scholarly journals CAPACITY ASSESSMENT OF THE SYSTEM OF GAS PIPELINES, RECEIVING AND TRANSPORTING GAS OF INLAND PRODUCTION

2019 ◽  
Vol 1 ◽  
pp. 13-21
Author(s):  
Petro Gorin ◽  
Dmytro Tymkiv ◽  
Viktoriia Romanova ◽  
Oleksandr Filipchuk

Today, the majority of gas fields in Ukraine are in the final stages of development, which is characterized by a significant decrease in wellhead pressure, as well as an increased gas-water factor. As is well known, when lowering wellhead pressure arises the problem of ensuring the design capacity of the gas production system as a whole. The main function of the gas pipeline system of the gas producing company of Ukraine is collection of gas from deposits and transport natural gas to consumers. Taking into account the tasks of ensuring the energy independence of Ukraine, as well as the program to build up gas of its own production, the question of assessing the capacity of the gas pipeline system remains relevant, performing the function of collection and transportation. As part of the research, the current state of the gas collection and transportation system is analyzed. The workload of gas pipeline sections in the chain from the wellhead to the consumer is investigated. As a result, it is established that the initial sections of the gas production system are fully loaded. Areas that can be recharged are identified, as a result of which it will reduce the output pressure at the wellheads and stabilize hydrocarbon production. On the basis of the conducted research, it is revealed that one of the alternative methods of increasing the capacity of the gas production system at the initial sections is to increase the equivalent diameter and length of the system by building new gas pipelines. It is also found that the periodic cleaning of pipelines in existing parts of the system prevents the decrease in capacity. It has been established that reducing the backpressure of the system is possible only in conjunction with unloading the system by changing the flow directions, creating centralized gas collection points, as well as retrofitting existing booster compressor stations. The availability of data on the load on the gas transmission system will allow the gas producing company to plan the distribution of gas to areas with available free capacity, while ensuring an increase in the production of its own gas. As a result, when the gas is distributed to areas with partial load, it will prevent excessive pressure losses in the system, as well as provide optimal system operation conditions.

2015 ◽  
Vol 50 (1) ◽  
pp. 29-38 ◽  
Author(s):  
MS Shah ◽  
HMZ Hossain

Decline curve analysis of well no KTL-04 from the Kailashtila gas field in northeastern Bangladesh has been examined to identify their natural gas production optimization. KTL-04 is one of the major gas producing well of Kailashtila gas field which producing 16.00 mmscfd. Conventional gas production methods depend on enormous computational efforts since production systems from reservoir to a gathering point. The overall performance of a gas production system is determined by flow rate which is involved with system or wellbore components, reservoir pressure, separator pressure and wellhead pressure. Nodal analysis technique is used to performed gas production optimization of the overall performance of the production system. F.A.S.T. Virtu Well™ analysis suggested that declining reservoir pressure 3346.8, 3299.5, 3285.6 and 3269.3 psi(a) while signifying wellhead pressure with no changing of tubing diameter and skin factor thus daily gas production capacity is optimized to 19.637, 24.198, 25.469, and 26.922 mmscfd, respectively.Bangladesh J. Sci. Ind. Res. 50(1), 29-38, 2015


Sensors ◽  
2020 ◽  
Vol 20 (19) ◽  
pp. 5708 ◽  
Author(s):  
Zahra Mahmoodzadeh ◽  
Keo-Yuan Wu ◽  
Enrique Lopez Droguett ◽  
Ali Mosleh

