Pre-Tension Losses in Cable Bolts and their Progress in Time

2020 ◽  
Vol 832 ◽  
pp. 73-80
Author(s):  
Pavel Dvorak

Bolting and anchoring products are mostly pre-tensioned after their putting into the construction. Pre-tensioning force is a force with clearly defined size and direction and helps the construction to transfer loads. After pre-tensioning a cable bolt some pre-tension losses occur immediately after releasing the jack and other losses progress during their working time. These losses may occur due to the mechanical properties of the cable bolt and its structure itself, but also due to the properties of the surrounding rock mass.The article deals with the enumeration and description of individual losses in accordance with applicable legislation and their measurements both in the laboratory and in actual mining conditions. The comparison of calculated and measured losses and a brief overview of pre-tensionable bolting technology within OKD coal deep mines is a part of the content as well. The result of the tests is quantification of these types of pre-tension losses including proposals for their reduction.

2015 ◽  
Vol 52 (10) ◽  
pp. 1490-1495 ◽  
Author(s):  
Naj Aziz ◽  
Ali Mirzaghorbanali ◽  
Jan Nemcik ◽  
Kay Heemann ◽  
Stefan Mayer

An experimental investigation into the performance of two 22 mm diameter, 60 t tensile strength capacity Hilti cable bolts in shear was conducted using the double-shear testing apparatus at the laboratory of the School of Civil, Mining and Environmental Engineering, Faculty of Engineering and Information Sciences, University of Wollongong. The tested cable bolts were (i) Hilti 19 wire HTT-UXG plain strand and (ii) Hilti 19 wire HTT-IXG spirally profiled (smaller cross-sectional area than the plain one) cable bolt, with indentation only on the surface of the outer strands. These cable bolts are of sealed wire construction type, consisting of an outer 5.5 mm diameter wire layer overlying the middle 3 mm diameter wire strands. Both layers are wrapped around a single solid 7 mm diameter strand wire core. The double-shearing test was carried out in 40 MPa concrete blocks, contained in concrete moulds. Cable bolts were encapsulated in concrete using Orica FB400 pumpable grout. Prior to encapsulation, each cable bolt was pre-tensioned initially to 50 kN axial force. A 500 t capacity servocontrolled compression testing machine was used for both tests, and during each test the vertical shear displacement was limited to 70 mm of travel. The rate of vertical shear displacement was maintained constant at 1 mm/min. The maximum shear load achieved for the plain strand cable was 1024 kN, while the spiral cable peak load was 904 kN, before the cable bolt wires began to individually snap, leading to the cable bolt break-up into two sections. It is apparent that spiral profiles of the outer wires weaken both the tensile and shearing strength. Finally, another set of tests was undertaken using the British Standard single-shear approach, producing lower shear strength values.


2021 ◽  
Author(s):  
Shengrong Xie ◽  
Yiyi Wu ◽  
Dongdong Chen ◽  
Ruipeng Liu ◽  
Xintao Han ◽  
...  

Abstract In deep underground mining, achieving stable support for roadways along with long service life is critical and the complex geological environment at such depths frequently presents a major challenge. Owing to the coupling action of multiple factors such as deep high stress, adjacent faults, cross-layer design, weak lithology, broken surrounding rock, variable cross-sections, wide sections up to 9.9 m, and clusters of nearby chambers, there was severe deformation and breakdown in the No. 10 intersection of the roadway of large-scale variable cross-section at the − 760 m level in the Nanfeng working area of the Wuyang Coal Mine. As there are insufficient examples in engineering methods pertaining to the geological environment described above, the numerical calculation model was oversimplified and support theory underdeveloped; therefore, it is imperative to develop an effective support system for the stability and sustenance of deep roadways. In this study, a quantitative analysis of the geological environment of the roadway through field observations, borehole peeking, and ground stress testing is carried out to establish the FLAC 3D variable cross-section crossing roadway model. This model is combined with the strain softening constitutive (surrounding rock) and Mohr-Coulomb constitutive (other deep rock formations) models to construct a compression arch mechanical model for deep soft rock, based on the quadratic parabolic Mohr criterion. An integrated control technology of bolting and grouting that is mainly composed of a high-strength hollow grouting cable bolt equipped with modified cement grouting materials and a high-elongation cable bolt is developed by analyzing the strengthening properties of the surrounding rock before and after bolting, based on the Heok-Brown criterion. As a result of on-site practice, the following conclusions are drawn: (1) The plastic zone of the roof of the cross roadway is approximately 6 m deep in this environment, the tectonic stress is nearly 30 MPa, and the surrounding rock is severely fractured. (2) The deformation of the roadway progressively increases from small to large cross-sections, almost doubling at the largest cross-section. The plastic zone is concentrated at the top plate and shoulder and decreases progressively from the two sides to the bottom corner. The range of stress concentration at the sides of the intersection roadway close to the passageway is wider and higher. (3) The 7 m-thick reinforced compression arch constructed under the strengthening support scheme has a bearing capacity enhanced by 1.8 to 2.3 times and increase in thickness of the bearing structure by 1.76 times as compared to the original scheme. (4) The increase in the mechanical parameters c and φ of the surrounding rock after anchoring causes a significant increase in σc and σt; the pulling force of the cable bolt beneath the new grouting material is more than twice that of ordinary cement grout, and according to the test, the supporting stress field shows that the 7.24 m surrounding rock is compacted and strengthened in addition to providing a strong foundation for the bolt (cable). On-site monitoring shows that the 60-day convergence is less than 30 mm, indicating that the stability control of the roadway is successful.


