scholarly journals METHOD OF ADAPTATION OF RISE OF GAS-WATER CONTACT OF GAS FIELDS

2017 ◽  
pp. 84-88
Author(s):  
Z. N. Shandrygolov ◽  
Yu. A. Arkhipov ◽  
N. V. Gumerova ◽  
K. K. Kurin ◽  
M. V. Morev

The results of development of the method for adapting the rise of gas-water contact by adjusting the for-mation anisotropy based on actual well measurements are presented. The efficiency of the applied method is shown in the example of Yubileinyoe gas field.

Author(s):  
Tri Firmanto ◽  
Muhammad Taufiq Fathaddin ◽  
R. S. Trijana Kartoatmodjo

<em>T field is a producting gas field in North Bali PSC, which currently producing 210 mmscfd from paciran sand stone formation. Paciran formation extends more than 20 km across the PSC area, which consists of 3 developed gas fields and one potential development field.  The flowing material balance analysis conducted on T field suggests possibility of reservoir connectivty between this field and its neighboring fields. Even though each field is already have a well defined Gas Water Contact, a thorough investigation was done using hyrdodynamic potential analysis to see if theres any hydrodynamic potential that allowed connectivity between these fields, and enable tilted contact occurred between these field. Using pressure data taken from each fields exploration wells the analysis can be conducted that conclude that there is an existing hydrodynamic potential between gas fields in paciran formation. A review on the tilted contact analysis concludes that the existing hydrodynamic potential is not enough to tilt the contact as per actually observed contact</em>.


2020 ◽  
Vol 39 (7) ◽  
pp. 464-470
Author(s):  
Benjamin Peterson ◽  
André Gerhardt

Seismic 4D monitoring technology has not been as widely employed for gas fields as it has for oil. Many gas fields rely on depletion drive, which has a 4D seismic response that can be uncertain and difficult to predict. On the other hand, aquifer-supported gas fields with measurable water ingress have a reasonable chance of success in terms of generating an interpretable 4D amplitude signal. Pluto gas field in the North West Shelf of Australia falls into this category. Following discovery in 2005, Pluto was appraised by five wells, which found a consistent gas gradient and gas-water contact across the entire field and its various reservoirs. Gas production began in 2012. Time-lapse seismic feasibility studies concluded that gas-saturation changes could be observed with a monitor seismic survey acquired three to four years after first gas. The Pluto 4D Monitor 1 survey was acquired at the start of 2016 and revealed both hardening and softening anomalies. Hardening is interpreted as water ingress (expected) and softening as gas expansion (unexpected). The Pluto 4D results provided important insights into reservoir connectivity and discontinuities. Large hardening anomalies at the TR27 (lower) level can be clearly seen in the data, showing avenues for water ingress. More importantly, a large softening anomaly below the original gas-water contact in the TR29 (upper) reservoir is interpreted to be gas expansion into the aquifer created by a U-tubing effect around a possible barrier in the gas leg. This suggests that the entire TR29 reservoir may not be accessed by the producing PLA04 well. Based on this 4D interpretation, the PLA07 well was drilled and completed in 2019 to produce the TR29 gas updip from the gas expansion anomaly and to increase Pluto field recovery.


1992 ◽  
Vol 32 (1) ◽  
pp. 67 ◽  
Author(s):  
K. A. Parker

The discoveries of the Katnook Field and, later, the Ladbroke Grove Field were significant milestones for hydrocarbon exploration in the southeast of South Australia as well as for the Otway Basin in general. The initial 1987 discovery at Katnook-1 of a relatively shallow gas accumulation in the basal part of the Eumeralla Formation was eclipsed in late 1988 at the Katnook-2 appraisal stage where deeper and more significant gas reserves were discovered in the Pretty Hill Sandstone.Technological improvement, in seismic acquisition, in particular, use of longer offset configurations and higher fold, and in filtering and correction techniques at the processing stage, are discussed in relation to improved geologic understanding. These aspects ultimately led to drilling success in both exploration and appraisal.At the deep Katnook discovery stage several significant problem areas remained unresolved. These related to uncertainties in vertical distribution of gas pay, level of a gas-water contact, and unreliable reserve estimates the result of the inability of conventional log analysis techniques to distinguish gas-bearing from water-bearing sands. Both in the evaluation of Katnook-2 and at the Katnook-3 appraisal stage, expensive cased-hole testing programs were undertaken to determine the size, extent and producibility of the gas accumulation. A key development between drilling Katnook-2 and Katnook-3 was the discovery of carbon dioxide-rich gas at Ladbroke Grove during 1989 in an adjacent structure to the south.The Katnook Field was the first commercial gas field development in the southeast, South Australian part of the Otway Basin, with gas sales commencing in March 1991, within a year of completing field appraisal. The discoveries, and subsequent development, have led to a renewed focus on the Otway Basin as a prospective hydrocarbon province.


