scholarly journals CLASSIFICATION AND OCCURRENCE OF DEFECTIVE ACTS IN RESIDENTIAL CONSTRUCTION PROJECTS

2014 ◽  
Vol 20 (2) ◽  
pp. 175-185 ◽  
Author(s):  
Hamad A. Aljassmi ◽  
Sangwon Han

Defects can have a significant impact on construction performance. Numerous studies have attempted to identify their root causes, contending that the prevention of defects could be achieved by eliminating the root causes. Yet, their direct causes also need to be considered in order to identify the sequence of events leading to defects. This study aims to classify the defective acts that are directly linked to the occurrence of a defect, in order to provide insights about the nature and the impact of different types of direct causes. The study involves investigation into 272 defects from 81 disputes that occurred in the Dubai residential construction industry in 2009. Results from this study reveal that the majority of construction defects are driven by a violation of practices or workers’ lack of skill and competence. While it is difficult to prevent deliberate violations, increased effort toward growing skills and competencies would be effective in reducing defects, and therefore improving construction performance. Also, classification of defective acts is envisioned as a platform toward a more thorough causal tracking of construction defects, facilitating the identification of latent conditions resulting in defects.

2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


Author(s):  
Florian Müller ◽  
Daniel Wenzl ◽  
Detlef Heck

The increasing complexity of construction projects has inevitably led to site managers are facing ever more complex claims. As a result, they are increasingly occupied with claim management. Their primary task, however, is to carry out the project and claim management is considered a secondary task. Furthermore, site managers often lack both the know-how and the resources required for handling complex claims. Attaining a successful outcome for a claim, demands stringent causal evidence for each single event linked to its effects. This makes documentation and quantification of a complex claim exceptionally difficult. Site managers tend to underestimate the complexity of a claim-causing event and as a consequence may often be too late in notifying internal company experts or external consultants focusing on claim management. This paper aims to categorize deviations causing a claim according to its complexity at the time of its occurrence. To do so, a quantitative survey was handed out to site managers in the Austrian construction industry. Based on the findings, the authors designed a decision-making matrix to classify claim-causing events according to their complexity. This will allow site managers to take necessary measures processing a claim and mitigate possible disputes.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.


Author(s):  
Tochukwu Moses ◽  
David Heesom ◽  
David Oloke

It is clear that challenging economic times inspire innovative abilities and solutions in the construction industry. In particular many of these innovations focus on cost implications, saving project time, reducing or eliminating waste, increasing productivity or redefining value. There is increasing pressure in the UK construction industry for new construction innovations, technology and processes with ability to lever a significant impact relative to disrupting the existing status quo; creating solutions that promote construction efficiencies deploying means to exploiting offsite construction approaches. The increased concern and challenge globally is that as knowledge and experience grows, the offsite manufacturers and suppliers are expected to demonstrate absolute innovative solutions that will heighten the proportion of project value being delivered through the use of offsite solutions on the bases that it makes sound project and business sense. Unparalleled huge cost saving benefits to clients and end users which is more than just creating a model is yet to be realized.


2021 ◽  
Vol 23 (08) ◽  
pp. 31-38
Author(s):  
Siddharth Jain ◽  

Construction 4.0 (a concept of Industry 4.0) is an ongoing transformation that aims at digitalization and automation of traditional construction and industrial practices using modern smart technology. The technological development especially of the construction sector is of utmost importance to meet the requirements of rapid construction projects aiming at quality work, increased productivity, and cost savings. One such technology that has come to the limelight is Virtual Reality (VR), which is a computer-generated smart environment that is artificially created using various types of hardware and software. This smart environment is created to resemble a real-life structure that can be explored, visualized, and interacted with by users using electronic devices for better decisionmaking before actual construction. The purpose of this paper is to design a Virtual Reality model using Building Information Modelling (BIM) and to examine the impact and influence of Virtual Reality Technology in the Indian construction industry with the help of a questionnaire survey. This study provides necessary information for implementing Virtual Reality technology in the construction industry. The results of this study provide a research road map to researchers for their future efforts.


2021 ◽  
Vol 14 (4) ◽  
pp. 50-61
Author(s):  
Hamsa R. Majeed ◽  
Wadhah A. Hatem ◽  
Nidal A. Jasem

In Iraq, the construction industry is considered one of the main sectors that contribute strongly to the Iraqi economy. Documentation is a process of collecting documents from past and current works of corporations, then archiving and classification of information to become easy and useful for reuse in the future. The aim of this study is to investigate the reality of documentation in the Iraqi construction industry and how to improve archiving and classification of documents and how documentation can be useful used in contractor and consultant corporations. This research has been conducted through literature reviews followed by a field survey. 80 questionnaires were distributed to contractors and engineering offices. 70 useful questionnaires were received from respondents with an 87% response rate. The findings indicated that the construction projects in the Diyala governorate are applying documentation. The study found that foundations classified and updating the documents as printed and written files and computer files, but foundations lack computer programs and web models for easy archiving and discovery of documents, documentation system currently used doesn't prevent Confusing, conflict in schemas because they still used Auto CAD and paper documentation.  The large number and accumulation of paper documents are also considered the most often problem in the documentation system currently used, and construction projects don't have a database for all information related to projects where, it is limited to cabinets full of paper documents, which causes a waste of time and effort when searching for any document or information related to the projects. The study recommended that companies and foundations have to increase cost and effort consumed in the documentation process, improve the owner and staff abilities in computer and web applications, assign a key person for collection and archiving project documents, establishing an internet website for companies, or using cloud applications for storage of documents and sharing information.