Gas pipeline systems are one of the largest energy infrastructures in the world and are known to be very efficient and reliable. However, this does not mean they are prone to no risk. Corrosion is a significant problem in gas pipelines that imposes large risks such as ruptures and leakage to the environment and the pipeline system. Therefore, various maintenance actions are performed routinely to ensure the integrity of the pipelines. The costs of the corrosion-related maintenance actions are a significant portion of the pipeline’s operation and maintenance costs, and minimizing this large cost is a highly compelling subject that has been addressed by many studies. In this paper, we investigate the benefits of applying reinforcement learning (RL) techniques to the corrosion-related maintenance management of dry gas pipelines. We first address the rising need for a simulated testbed by proposing a test bench that models corrosion degradation while interacting with the maintenance decision-maker within the RL environment. Second, we propose a condition-based maintenance management approach that leverages a data-driven RL decision-making methodology. An RL maintenance scheduler is applied to the proposed test bench, and the results show that applying the proposed condition-based maintenance management technique can reduce up to 58% of the maintenance costs compared to a periodic maintenance policy while securing pipeline reliability.


2013 ◽  
Vol 827 ◽  
pp. 112-117
Author(s):  
Deng Feng Zheng

For long distance oil and gas pipeline system has the characteristics of high accident rate tending to happen in personnel job activity, this paper expounds the necessity and application steps of HAZOP (Hazard and Operability Analysis) analysis for long-distance pipeline system key operation procedure (SOP). The HAZAOP analysis of deviation, causes of deviation, consequences, existing control measures and recommending measures, make the key operating procedure safer, and also contributes to the improvement of the oil and gas pipeline system safety and fitness between operating procedures and hardware facilities. The results of application examples show that HAZOP is able to identify key operating procedure loopholes, helps enterprises optimize key operating procedures, improves the hardware facilities, and has an important role to improve the security of the key operation of oil and gas pipelines.


2018 ◽  
Vol 5 ◽  
pp. 11-26
Author(s):  
Oleksandr Filipchuk ◽  
Victor Marushchenko ◽  
Mikhailo Bratakh ◽  
Myroslav Savchuk ◽  
Safaa Tarwat

To date, Ukraine's mature gas fields, which are being developed in the gas regime, are at the final stage of development, which is characterized by a significant depletion of reservoir energy. The final stage of development requires solving complex problems related to watering wells, destruction of the reservoir, removal of formation water and mechanical impurities, increasing back pressure in the system, as well as the moral and physical wear and tear of industrial equipment. In the conditions of falling gas production, a significant part of the operating well stock is unstable, in the mode of unauthorized stops due to the accumulation of liquid at the bottom and insufficient gas velocities for removal to the surface, and also the accumulation of the liquid phase in the lowered places of the gas gathering system. Within the framework of the conducted studies, the gas dynamic models of the operation of the gas collection system of 3 oil/gas-condensate fields (OGCF) are created. A single model of the gas production system "reservoir - well - gas gathering system - inter-field gas pipeline - main facilities" is built. The current efficiency of the gas production, collection and transportation system is assessed. On the basis of model calculations, the current production capabilities of the wells are defined, as well as the "narrow" places of the system. It is established that the introduction of modern technologies for the operation of watered wells without optimizing the operation of the entire gas production system is irrational, since the liquid that is carried out from the wellbore will accumulate in the plumes and increase the back pressure level in the ground part. In conditions of increasing gas sampling, liquid flowlines can be taken out of the loops and deactivated the separation equipment. The feasibility of introducing methods for optimizing the operation modes of the gas production - gathering and transportation system is estimated, which allows choosing the optimal method for increasing the efficiency and reliability of its operation. For the first time in the Ukrainian gas industry, an integrated model of the field is created as a single chain of extraction, collection, preparation and transportation of natural gas, which can be adapted for the development and arrangement of both new and mature deposits. The main advantage of the application for the hydrocarbon production sector is the simulation of the processes, which makes it possible to evaluate the operating mode of the well in the safe zone while reducing the working pressure and introducing various intensification methods, and also to estimate the increase in hydrocarbon production. For the equipment of the ground infrastructure – "midstream" – the main advantage is a reduction in the time required to perform design calculations for gas pipelines, trains and pipelines for transporting multiphase media using public models. The creation and use of integrated models of gas fields gives an understanding of the integral picture of available resources and ensures an increase in the efficiency of field development management. The results of the calculation are clearly correlated with the actual data, which makes it possible to use the models constructed to obtain numerical results.