Author(s):  
Vitaly P. Kosyakov ◽  
Amir A. Gubaidullin ◽  
Dmitry Yu. Legostaev

This article presents an approach aimed at the sequential application of mathematical models of different complexity (simple to complex) for modeling the development of a gas field. The proposed methodology allows the use of simple models as regularizers for the more complex ones. The main purpose of the applied mathematical models is to describe the energy state of the reservoir&nbsp;— reservoir pressure. In this paper, we propose an algorithm for adapting the model, which allows constructing reservoir pressure maps for the gas field, as well as estimating the dynamics of reservoir pressure with a possible output for determining the position of the gas-water contact level.


2014 ◽  
Vol 1073-1076 ◽  
pp. 2244-2247
Author(s):  
Hu Sun ◽  
Zhi Jun Ning ◽  
Zu Wen Wang ◽  
Zhen Li ◽  
Zhi Guo Wang

Erosion is a main failure of tubings and downhole tools in Changqing gas field. It is necessary to evaluate the erosion rate for the safety of tubing and strings. In this paper, the erosion of P110 steel, in the 0.2%wt guar gum fracturing fluid which contains sands, is investigated by weight loss method in the self-made jet experiment device. It is indicated that the erosion rate increases with the increment of slurry velocity exponentially. When the slurry velocity is in low velocity area, the electrochemical corrosion of dissolved oxygen dominates in erosion mechanism; when slurry velocity increases into middle velocity area, the weight loss is controlled by the synergism of corrosion-erosion; and when the slurry velocity increases into high velocity area, the weight loss rate is dominantly depended on erosion of particles. The results can provide guidelines for large-scale fracturing work of Changqing gas fields.


2021 ◽  
Author(s):  
Tran Nguyet Ngo ◽  
Lee Thomas ◽  
Kavitha Raghavendra ◽  
Terry Wood

Abstract Transporting large volumes of gas over long distances from further and deeper waters remains a significant challenge in making remote offshore gas field developments technologically and economically viable. The conventional development options include subsea compression, floating topside with topside compression and pipeline tie-back to shore, or floating liquefied natural gas vessels. However, these options are CAPEX and OPEX intensive and require high energy consumption. Demand for a lower emission solution is increasingly seen as the growing trend of global energy transition. Pseudo Dry Gas (PDG) technology is being developed by Intecsea, Worley Group and The Oil & Gas Technology Centre (Aberdeen) and tested in collaboration with Cranfield University. This is applied to develop stranded or remote gas reserves by removing fluids at the earliest point of accumulation at multiple locations, resulting in near dry gas performance. This technology aims to solve liquid management issues and subsequently allows for energy efficient transportation of the subsea gas enabling dramatic reductions in emissions. The PDG prototype tested using the Flow Loop facilities at Cranfield University has demonstrated the concept’s feasibility. Due to a greater amount of gas recovered with a much lower power requirement, the CO2 emissions per ton of gas produced via the PDG concept is by an order of magnitude lower than conventional methods. This study showed a reduction of 65% to 80% against standard and alternative near future development options. The paper considers innovative technology and a value proposition for the Pseudo Dry Gas concept based on a benchmarked study of a remote offshore gas field. The basin was located in 2000m of water depth, with a 200km long subsea tie-back. To date the longest tieback studied was 350km. It focused on energy consumption and carbon emission aspects. The conclusion is that decarbonisation of energy consumption is technically possible and can be deployed subsea to help meet this future challenge and push the envelope of subsea gas tie-backs.


Methane ◽  
2021 ◽  
Vol 1 (1) ◽  
pp. 24-37
Author(s):  
Muhammad Alfiza Farhan ◽  
Yuichi Sugai ◽  
Nuhindro Priagung Widodo ◽  
Syafrizal Syafrizal

The leakage of methane from the subsurface on the coalfield or natural gas field invariably becomes an important issue nowadays. In notable addition, materials such as activated carbon, zeolites, and Porapak have been successfully identified as adsorbents. Those adsorbents could adsorb methane at atmospheric pressure and room temperature. Therefore, in this scholarly study, a new method using adsorbents to detect points of methane leakage that can cover a wide-scale area was developed. In the beginning, the most capable adsorbent should be determined by quantifying adsorbed methane amount. Furthermore, checking the possibility of adsorption in the column diffusion and desorption method of adsorbents is equally necessary. The most capable adsorbent was activated carbon (AC), which can adsorb 1.187 × 10−3 mg-CH4/g-AC. Hereinafter, activated carbon successfully can adsorb methane through column diffusion, which simulates the situation of on-site measurement. The specific amount of adsorbed methane when the initial concentrations of CH4 in a bag were 200 ppm, 100 ppm, and 50 ppm was found to be 0.818 × 10−3 mg-CH4/g-AC, 0.397 × 10−3 mg-CH4/g-AC, 0.161 × 10−3 mg-CH4/g-AC, respectively. Desorption of activated carbon analysis shows that methane concentration increases during an hour in the temperature bath under 80 °C. In conclusion, soil methane leakage points can be detected using activated carbon by identifying the observed methane concentration increase.


2011 ◽  
Vol 51 (2) ◽  
pp. 684
Author(s):  
Peter Cook ◽  
Yildiray Cinar ◽  
Guy Allinson ◽  
Charles Jenkins ◽  
Sandeep Sharma ◽  
...  