Metals ◽  
2019 ◽  
Vol 9 (3) ◽  
pp. 346 ◽  
Author(s):  
Jinpeng Zhang ◽  
Limin Liu ◽  
Jun Shao ◽  
Qinghai Li

The left-hand rolling-thread steel bolt has been proposed as a new bolt for controlling roadway surrounding rock. To explore the mechanism of a left-hand rolling-thread steel bolt in roadway surrounding rock control, its pretightening forces, tensile strengths, anchoring forces, and maximum working resistances were compared to normal right-hand full-thread steel bolts in the engineering context of the 1301 haulage roadway in the Daxing Coal Mine. Then, the left-hand threaded steel bolt was applied to the 1301 haulage roadway that the right-hand threaded steel bolt failed to control. The results indicated that due to the different effective tensile section area, the yield strength and tensile strength of the left-hand threaded steel bolt with the same material and diameter were more than 10% larger than those of the right-hand threaded steel bolt. Due to the different thread directions, the anchoring forces of the Φ18 and Φ20 left-hand threaded steel bolts were 46.2% and 33.3% greater than those of the right-hand threaded steel bolts, respectively. In the 1301 haulage roadway, the maximum pull-out force of the left-hand rolling-thread steel bolt with the same diameter was obviously greater than that of the right-hand full thread steel bolt. The displacements of the 1301 haulage roadway supported by the left-hand threaded steel bolt were not great. So, the left-hand threaded steel bolt can effectively control the surrounding rock in the 1301 haulage roadway.


Author(s):  
A. B. Petrovsky ◽  
V. Ya. Prushak ◽  
E. A. Lutovich

The geological structure and the physical-mechanical properties of rocks composing and overlapping the Third potash formation in the areas of the mine field mine No. 4 JSC Belaruskali, which are scheduled to practice, are studied. The geological sections of the Third potash layer and its roof were built, the thickness of sylvinite and halite layers was measured, the roof falling of the rocks of the layer with a height of up to 20 m was assessed, and the type of immediate roof was determined by the composition and structure of its constituent rocks. It was established that the strength under uniaxial compression of both sylvinite and halite layers for the areas under consideration differs slightly. Therefore, to solve engineering problems of ensuring the stability of mine workings and to calculate fastening parameters, strength values averaged over the groups of layers can be used that correlate well with the percentage of weak and clay interlayers. The same applies to Poisson’s ratio, the values of which for various layers of formation are slightly different and can be taken by their averaging. It is shown that the main factor that negatively affects the strength of rocks occurring in the roof of the Third potash seam is the presence of weak and clay interlayers, which increases with depth. The introduction of the obtained results allows us to improve the calculation accuracy of securing mining parameters, to reduce the costs of their maintenance, and to improve the safety of mining operations in developing the Third potash formation in complex geological and mining conditions.