2021 ◽  
Vol 12 (2) ◽  
pp. 168-178
Author(s):  
Ajay Krishnan ◽  
Ajithkumar S ◽  
Manishankar G ◽  
Upendra K ◽  
Kabilan A ◽  
...  

In India, Project Portfolio Management (PPM) is in practice as a tool for prioritizing and managing real estate projects in construction organizations. But due to insufficient funding, improper judgment of experts during the crisis situation, the selection of optimal project portfolio prototype can be viewed as a risk based decision making process involving various risk factors. The objective of this study is to analyze the importance of project portfolio management and the risks associated with it in the construction industry taking into account the impact of novel corona virus COVID 19. This research identifies the adoption of more consistent project governance, risk management techniques and way more careful project portfolio management as the core area of study. A conceptual framework for Project Portfolio Management is also designed after analyzing various parameters of Project Portfolio Management of construction industry with the help of Bayesian framework. The key motive for undertaking this part of examination on real estate sector of Indian construction industry in southern part of India to reduce the impacts and increase the return on investment from the projects by mitigating the effect of risk factors associated in the projects.  Project Portfolio Management tools and techniques are very useful for managing multiple construction projects.


2005 ◽  
Vol 2 (1) ◽  
pp. 25 ◽  
Author(s):  
M.N. Jadid ◽  
M.M. Idress

Mobile computing technology has an enormous potential in civil engineering, mainly in the field of construction management. This paper presents an approach by using mobile computing in a civil engineering construction project, exploring how information can be exchanged at a construction site, and how billing of quantities (BOQ), drawings and specifications are shared for the benefit of the project. One of the major obstacles in using information technology (IT) when applied to civil engineering is due to the dynamic changes in the construction activities and the diversity of construction methods as compared to other industries. This has proved to be a great disadvantage when trying to give construction sites adequate IT support. Computers require infrastructure, which can be transferred easily to the head office, but rarely to the construction site itself in a systematic way. Therefore, the impact of IT on the way the construction industry actually works has not been significantly utilized. This paper consists of two main parts. The first part defines the concept of mobile computing, describes some recent research, and stresses the potential for the construction industry. The second part is focuses on an approach, implementing mobile computing in a real construction site. 


2021 ◽  
Vol 10 (40) ◽  
pp. 253-264
Author(s):  
Roman Sherstiuk ◽  
Eduard Malevski ◽  
Nataliia Marynenko ◽  
Olha Pavlykivska ◽  
Liliya Melnyk

In this paper, the authors demonstrated that the industrial enterprises development is impossible without evaluating changes that occur with technological and manufacturing sector enterprises by external and internal factors. As a result of this study on the ratio of different types of external and internal changes, the authors developed a classification of typical situations in which the technological and production sphere of the enterprise. To address the evaluation of changes in the paper developed a set of models assessing the impact of natural and artificial changes to enterprise development based on consideration of the consequences of different rates of technological and industrial areas researched the company and its competitors and provides a definition of the type of the current situation in which the industrial an enterprise that provides grounds for the development of appropriate strategies and measures for its development.


Author(s):  
Mousavi Dehmourdi, Seyed Ali ◽  
M. Gopal Naik ◽  
Ravande Kishore

The crisis in construction industry are deemed a negative event in the security, economic, political, materials, or natural affairs, especially when they occur abruptly, with little or no warning; and it has always caused damage, therefore crisis management is necessary to order not turn crisis into a disaster. The present study focuses on exploring the impact of the crisis in construction projects by offering a review of the literature to identify the various associated crisis and made a case study of ‟Khuzestan province (Iran). First, through a questionnaire survey with construction experts as respondents, the initial list of 222 sub-factors were confined to a list of 174 essential crisis sub factors and were grouped under 20 main crisis factors. Second, the shortlisted 174 essential crisis sub factors conduct a questionnaire-based survey with top experts from ‟Khuzestan province (Iran) construction organization as respondents to obtain the Importance of each sub factors based on the rating of its impact the second list and using CRITIC method to weighting crisis factors. Third, ranking the influential sub crisis factors from the all sub factor list and provide a single list without considering the initial list crisis through WASPAS model. Finally, The result of the crisis effects rating, seen that the most crisis effects rating in the Khuzestan construction industry is the economic crisis, followed by the market and real estate, and then insurance, maintenance, after that respectively, logistics, and materials crises. Identify the crisis is the main part of crisis management; the obtained results help construction crisis managers and all stakeholders to achieve sustainable development in construction projects. Identifying and prioritizing construction-specific crises allow sustainable crisis managers to concentrate to be successful projects.


Sign in / Sign up

Export Citation Format

Share Document