2019 ◽  
pp. 93-99
Author(s):  
S. V. Kitaev ◽  
N. M. Darsalia ◽  
I. R. Baykov ◽  
O. V. Smorodova

The gas pipeline system of PJSC «Gazprom» is at the stage of long-term operation. Most of the pipelines exceed the standard service life of 33 years, while considerable resources are required to maintain the trunk gas pipelines in an efficient state. The article analyzes the defectiveness of gas mains by the example of LLC «Gazprom transgaz Ufa». The company’s gas pipeline system consists of a wide range of diameters pipes ranging from DN 400 to DN 1400 mm. Its structure is dominated by pipelines with a diameter of DN 400, 500, 700, 1400 mm, which share exceeds 86 %. An integral Gini index is proposed for monitoring the differentiation of defects along the length of the line pipe of the main gas pipelines. By the value of the proposed indicator, it is possible to analyze and compare the sections of gas pipelines among themselves, to identify the signs that affect the development of defects along the line pipe of the main gas pipelines.


Author(s):  
Mohadese Jahanian ◽  
Amin Ramezani ◽  
Ali Moarefianpour ◽  
Mahdi Aliari Shouredeli

One of the most significant systems that can be expressed by partial differential equations (PDEs) is the transmission pipeline system. To avoid the accidents that originated from oil and gas pipeline leakage, the exact location and quantity of leakage are required to be recognized. The designed goal is a leakage diagnosis based on the system model and the use of real data provided by transmission line systems. Nonlinear equations of the system have been extracted employing continuity and momentum equations. In this paper, the extended Kalman filter (EKF) is used to detect and locate the leakage and to attenuate the negative effects of measurement and process noises. Besides, a robust extended Kalman filter (REKF) is applied to compensate for the effect of parameter uncertainty. The quantity and the location of the occurred leakage are estimated along the pipeline. Simulation results show that REKF has better estimations of the leak and its location as compared with that of EKF. This filter is robust against process noise, measurement noise, parameter uncertainties, and guarantees a higher limit for the covariance of state estimation error as well. It is remarkable that simulation results are evaluated by OLGA software.


Author(s):  
Aleksandar Tomic ◽  
Shahani Kariyawasam

A lethality zone due to an ignited natural gas release is often used to characterize the consequences of a pipeline rupture. A 1% lethality zone defines a zone where the lethality to a human is greater than or equal to 1%. The boundary of the zone is defined by the distance (from the point of rupture) at which the probability of lethality is 1%. Currently in the gas pipeline industry, the most detailed and validated method for calculating this zone is embodied in the PIPESAFE software. PIPESAFE is a software tool developed by a joint industry group for undertaking quantitative risk assessments of natural gas pipelines. PIPESAFE consequence models have been verified in laboratory experiments, full scale tests, and actual failures, and have been extensively used over the past 10–15 years for quantitative risk calculations. The primary advantage of using PIPESAFE is it allows for accurate estimation of the likelihood of lethality inside the impacted zone (i.e. receptors such as structures closer to the failure are subject to appropriately higher lethality percentages). Potential Impact Radius (PIR) is defined as the zone in which the extent of property damage and serious or fatal injury would be expected to be significant. It corresponds to the 1% lethality zone for a natural gas pipeline of a certain diameter and pressure when thermal radiation and exposure are taken into account. PIR is one of the two methods used to identify HCAs in US (49 CFR 192.903). Since PIR is a widely used parameter and given that it can be interpreted to delineate a 1% lethality zone, it is important to understand how PIR compares to the more accurate estimation of the lethality zones for different diameters and operating pressures. In previous internal studies, it was found that PIR, when compared to the more detailed measures of the 1% lethality zone, could be highly conservative. This conservatism could be beneficial from a safety perspective, however it is adding additional costs and reducing the efficiency of the integrity management process. Therefore, the goal of this study is to determine when PIR is overly conservative and to determine a way to address this conservatism. In order to assess its accuracy, PIR was compared to a more accurate measure of the 1% lethality zone, calculated by PIPESAFE, for a range of different operating pressures and line diameters. Upon comparison of the distances calculated through the application of PIR and PIPESAFE, it was observed that for large diameters pipelines the distances calculated by PIR are slightly conservative, and that this conservativeness increases exponentially for smaller diameter lines. The explanation for the conservatism of the PIR for small diameter pipelines is the higher wall friction forces per volume transported in smaller diameter lines. When these higher friction forces are not accounted for it leads to overestimation of the effective outflow rate (a product of the initial flow rate and the decay factor) which subsequently leads to the overestimation of the impact radius. Since the effective outflow rate is a function of both line pressure and diameter, a simple relationship is proposed to make the decay factor a function of these two variables to correct the excess conservatism for small diameter pipelines.