2013 ◽  
Vol 353-356 ◽  
pp. 20-23
Author(s):  
Xiao Lei Wang ◽  
Shun Xi Yan ◽  
Guang Can Zhang

According to the problemsof serious deformation of soft rock roadways and lack of system andcomprehensive study on surrounding rock characteristics and failure mechanismin Shajihai mining area, this paper carried out a series of mechanicalexperiments on the characteristics of surrounding rock in this area includinguniaxial compression test, triaxial compression test and water absorption propertiestest. Mechanical test results show that the compressive strength of surroundingrock of roadway is generally low, and mudstone compressive strength is thelargest which is 19.23 MPa, and compressive strength of the minimum is coalwhich is 11.32 MPa under natural condition. However sandstone and mudstone’sability of water absorbing is strong, and coal saturation strength issignificantly greater than that of mudstone and sandstone. Therefore, we shouldmake full use of the strength of coal in roadway layout and support design.


2011 ◽  
Vol 243-249 ◽  
pp. 3399-3402
Author(s):  
Bin Li ◽  
Tai Yue Qi

Several numerical models were built by FLAC3D to simulate tunnel with karst around spandrel, tunnel with karst around springe, tunnel with karst around inverted arch and tunnel with karst around side wall. The influence of karsts on the deformation of lining and the safety coefficient distribution of surrounding rock after excavation was analyzed. The results from the numerical modeling suggest as follows: karst around spandrel has extremely unfavorable effect on the deformation of lining and the safety of surrounding rock above the vault, karst around side wall also seriously affect the stability of tunnel due to the asymmetry pressure on tunnel caused by karst, consequently, auxiliary measures should be taken to handle these two cases; karst around springe and karst around inverted arch has limited adverse influence on the overall safety of tunnel, backfill measures are enough to handle these two cases.


2013 ◽  
Vol 353-356 ◽  
pp. 1685-1688
Author(s):  
Li Na Ran ◽  
Hua Bin Zhang ◽  
Zhi Yin Wang

In order to determine the long-term mechanical properties of surrounding rock of salt cavern gas storage, long tri-axial creep test studies on rock salt of the field were carried out. Based on the test data, long-term strength of rock salt was determined, and comparatively analysis was conducted combined with of the instantaneous test. The study results show that: Considering the axial strain, radial strain and volumetric strain to determine the long-term strength of rock salt can ensure reliability of the results. Under the same condition, the less salt content, the value of long-term strength is higher. Tri-axial creep process has a different effect degree between cohesion and internal friction angle; it is more sensitive to cohesion. The strain limit should be considered for the stability analysis of multi-bedded salt cavern gas storage construction and pay more attention about the mechanical properties of the interlayer parts. The study results provide references for researching the surrounding rock long-term mechanical properties of salt cavern gas storage.


2019 ◽  
Vol 2019 ◽  
pp. 1-13
Author(s):  
Yanling Jia ◽  
Yongxu Xia ◽  
Xindong Chen ◽  
Yongdi Zhou ◽  
Xingbo Han ◽  
...  

At present, there are an ever-increasing number of tunnel expansion projects in China. Studying the mechanical properties of the expanded tunnels is of great significance for guiding their safe construction. Through model testing and numerical simulation, the mechanical properties of a double-arch tunnel constructed through the expansion of the middle pilot heading from an existing single-tube tunnel were studied. The variation characteristics of the surface subsidence, surrounding rock stress, and stress and strain of the middle partition wall and lining during the tunnel reconstruction and expansion were investigated. The mechanism for transferring stress and strain between the left and right tunnel tubes was studied by a numerical simulation method. The results showed that the surface subsidence caused by the excavation of the left (i.e., the subsequent) tunnel tube was larger, and the maximum surface subsidence occurred at the right (i.e., the first) tunnel tube. The surrounding rock on the middle wall was the sensitive part of the tunnel excavation, the stress of the surrounding rock at the left spandrel of the right tunnel tube fluctuated and exhibited the most complex variation, and the stress of the surrounding rock at the right spandrel of the left tunnel tube exhibited the largest variation. The excavation of the left tunnel tube had a great influence on the forces of the middle partition wall and the lining structure of the right tunnel tube, the middle partition wall was subjected to eccentric compression towards the left tunnel tube, and the stress at the left spandrel under the initial support of the right tunnel tube exhibited complex variations. The excavation of the left and right tunnel tubes had a great influence on the stability of the surrounding rock, as well as on the force-induced deformation of the middle partition wall and the support structure, within the width of the single tunnel tube span behind the tunnel working face. Due to the different construction sequences, the stress and strain at the symmetric measurement points of the middle partition wall, as well as the left and right tunnel support structures, were very different.