(s):  
A. Fihani ◽  
Hasyim Hasyim ◽  
I.D.M.A. Karyawan

The Street-Race Circuit is being built in the Mandalika Tourism Special Economic Zone (KEK), Central Lombok, West Nusa Tenggara. The construction is targeted to be completed, before the MotoGP event on this circuit is implemented in 2021. One of the infrastructure related to this, which also really needs to be built to support the smooth running of the 2021 MotoGP is the development of access to the circuit location. The analysis carried out includes the calculation of heavy equipment productivity. Heavy equipment productivity is determined based on cycle times, production per hour, number of heavy equipment used, the amount of operating costs per hour. The analysis was carried out for the road surface layer work, namely the Asphalt Concrete Base Course (AC-BC) work. Based on the results of the analysis, it was found that the production for 1 unit of asphalt mixing plant (AMP) was 49.80 tons/hour and 9 units of dump trucks were 2.34 tons/hour. The spreader using the asphalt finisher can spread 109.18 tons/hour. As for the compactor, which is 18.55 tons/hour for 2 units of tandem rollers and 27.47 tons/hour for 1 unit of pneumatic tire roller. Other equipment is 9.96 m2/hour for air compressor and 2.74 liter/hour for asphalt sprayer. Meanwhile, in the Asphalt Concrete Wearing Course (AC-WC) work, several tools have the same productivity as the AC-BC job, namely asphalt mixing plant, air compressor and asphalt sprayer. Meanwhile, 13 units of Dump Trucks amounted to 2,338 tons/hour, 1 unit of asphalt finisher of 72,787 tons/hour, 3 units of tandem rollers of 12,367 tons/hour, and 1 unit of pneumatic tire roller of 18.31 tons/hour. The total cost of using heavy equipment for road surface layer work is Rp. 4,967,657,344. The total cost based on the contract document is Rp. 5,042,082,622. So that there is a difference in costs of Rp. 74,425,278.


Sign in / Sign up

Export Citation Format

Share Document