Abstract
To ensure that the gas concentration at the top corner does not exceed the limit, a reasonable level of the high drainage roadway layout in Jiaojiazhai Mine should be determined. In this work, based on the actual conditions of the working face, an SF6 tracer gas was used to test the connectivity between the high drainage roadway and the working face. A discrete element analysis program was used to simulate the deformation law of the overlying strata in the goaf, and a corresponding caving control program for the surrounding rock was written based on the obtained parameters and “O” ring theory. A fluid simulation software was used to simulate and analyze five goaf models with different high drainage roadway layouts (10, 15, 20, 25, and 30 m). The gas drainage data for two layers (10 m and 20 m) of the high drainage roadway were measured. The results showed that the height of the caving zone in the goaf is approximately 20 m, and when the high drainage roadway is arranged along the roof (when the layout layer height is 10 m), the roadway will be directly connected to the working face, thus pumping fresh air to the working face. The gas extraction effect of the 20 m stratum was better than those of the other strata. The simulation results of the gas extraction were consistent with the measured data. The proposed scheme was practically applied, and its effect was found to be evident, thus solving the problem of high gas concentration at the top corner and increasing the mine output.