Successful completion of the first stage of the CO2CRC Otway Project demonstrated safe and effective CO2 storage in the Naylor depleted gas field and confirmed our ability to model and monitor subsurface behaviour of CO2. It also provided information of potential relevance to CO2 enhanced gas recovery (EGR) and to opportunities for CO2 storage in depleted gas fields. Given the high CO2 concentration of many gas fields in the region, it is important to consider opportunities for integrating gas production, CO2 storage in depleted gas fields, and CO2-EGR optimisation within a production schedule. The use of CO2-EGR may provide benefits through the recovery of additional gas resources and a financial offset to the cost of geological storage of CO2 from gas processing or other anthropogenic sources, given a future price on carbon. Globally, proven conventional gas reserves are 185 trillion m3 (BP Statistical Review, 2009). Using these figures and Otway results, a replacement efficiency of 60 % (% of pore space available for CO2 storage following gas production) indicates a global potential storage capacity—in already depleted plus reserves—of approximately 750 Gigatonnes of CO2. While much of this may not be accessible for technical or economic reasons, it is equivalent to more than 60 years of total global stationary emissions. This suggests that not only gas—as a lower carbon fuel—but also depleted gas fields, have a major role to play in decreasing CO2 emissions worldwide.


1995 ◽  
Vol 35 (1) ◽  
pp. 405 ◽  
Author(s):  
C.W. Luxton ◽  
S. T. Horan ◽  
D.L. Pickavance ◽  
M.S. Durham.

In the past 100 years of hydrocarbon exploration in the Otway Basin more than 170 exploration wells have been drilled. Prior to 1993, success was limited to small onshore gas fields. In early 1993, the La Bella-1 and Minerva-1 wells discovered significant volumes of gas in Late Cretaceous sandstones within permits VIC/P30 and VIC/P31 in the offshore Otway Basin. They are the largest discoveries to date in the basin and have enabled new markets to be considered for Otway Basin gas. These discoveries were the culmination of a regional evaluation of the Otway Basin by BHP Petroleum which highlighted the prospectivity of VIC/P30 and VIC/P31. Key factors in this evaluation were:geochemical studies that indicated the presence of source rocks with the potential to generate both oil and gas;the development of a new reservoir/seal model; andimproved seismic data quality through reprocessing and new acquisition.La Bella-1 tested the southern fault block of a faulted anticlinal structure in the southeast corner of VIC/P30. Gas was discovered in two Late Cretaceous sandstone intervals of the Shipwreck Group (informal BHP Petroleum nomenclature). Reservoirs are of moderate to good quality and are sealed vertically, and by cross-fault seal, by Late Cretaceous claystones of the Sherbrook Group. The gas is believed to have been sourced from coals and shales of the Early Cretaceous Eumeralla Formation and the structure appears to be filled to spill as currently mapped. RFT samples recovered dry gas with 13 moI-% CO2 and minor amounts of condensate.Minerva-1 tested the northern fault block of a faulted anticline in the northwest corner of VIC/ P31. Gas was discovered in three excellent quality reservoir horizons within the Shipwreck Group. Late Cretaceous Shipwreck Group silty claystones provide vertical and cross-fault seal. The hydrocarbon source is similar to that for the La Bella accumulation and the structure appears to be filled to spill. A production test was carried out in the lower sand unit and flowed at a rig limited rate of 28.8 MMCFGD (0.81 Mm3/D) through a one-inch choke. The gas is composed mainly of methane, with minor amounts of condensate and 1.9 mol-% C02. Minerva-2A was drilled later in 1993 as an appraisal well to test the southern fault block of the structure to prove up sufficient reserves to pursue entry into developing gas markets. It encountered a similar reservoir unit of excellent quality, with a gas-water contact common with that of the northern block of the structure.The La Bella and Minerva gas discoveries have greatly enhanced the prospectivity of the offshore portion of the Otway Basin. The extension of known hydrocarbon accumulations from the onshore Port Campbell embayment to the La Bella-1 well location, 55 km offshore, demonstrates the potential of this portion of the basin.


Author(s):  
Hualei Yi ◽  
Yun Hao ◽  
Xiaohong Zhou

Abstract For deepwater subsea tie-back gas field development, hydrate tends to be formed in deepwater subsea production system and gas pipeline due to high pressure and low temperature. Based on the gas field A development, this paper studies the selection of hydrate inhibitors and injection points, i.e. different injection points with different inhibitors. Transient and steady flow simulations are performed using the OLGA software widely used for multiphase flow pipeline study in the world. The produced water flow rate affects the hydrate inhibition in case of well opening, including cases of different times with different water temperatures. This paper presents the calculation of the maximum inhibitor injection rate in the subsea pipeline by taking the whole production years into consideration. The measures on hydrate remediation are taken by quickly relieving the subsea pipeline pressure from wellheads and the platform according to different hydrate locations. Now more and more deepwater gas fields are developed in South China Sea and around the world. The experience obtained from the gas field A development will benefit the hydrate inhibition for future deepwater gas field development.