2021 ◽  
Vol 99 (Supplement_3) ◽  
pp. 182-182
Author(s):  
Marjorie A Killerby ◽  
Diego Zamudio ◽  
Kaycee Ames ◽  
Darren D Henry ◽  
Thomas Schwartz ◽  
...  

Abstract This study evaluated the effects of preservatives on the in vitro fermentation measures of wet brewer’s grain (WBG) silage at different stages of storage. Treatments (TRT) were sodium lignosulfonate at 1% (NaL1) and 2% (NaL2; w/w of fresh WBG), propionic acid (PRP; 0.5% w/w of fresh WBG), a combination inoculant (INO; Lactococcus lactis and Lactobacillus buchneri each at 4.9 log cfu/fresh WBG g), and untreated WBG (CON). WBG (Fresh) were packed into 8.8 L mini-silos and stored for 60 d at 21°C (Ensiled), then they were opened and aerobically exposed for 10d (AES). Samples from each stage of storage (STG; Fresh, Ensiled and AES) were analyzed for in vitro ruminal digestibility (24 h).Gas kinetics were recorded using the Ankom RF Gas Production System. Data were analyzed as a randomized complete block design (5 blocks) with a 5 (TRT) × 3 (STG) factorial arrangement. Apparent in vitro DM digestibility (DMD) decreased across STG, (51.5, 47.2 and 40.9 for Fresh, Ensiled and AES, respectively) and increased for NaL1, NaL2 and PRP (~47.8) vs. CON (43.0 ± 2.12%). PRP increased apparent in vitro OM digestibility (OMD) when Ensiled (54.5) and NaL2 increased it for AES (47.1) vs CON (46.3 and 39.9 ± 1.73%, respectively). The asymptotic maximal (M) and rate (k) of gas production decreased across STG (214.6, 181.5, 155.1 and 14.6, 12.6, and 9.8, for Fresh, Ensiled and AES, respectively). PRP increased (200.0) and NaL1 decreased (169.3) M vs. CON (183.9± 7.81ml/incubated DM g), while NaL1 and NaL2 (~11.4) decreased k vs. CON (13.4 ± 0.85%/h). Methane concentration and yield were higher in Fresh vs. other STG (0.94 vs. ~0.84 ± 0.07mM and 0.27 vs. ~0.23 ± 0.03mmol/g fermented OM). Spoilage of WBG decreases fermentability and methane production while PRP and NaL improve digestibility with the former also increasing M and k.


Author(s):  
A.I. Pashentsev ◽  
A.A. Garmider

The author’s vision of the methodological aspect of assessing the reliability of medium pressure gas pipelines is presented. Analysis of existing methods for assessing the reliability of gas pipelines with the identification of positive and negative features was carried out, a methodological approach to assessing the reliability of medium pressure gas pipelines by gas flow rate and pressure was developed and tested, and a scale for identifying the results of reliability calculation was developed. The test conducted on the example of a really working gas pipeline with a test for reliability showed its promise.